← Back
BuildNYC
QUEENS
43-35 57TH STREET
QUEENS · Woodside · BIN 4625909
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 11 docs
Floor 31 filing · 11 docs
Floor 21 filing · 11 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bicaluro Associates203/25/2026
Gerald Caliendo Architects112/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Caliendo Architects103/21/2026
Building Lifecycle
All (27)Filed (3)Objection (3)Special Inspection (21)
03/25/2026
Filed — New Building
Mechanical scope of work for new 7story residential building with 56 residential units. Filing includes installation of VRF systems, PTACs, RTUs, and toilet, kitchen, and refuse exhaust systems per NYC Mechanical Code.
Q01334547-S4
03/23/2026
Filed — New Building
Mechanical scope of work for new 7story residential building with 56 residential units. Filing includes installation of VRF systems, PTACs, RTUs, and toilet, kitchen, and refuse exhaust systems per NYC Mechanical Code.
Q01334547-S5
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/23/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
03/23/2026
Special inspection requirement — Maintenance information
03/17/2026
Special inspection requirement — Fenestration areas
03/17/2026
Special inspection requirement — Fenestration air leakage
02/12/2026
Objection raised — Energy
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Zoning
12/18/2025
Filed — New Building
Mechanical scope of work for new 7story residential building with 56 residential units. Filing includes installation of VRF systems, PTACs, RTUs, and toilet, kitchen, and refuse exhaust systems per NYC Mechanical Code.
Q01334547-I1
12/16/2025
Special inspection requirement — Air barrier continuity plan testing
12/16/2025
Special inspection requirement — Concrete - Cast-In-Place
12/16/2025
Special inspection requirement — Vestibules
12/16/2025
Special inspection requirement — Permanent certificate
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/16/2025
Special inspection requirement — Masonry
12/16/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
12/16/2025
Special inspection requirement — Protection of exposed foundation insulation
12/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
12/16/2025
Special inspection requirement — Air barrier - visual inspection
12/16/2025
Special inspection requirement — Maintenance information
12/16/2025
Special inspection requirement — Insulation placement and R values
Nothing on file for this building.
1 project · most recent 03/25/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ice Air 8RSNU13-H 11,900 BTU · Heat Pump Outdoor ×43
8RSNU09-H 9,600 BTU · Heat Pump Outdoor ×21
8RSNU18-H 16,600 BTU · Heat Pump Outdoor ×14
Mitsubishi Electric PUZ-AK12NL 12,000 BTU · Split System ×7
PUZ-AK18NL 18,000 BTU · Split System ×2
MXZ-SM36NLHZ 36,000 BTU · Split System ×1
Aaon RNA-016 172,200 BTU · Rooftop Unit ×1
1 project · most recent 03/25/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/25/2026——Storm, Water/Sanitary
1 project · most recent 03/25/2026
Steel Concrete
FiledStatusContractorScope
03/25/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
03/23/2026HVAC-R and service water heating equipment—energy_progress
03/23/2026HVAC-R and service water piping design and insulation—energy_progress
03/23/2026HVAC-R and service water heating system controls—energy_progress
03/23/2026Fire-Resistant Penetrations and Joints—special
03/23/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/23/2026Energy Code Compliance Inspections—progress
03/23/2026Maintenance information—energy_progress
03/17/2026Fenestration areas—energy_progress
03/17/2026Fenestration air leakage—energy_progress
12/16/2025Air barrier continuity plan testing—energy_progress
12/16/2025Concrete - Cast-In-Place—special
12/16/2025Vestibules—energy_progress
12/16/2025Permanent certificate—energy_progress
12/16/2025Fire-Resistant Penetrations and Joints—special
12/16/2025Masonry—special
12/16/2025Wall Panels, Curtain Walls, and Veneers—special
12/16/2025Protection of exposed foundation insulation—energy_progress
12/16/2025Fenestration and door U-factor and product ratings—energy_progress
12/16/2025Air barrier - visual inspection—energy_progress
12/16/2025Maintenance information—energy_progress
12/16/2025Insulation placement and R values—energy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01334547-S5Request digital key ↗
08/17/2026Q01334547-I1Request digital key ↗
08/17/2026Q01334547-S4Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01334547-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01334547-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026Q01334547-S4Open ↗
08/17/2026Q01334547-S5Open ↗
08/13/2026Q01334547-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01334547-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01334547-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01334547-I1Open ↗