← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Fairfield Manor Apartments
43-60 DOUGLASTON PARKWAY · Name © OpenStreetMap contributors · BIN 4168635
💬 Discuss this project
1963Year Built
6Stories
D1Building Class
R6AZoning
114,402 sfGross Floor Area
148Units
LL97 CoveredRent Stabilized144 Active Violations 135 unresolved · 9 paperwork only 3 likely answered 6 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Fairfield Manor at Douglaston · 35,600 sf lot · 3.21 FAR built · Flood zone X
Locations of Work
ArchitectureEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFairfield Properties1p · 1 filing · 7 docs
Site & exteriorFairfield Properties13p · 3 filings · 12 docs
Filed — no permit issuedHeavy duty sidewalk shed installation3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fairfield Properties11503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Empire Design111/11/2024
GEI Consultants108/30/2023
Architect Associates107/18/2022
Enthink Engineers106/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates103/21/2026
Architect203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Royal Electrical & WiringElectrical1003/21/2026
Moon ConstructionGeneral Contractor407/08/2026
MNK EnterprisesScaffold407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Empire Design5474108/30/2023
GEI Consultants1047108/30/2023
Arc-HI-Tech Associates6963107/18/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
08/14/2026
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT NORTH SECTION AT PUBLIC HALL, 6th STORY
HPD violation · open
08/14/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 3rd ROOM FROM EAST…
HPD violation · open
08/14/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING AT CLOSET IN THE 2nd ROOM…
HPD violation · open
08/14/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERATIVE BELL BUZZER AND RETURN BUUZZE FROM VESTIVEBULE TO APARTMENT, IN THE…
HPD violation · open
227 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMoon Construction11/09/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/09/2023
DOB NOWGeneral ConstructionSigned-offMoon Construction07/21/2022
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/17/2022
BISPLISSUEDVillage P & H NY03/21/2019
BISOTISSUEDRobert M Simeone03/21/2019
BISOTISSUEDRobert M Simeone03/05/2019
BISPLISSUEDVillage P & H NY03/05/2019
BISOTISSUEDRobert M Simeone09/13/2018
BISPLISSUEDVillage P & H NY09/12/2018
BISOTISSUEDRobert M Simeone09/10/2018
BISOTISSUEDRobert M Simeone08/20/2018
BISPLISSUEDVillage P & H NY08/20/2018
BISPLISSUEDVillage P & H NY08/20/2018
BISOTISSUEDRobert M Simeone08/20/2018
BISPLISSUEDVillage P & H NY08/01/2018
BISOTISSUEDRobert M Simeone08/01/2018
BISPLISSUEDVillage P & H NY07/09/2018
BISOTISSUEDRobert M Simeone07/09/2018
BISOTISSUEDTufco05/07/2018
BISPLISSUEDVillage P & H NY02/13/2018
BISOTISSUEDRobert M Simeone02/13/2018
BISPLISSUEDAlcyone Plumbing Co11/20/2017
BISOTISSUEDRobert M Simeone11/20/2017
BISPLISSUEDVillage P & H NY10/24/2017
BISOTISSUEDRobert M Simeone10/20/2017
BISOTISSUEDRobert M Simeone07/03/2017
BISPLISSUEDVillage P & H NY07/03/2017
BISOTISSUEDTufco05/10/2017
BISPLISSUEDVillage P & H NY05/10/2017
BISPLISSUEDVillage P & H NY04/05/2017
BISOTISSUEDRobert M Simeone04/04/2017
BISPLISSUEDVillage P & H NY03/16/2017
BISOTISSUEDRobert M Simeone03/15/2017
BISPLISSUEDVillage P & H NY02/15/2017
BISOTISSUEDRobert M Simeone02/14/2017
BISPLISSUEDVillage P & H NY11/29/2016
BISOTISSUEDRobert M Simeone11/28/2016
BISOTISSUEDTufco09/21/2016
BISPLISSUEDVillage P & H NY08/28/2016
+ 14 more permits on file
9 projects · most recent 11/07/2023
General Wiring
FiledStatusContractorScope
11/07/2023Permit IssuedStar Electrical Contractors—
06/17/2022Permit IssuedRichard Neu—
10/16/2019CompleteMaximum ElectricGeneral Wiring
01/23/2019CompleteMaximum ElectricGeneral Wiring
07/27/2018CompleteMaximum ElectricGeneral Wiring
04/11/2018CompleteMaximum ElectricGeneral Wiring
04/11/2018CompleteMaximum ElectricGeneral Wiring
04/11/2018CompleteMaximum ElectricGeneral Wiring
04/11/2018CompleteMaximum ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/23/2023Tenant Protection Plan ComplianceMd Rashidspecial
08/23/2023MasonryMario Puertaspecial
08/23/2023Structural Stability – Alterations of existing buildingsMario Puertaspecial
08/15/2023FinalNICHOLAS AHLBINprogress
1,315 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account