← Back
Elevator apt, semi-fireproof with stores
43-53 MAIN STREET
QUEENS · Flushing-Willets Point · BIN 4618356
💬 Discuss this project
2016Year Built
7Stories
D7Building Class
R6Zoning
65,910 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized16 Open Violations 13 unresolved · 3 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: JACKSON HT. ROOSEVELT DEVELOPMENT II, LL C · 10,000 sf lot · 6.59 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 26p · 2 filings · 13 docs
Floor 13p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JHRDC1204/09/2026
JACKSON HT. ROOSEVELT DEVELOPMENT II, LL C1003/22/2026
RELIABLE NYC CONSTRUCTION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOU GAO203/05/2025
MADRIAGA ENGINEERING P.C.102/13/2024
CL ENGINEERING P.C.504/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO403/21/2026
JM CONSULTANT STUDIO203/21/2026
JD DESIGN ASSOCIATES INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVERBRIGHT ELECTRIC INCElectrical203/22/2026
EXCELLENT METROPOLITANGeneral Contractor104/09/2026
JD ARCH LLCGeneral Contractor103/21/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOU GAO9407203/05/2025
J&R DESIGN AND INSPECTION6637102/13/2024
CL ENGINEERING P.C.6781104/19/2021
Building Lifecycle
All (66)Filed (8)Permit Issued (4)Violation (39)Objection (2)Special Inspection (13)
08/21/2026
Violation issued (HPD, open)
C
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
A
08/21/2026
Violation issued (HPD, open)
B
08/21/2026
Violation issued (HPD, open)
C
08/21/2026
Violation issued (HPD, open)
A
05/08/2026
Violation issued (HPD, open)
A
04/23/2026
Violation issued (ECB, open)
Construction
01/23/2026
Violation issued (ECB, open)
Construction
01/21/2026
Violation issued (ECB, open)
Construction
12/05/2025
Violation issued (ECB, closed)
Construction
08/11/2025
Violation issued (ECB, closed)
Unknown
07/30/2025
Permit issued — General Construction
Q01187950-I1-GC
07/29/2025
Permit issued — Plumbing
Q01187950-S1-PL
03/05/2025
Filed — Alteration
TO REMOVE WOOD FRAME ENCLOSURE & INSTALL NEW AWNING AT OSP, REMOVE ILLEGAL PARTITIONS AT 002 TO RESOLVE ECB VIOLATION# 39100202J, 39098844L, 390098843J. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01187950-S1
03/05/2025
Filed — Alteration
TO REMOVE WOOD FRAME ENCLOSURE & INSTALL NEW AWNING AT OSP, REMOVE ILLEGAL PARTITIONS AT 002 TO RESOLVE ECB VIOLATION# 39100202J, 39098844L, 390098843J. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01187950-I1
03/05/2025
Special inspection requirement — Interior lighting power
You Gao
02/27/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
02/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
02/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
02/27/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
02/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
You Gao
02/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
04/17/2024
Violation issued (HPD, closed)
A
02/27/2024
Objection raised — Zoning
02/27/2024
Objection raised — Scope
02/13/2024
Filed — Alteration
FILE TO REMEDY ECB VIOLATIONS #: 39098843J, 39098844L & 39100202J. DEMOLISH ILLEGAL PARTITION & PLUMBING WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow JOB #: Q00976932-I1. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00976929-I1
02/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
02/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
Robert Truskosky
12/01/2023
Violation issued (FDNY_ORDER, closed)
11/28/2023
Violation issued (ECB, open)
Construction
11/28/2023
Violation issued (ECB, closed)
Construction
11/27/2023
Violation issued (HPD, closed)
I
11/06/2023
Violation issued (ECB, closed)
Construction
11/06/2023
Violation issued (ECB, open)
Construction
10/17/2023
Violation issued (FDNY_ORDER, closed)
07/25/2023
Violation issued (FDNY_ORDER, closed)
07/25/2023
Violation issued (FDNY_ORDER, closed)
07/25/2023
Violation issued (FDNY_ORDER, closed)
07/25/2023
Violation issued (FDNY_ORDER, closed)
03/31/2023
Violation issued (HPD, closed)
A
02/16/2023
Violation issued (FDNY_NOV, closed)
11/16/2022
Violation issued (HPD, closed)
I
04/06/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/06/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/01/2022
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH BIS APPLICATION #: Q00504450. INSTALL COMMERCIAL COOKING EQUIPMENT & PLUMBING WORK AT THE EXISTING KITCHEN OF EATING & DRINKING ESTABLISHMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00504463-P3
03/10/2022
Violation issued (HPD, closed)
A
03/10/2022
Violation issued (HPD, closed)
I
12/28/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH BIS APPLICATION #: Q00504450. INSTALL COMMERCIAL COOKING EQUIPMENT & PLUMBING WORK AT THE EXISTING KITCHEN OF EATING & DRINKING ESTABLISHMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00504463-P2
12/27/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
12/27/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
10/15/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH BIS APPLICATION #: Q00504450. INSTALL COMMERCIAL COOKING EQUIPMENT & PLUMBING WORK AT THE EXISTING KITCHEN OF EATING & DRINKING ESTABLISHMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00504463-P1
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/30/2021
Permit issued — General Construction
Q00504450-I1-GC-CX
04/29/2021
Permit issued — Plumbing
Q00504463-I1-PL
04/20/2021
Violation issued (HPD, closed)
I
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT METROPOLITAN07/30/2025
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG07/29/2025
DOB NOWGeneral ConstructionPermit IssuedJD ARCH LLC04/30/2021
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN04/29/2021
1 project · most recent 04/19/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/19/2021Permit Issued—Ventilation Systems
Ventilation
2 projects · most recent 03/05/2025
Gas Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
03/05/2025Permit IssuedWATSON'S PLBG, HTG, & BDGGas, Water/Sanitary
04/01/2022Signed-offMPS PLUMBING & HEATING INGas, Plumbing-Sprinkler, Water/Sanitary
3 projects · most recent 10/07/2025
General Wiring
FiledStatusContractorScope
10/07/2025Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
07/10/2019CompleteEVERBRIGHT ELECTRIC INCGeneral Wiring
09/28/2018CompleteAL-LECTRIC ELECT'L CONTRG—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/05/2025Interior lighting powerYou Gaoenergy_progress
02/27/2025Energy Code Compliance InspectionsYou Gaoprogress
02/27/2025Fire-Resistant Penetrations and JointsYou Gaospecial
02/27/2025Structural Stability – Alterations of existing buildingsYou Gaospecial
02/27/2025Energy Code Compliance InspectionsYou Gaoprogress
02/27/2025Fire-Resistance Rated ConstructionYou Gaoprogress
02/27/2025Fire-Resistant Penetrations and JointsYou Gaospecial
02/13/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
02/08/2024Tenant Protection Plan ComplianceRobert Truskoskyspecial
04/06/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/06/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
12/27/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
12/27/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00504463-P2Request digital key ↗
08/27/2026Q00504463-P1Request digital key ↗
08/27/2026Q00504463-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00504450-I1Open ↗
08/20/2026Q01187950-S1Open ↗
08/20/2026Q01187950-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026Q00504463-P2Open ↗
09/02/2026Q00504463-P2Open ↗
09/01/2026Q00504463-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01187950-S1Open ↗
09/01/2026Q00976929-I1Open ↗
09/01/2026Q00976929-I1Open ↗
Showing 3 of 4 on file for this type