← Back
Factory, light manufacturing
43-43 9 STREET
QUEENS · BIN 4441073
💬 Discuss this project
1940Year Built
1Stories
F5Building Class
M1-4AZoning
21,150 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: BENJAMIN REALTY INC · 18,574 sf lot · 1.14 FAR built · Flood zone X500
Locations of Work
MechanicalFire Protection
Roof2p · 1 filing · 20 docs
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SCHUMAN PROPERTIES1807/08/2026
SCHUMAN 43-53 10TH ST203/21/2026
BINJAMA REALTY403/21/2026
SCHUMAN 43-46 10TH STREET303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HNY CONSULTING ENGINEERS LLC706/10/2025
W. SCOTT FAY, ARCHITECT308/23/2024
JACK GREEN ASSOCIATES105/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO2003/21/2026
RETHY ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE ROCK CONSTRUCTION INGeneral Contractor607/08/2026
CMA PLUMBING & HEATING INFire Protection107/08/2026
FORTE EXPRESS P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827608/23/2024
JACK GREEN ASSOCIATES422105/07/2024
Building Lifecycle
All (53)Filed (11)Permit Issued (6)Signed Off (4)Violation (6)Inspection (7)Special Inspection (19)
04/10/2026
Violation issued (FDNY_ORDER, closed)
11/19/2025
Violation issued (FDNY_ORDER, closed)
09/16/2025
Violation issued (FDNY_ORDER, closed)
06/24/2025
Signed off — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-S2
06/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2025
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-P7
02/12/2025
Signed off — Alteration
Q01039758-I1
01/30/2025
Signed off — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-I1
01/30/2025
Signed off — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-S1
09/26/2024
Permit issued — Mechanical Systems
Q01014421-S1-MS
09/26/2024
Permit issued — General Construction
Q01014421-I1-GC
08/23/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-P4
08/23/2024
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
08/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
08/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
08/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
08/23/2024
Special inspection requirement — Sprayed fire-resistant materials
JONAR MADRIAGA
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
08/23/2024
Special inspection requirement — Final
JONAR MADRIAGA
08/23/2024
Special inspection requirement — Lighting controls
JONAR MADRIAGA
08/23/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
08/23/2024
Special inspection requirement — Final
JONAR MADRIAGA
08/23/2024
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
08/23/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
08/22/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-P6
08/22/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-P5
07/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2024
Permit issued — General Construction
Q01014421-I1-GC
07/16/2024
Permit issued — Mechanical Systems
Q01014421-S1-MS
07/02/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/20/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-P1
06/18/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-P3
06/18/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-P2
06/11/2024
Special inspection requirement — Final
JONAR MADRIAGA
06/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
06/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
06/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
06/11/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
06/11/2024
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
06/11/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
05/08/2024
Permit issued — Sprinklers
Q01039758-I1-EW-SP
05/07/2024
Filed — Alteration
Q01039758-I1
05/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/02/2024
Permit issued — Plumbing
Q01014421-S2-PL
04/05/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-S2
04/05/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-S1
03/29/2024
Filed — Alteration
Removal and installation of Mechanical devise and related ductwork as shown on drawings filed herewith. No change in occupancy, use, or egress.
