← Back
Two stories - detached, small or mid-size
43-63 169 STREET
QUEENS · East Flushing · BIN 4122709
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2AZoning
2,165 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivil
Roof1p · 1 filing · 12 docs
Floor 213p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2024$1.6M—— → —$746/sf building
01/26/2023$760K—Private party → Private party$351/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT511/13/2024
ALPHA HOME DESIGN LLC201/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAIAN HONEST RENOVATIONGeneral Contractor807/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513511/13/2024
Building Lifecycle
All (61)Filed (7)Permit Issued (5)Signed Off (3)Violation (6)Inspection (10)Special Inspection (30)
03/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
12/05/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
12/05/2024
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
12/05/2024
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
12/05/2024
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
12/05/2024
Special inspection requirement — Protection of exposed foundation insulation
DEZHANG FANG
12/05/2024
Special inspection requirement — Interior lighting power
DEZHANG FANG
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
12/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
12/05/2024
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
12/05/2024
Special inspection requirement — Chimneys and vents
DEZHANG FANG
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
12/05/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
12/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
12/05/2024
Special inspection requirement — Masonry
DEZHANG FANG
12/05/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
DEZHANG FANG
12/05/2024
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
12/05/2024
Special inspection requirement — Footing and Foundation
DEZHANG FANG
12/05/2024
Special inspection requirement — Final
DEZHANG FANG
12/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
12/05/2024
Special inspection requirement — Duct leakage testing, insulation and design
DEZHANG FANG
12/05/2024
Special inspection requirement — Fenestration areas
DEZHANG FANG
11/13/2024
Filed — Alteration CO
PROPOSE HORIZONTAL AND VERTICAL EXTENSION TO EXIST. 1-FAMILY BUILDING. OBTAIN NEW C OF O.
Q00856089-P2
11/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
11/13/2024
Special inspection requirement — Chimneys and vents
DEZHANG FANG
11/13/2024
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
11/13/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
DEZHANG FANG
11/13/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
11/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
11/12/2024
Signed off — Alteration
Plumbing work of 1-family residence enlargement. No change in use, egress or occupancy.
Q00856101-I1
03/29/2024
Signed off — Alteration
Q00865662-I1
03/28/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/19/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/13/2024
Signed off — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 JOB #Q00856089.
Q00856105-I1
03/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2024
Filed — Alteration CO
PROPOSE HORIZONTAL AND VERTICAL EXTENSION TO EXIST. 1-FAMILY BUILDING. OBTAIN NEW C OF O.
Q00856089-P1
01/11/2024
Filed — Alteration
Plumbing work of 1-family residence enlargement. No change in use, egress or occupancy.
Q00856101-P1
12/26/2023
Permit issued — Curb Cut
Q00865662-I1-CC
10/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2023
Violation issued (ECB, closed)
Construction
08/29/2023
Violation issued (ECB, closed)
Construction
08/29/2023
Violation issued (ECB, closed)
Construction
06/26/2023
Permit issued — Earth Work
Q00856089-I1-GC-CX
06/08/2023
Permit issued — Plumbing
Q00856101-I1-PL
05/23/2023
Permit issued — General Construction
Q00856089-I1-GC-CX
05/15/2023
Permit issued — Construction Fence
Q00856105-I1-FN
05/03/2023
Filed — Alteration
Plumbing work of 1-family residence enlargement. No change in use, egress or occupancy.
Q00856101-I1
05/01/2023
Filed — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 JOB #Q00856089.
Q00856105-I1
04/26/2023
Filed — Alteration
Q00865662-I1
04/12/2023
Filed — Alteration CO
PROPOSE HORIZONTAL AND VERTICAL EXTENSION TO EXIST. 1-FAMILY BUILDING. OBTAIN NEW C OF O.
Q00856089-I1
01/25/2022
Violation issued (HPD, open)
I
01/24/2022
Violation issued (HPD, closed)
C
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offHAIAN HONEST RENOVATION12/26/2023
DOB NOWEarth WorkPermit IssuedHAIAN HONEST RENOVATION06/26/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC06/08/2023
DOB NOWGeneral ConstructionPermit IssuedHAIAN HONEST RENOVATION05/23/2023
DOB NOWConstruction FenceSigned-offHAIAN HONEST RENOVATION05/15/2023
1 project · most recent 06/05/2023
General Wiring
FiledStatusContractorScope
06/05/2023CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 11/13/2024
Wood
FiledStatusContractorScope
11/13/2024Permit IssuedHAIAN HONEST RENOVATIONWood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/19/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
12/05/2024HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
12/05/2024Maintenance informationDEZHANG FANGenergy_progress
12/05/2024Air barrier - visual inspectionDEZHANG FANGenergy_progress
12/05/2024HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
12/05/2024Fenestration air leakageDEZHANG FANGenergy_progress
12/05/2024Insulation placement and R valuesDEZHANG FANGenergy_progress
12/05/2024Protection of exposed foundation insulationDEZHANG FANGenergy_progress
12/05/2024Interior lighting powerDEZHANG FANGenergy_progress
12/05/2024HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
12/05/2024Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
12/05/2024Concrete - Cast-In-PlaceDEZHANG FANGspecial
12/05/2024Chimneys and ventsDEZHANG FANGspecial
12/05/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
12/05/2024Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
12/05/2024Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
12/05/2024MasonryDEZHANG FANGspecial
12/05/2024Construction Operations Influencing Adjacent StructuresDEZHANG FANGspecial
12/05/2024Structural Wood FrameDEZHANG FANGprogress
12/05/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
12/05/2024Footing and FoundationDEZHANG FANGprogress
12/05/2024FinalDEZHANG FANGprogress
12/05/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
12/05/2024Duct leakage testing, insulation and designDEZHANG FANGenergy_progress
12/05/2024Fenestration areasDEZHANG FANGenergy_progress
11/13/2024HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
Latest 25 of 58.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00865662-I1Request digital key ↗
08/24/2026Q00856105-I1Request digital key ↗
08/24/2026Q00856101-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00856089-P2Open ↗
08/13/2026Q00856089-I1Open ↗
08/13/2026Q00856089-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00856089-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00856089-I1Open ↗
09/01/2026Q00856089-I1Open ↗
09/01/2026Q00856089-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00856101-I1Open ↗
08/24/2026Q00856101-P1Open ↗
08/13/2026Q00856089-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00856089-I1Open ↗
08/29/2026Q00856089-P2Open ↗
08/26/2026Q00856101-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00856089-P2Open ↗
08/13/2026Q00856089-I1Open ↗
08/13/2026Q00856089-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026Q00856101-I1Open ↗
08/24/2026Q00856101-P1Open ↗
08/13/2026Q00856089-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00856089-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026Q00856089-P1Open ↗
08/13/2026Q00856089-P2Open ↗
08/13/2026Q00856089-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00856089-I1Open ↗
08/13/2026Q00856089-P1Open ↗
08/13/2026Q00856089-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00856089-I1Open ↗
08/13/2026Q00856089-P1Open ↗
08/13/2026Q00856089-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026Q00856089-I1Open ↗
08/13/2026Q00856089-P2Open ↗
08/13/2026Q00856089-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00856089-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00856089-I1Open ↗