← Back
BuildNYC
Two family frame
43-38 ELBERTSON STREET
QUEENS · Elmhurst · BIN 4039387
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R5Zoning
2,248 sfGross Floor Area
2Units
4 Active Violations ▸
Two family frame · 2,365 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 25p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Basement2p · 1 filing · 12 docs
Site & exterior2p · 1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/09/2022$1.1M—Private party → Private party$485/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Flushing408/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M2 Design803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Flushing One ConstructionGeneral Contractor107/08/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Flushing Engineering Service4373408/30/2022
Building Lifecycle
09/28/2022
Signed off — Alteration
INSTALL PLUBMING FIXTURES IN EXISTING TWO FAMILY. FILED IN COJ.WITH ALTERATION#Q00702189-I1. EXISTING TWO FAMILY TO BE REMAIN. NO CHANGE IN USE ,OCCUPANCY OR EGRESS.
Q00702190-I1
09/06/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING TWO FAMILY HOUSE IN CELLAR, 1ST AND 2ND FL.R . REPLACE PARTITIONS, DOORS, CEILING, AND INSTALL PLUMBING FIXTURES, ACCESSORY STAIR FOR 3 PCS BATHRM IN CELLAR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00702189-I1
09/02/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/31/2022
Special inspection requirement — Interior lighting power
KY FU
08/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
32 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFlushing One Construction04/25/2022
DOB NOWPlumbingSigned-offCatman Plumbing04/22/2022
1 project · most recent 05/06/2022
FiledStatusContractorScope
05/06/2022Permit IssuedP.L. Electrical Contracting—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/02/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/19/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/19/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/31/2022Interior lighting powerKY FUenergy_progress
08/31/2022Fire-Resistant Penetrations and JointsKY FUspecial
08/31/2022Maintenance informationKY FUenergy_progress
08/31/2022Structural Stability – Alterations of existing buildingsKY FUspecial
07/08/2022Fire-Resistant Penetrations and JointsKY FUspecial
07/08/2022Energy Code Compliance InspectionsKY FUprogress
06/23/2022Energy Code Compliance InspectionsKY FUprogress
06/23/2022Fire-Resistant Penetrations and JointsKY FUspecial
06/23/2022Structural Stability – Alterations of existing buildingsKY FUspecial
06/23/2022Maintenance informationKY FUenergy_progress
06/23/2022Interior lighting powerKY FUenergy_progress
06/23/2022Fire-Resistant Penetrations and JointsKY FUspecial
29 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account