← Back
Two family converted from one family
43-47 UTOPIA PARKWAY
QUEENS · BIN 4124302
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R3XZoning
1,865 sfGross Floor Area
2Units
4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Two family converted from one family · 3,242 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC107/22/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINLI.CONSTRUCTION LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506107/22/2023
Building Lifecycle
All (37)Filed (1)Permit Issued (1)Signed Off (1)Violation (28)Inspection (2)Objection (2)Special Inspection (2)
11/19/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Violation issued (ECB, closed)
Construction
07/12/2024
Violation issued (ECB, closed)
Construction
07/12/2024
Violation issued (ECB, closed)
Construction
07/12/2024
Violation issued (ECB, closed)
Construction
07/12/2024
Violation issued (ECB, open)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, open)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, open)
Construction
02/02/2024
Violation issued (ECB, open)
Construction
02/02/2024
Violation issued (ECB, closed)
Construction
02/02/2024
Violation issued (ECB, closed)
Construction
02/02/2024
Violation issued (ECB, closed)
Construction
10/13/2023
Signed off — Alteration
REMOVE ILLEGAL PARTIAL WALLS AND DOORS AT 2ND FLOOR AS PER PLANS FILED HEREWITH AND CURE ECB VIOLATIONS#35669969X, 35669968Y, 35669967M, 35669966K, 35669965Z, 35669964R, 35669963P. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00908212-I1
10/12/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/04/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/25/2023
Permit issued — General Construction
Q00908212-I1-GC
08/03/2023
Objection resolved — Addressed
07/31/2023
Objection raised — Scope
07/22/2023
Filed — Alteration
REMOVE ILLEGAL PARTIAL WALLS AND DOORS AT 2ND FLOOR AS PER PLANS FILED HEREWITH AND CURE ECB VIOLATIONS#35669969X, 35669968Y, 35669967M, 35669966K, 35669965Z, 35669964R, 35669963P. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00908212-I1
07/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
07/22/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/16/2023
Violation issued (ECB, closed)
Construction
06/16/2023
Violation issued (ECB, closed)
Construction
06/16/2023
Violation issued (ECB, closed)
Construction
06/16/2023
Violation issued (ECB, closed)
Construction
06/16/2023
Violation issued (ECB, closed)
Construction
06/16/2023
Violation issued (ECB, closed)
Construction
06/16/2023
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offXINLI.CONSTRUCTION LLC09/25/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/12/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/04/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/22/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
07/22/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026Q00908212-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00908212-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026Q00908212-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00908212-I1Open ↗