Q01014421-I1
07/28/2022
Violation issued (FDNY_NOV, closed)
12/07/2016
Violation issued (FDNY_NOV, closed)
11/25/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBLUE ROCK CONSTRUCTION IN09/26/2024
DOB NOWGeneral ConstructionSigned-offBLUE ROCK CONSTRUCTION IN09/26/2024
DOB NOWGeneral ConstructionSigned-offBLUE ROCK CONSTRUCTION IN07/16/2024
DOB NOWMechanical SystemsSigned-offBLUE ROCK CONSTRUCTION IN07/16/2024
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN05/08/2024
DOB NOWPlumbingSigned-offFORTE EXPRESS P & H INC05/02/2024
BISOTISSUEDJA SALERNO SR. & SONS INC08/04/2017
BISOTISSUEDJA SALERNO SR. & SONS INC08/04/2017
BISFPISSUEDRELIABLE FIRE PROT. INC09/08/2016
BISPLISSUEDAARON PLBG AND MECH SYST08/29/2016
BISOTISSUEDJA SALERNO SR. & SONS INC08/25/2016
BISOTISSUEDJA SALERNO SR. & SONS INC07/21/2016
BISOTISSUEDKOFSKY & SON INC09/17/2012
BISPLRE-ISSUEDKOFSKY & SON, INC09/17/2012
BISOTISSUEDNICK'S CONTRACTING OF RIDGEWOOD11/02/2006
BISEQISSUEDMANETTA INDUSTRIES, INC04/01/2004
BISOTISSUEDMANETTA INDUSTRIES, INC04/01/2004
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/23/2024Interior lighting powerJONAR MADRIAGAenergy_progress
08/23/2024HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
08/23/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
08/23/2024HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
08/23/2024Sprayed fire-resistant materialsJONAR MADRIAGAspecial
08/23/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
08/23/2024FinalJONAR MADRIAGAprogress
08/23/2024Lighting controlsJONAR MADRIAGAenergy_progress
08/23/2024Mechanical SystemsJONAR MADRIAGAspecial
08/23/2024FinalJONAR MADRIAGAprogress
08/23/2024Shutoff dampersJONAR MADRIAGAenergy_progress
08/23/2024Maintenance informationJONAR MADRIAGAenergy_progress
06/11/2024FinalJONAR MADRIAGAprogress
06/11/2024HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
06/11/2024HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
06/11/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
06/11/2024Maintenance informationJONAR MADRIAGAenergy_progress
06/11/2024Shutoff dampersJONAR MADRIAGAenergy_progress
06/11/2024Mechanical SystemsJONAR MADRIAGAspecial
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/22/2026Q01039758-I1Request digital key ↗
08/21/2026Q01014421-S2Request digital key ↗
08/21/2026Q01014421-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION12
08/16/2017440336334Open ↗
08/16/2017440322740Open ↗
09/19/2016421361074Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
09/08/2017440336334Open ↗
06/21/2017440336334Open ↗
12/01/2016440336290Open ↗
Showing 3 of 12 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/22/2017440322740Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature15
09/06/2026Q01014421-P2Open ↗
09/06/2026Q01014421-P2Open ↗
09/06/2026Q01014421-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026Q01039758-I1Open ↗
08/21/2026Q01014421-S2Open ↗
08/21/2026Q01014421-S1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/22/2017440322740Open ↗
12/01/2016440336290Open ↗
09/19/2016421361074Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/06/2026Q01014421-P2Open ↗
08/23/2026Q01014421-I1Open ↗
08/23/2026Q01014421-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/17/2016440336334Open ↗
07/12/2016440322740Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/17/2016440336334Open ↗
07/12/2016440322740Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/17/2016440336334Open ↗
07/12/2016440322740Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/25/2012420624060Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/18/2012420624060Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/19/2016440336290Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING6
08/19/2016440336290Open ↗
08/17/2016440336334Open ↗
11/16/2012420624060Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/01/2016440336290Open ↗
09/08/2016440336334Open ↗
08/18/2016421361074Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/25/2012420624060Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/22/2026Q01039758-I1Open ↗
08/21/2026Q01014421-S2Open ↗
08/21/2026Q01014421-S1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
08/19/2016440336290Open ↗
08/18/2016421361074Open ↗
08/17/2016440336334Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/28/2017440322740Open ↗
09/25/2012420624060Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/17/2016440336334Open ↗
07/12/2016440322740Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/17/2016440336334Open ↗
07/12/2016440322740Open ↗
▸BISNYCECC ANALYSIS2
08/17/2016440336334Open ↗
07/12/2016440322740Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/22/2017440322740Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/17/2016440336334Open ↗
07/12/2016440322740Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
11/14/2016440336290Open ↗
▸BISDEP Hydrant Flow Test Letter1
10/17/2016440336290Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/28/2017440322740Open ↗
08/22/2017440322740Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/18/2012420624060Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
08/28/2017440322740Open ↗
09/08/2016440336334Open ↗
08/19/2016440336290Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION8
10/06/2017440336334Open ↗
07/05/2017440336334Open ↗
12/21/2016440336290Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/19/2016440336290Open ↗
08/17/2016440336334Open ↗
07/12/2016440322740Open ↗
▸BISBOROUGH INTAKE FORM2
09/08/2017440336334Open ↗
08/28/2017440322740Open ↗
▸BISEFILING COVER SHEET2
08/18/2016421361074Open ↗
09/18/2012420624060Open ↗