← Back
BuildNYC
Office with commercial, 1-6 stories
43 GAR MEADOW STREET
BROOKLYN · BIN 3380027
💬 Discuss this project
1930Year Built
2Stories
O5Building Class
M1-2Zoning
55,184 sfGross Floor Area
66Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: Acme Realty · 39,740 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRefugeUnder Construction1 filing · 20 docs
Floor 1Refuge, Refuge 43 GarageUnder Construction66p · 12 filings · 20 docs
MezzanineRefugeUnder Construction1p · 1 filing · 20 docs
CellarRefugeUnder Construction38p · 3 filings · 20 docs
Site & exteriorRefuge 43 Garage10p · 8 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Refuge3310/16/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jack Green Associates410/08/2026
Glenn Josey Architecture507/29/2026
SYNC Architecture1007/15/2026
Bendix Engineering1109/26/2025
Kce Consulting Engineering105/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
J.A.M. Associates3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wilton Construction ManagersGeneral Contractor709/15/2026
Streamline USAGeneral Contractor407/08/2026
Asco Sprinkler CoFire Protection107/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Brook Plumbing & HeatingPlumbing106/28/2026
Brook Plumbing & HeatingFire Protection106/28/2026
Malta BuildersGeneral Contractor108/30/2026
Zone Plumbing & HeatingPlumbing110/16/2026
Winick ProductionsGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004110/08/2026
SE Inspections7486707/30/2026
Bendix Engineering42931109/26/2025
Building Lifecycle
All (102)Filed (31)Permit Issued (12)Signed Off (4)Inspection (11)Objection (14)Special Inspection (30)
10/15/2026
Permit issued — Plumbing
B01362985-S4-PL
10/08/2026
Filed — Alteration
Installation of plumbing fixtures associated with bathroom buildout.
B01362985-S4
10/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/14/2026
Permit issued — Structural
B01110512-S5-ST
08/28/2026
Permit issued — General Construction
B01362985-I1-GC
07/30/2026
Filed — Alteration
Installation of plumbing fixtures associated with bathroom buildout.
B01362985-S2
07/30/2026
Filed — Alteration
Installation of plumbing fixtures associated with bathroom buildout.
B01362985-S1
07/30/2026
Filed — Alteration
Installation of plumbing fixtures associated with bathroom buildout.
B01362985-S3
07/29/2026
Filed — Alteration
Installation of plumbing fixtures associated with bathroom buildout.
B01362985-I1
07/24/2026
Objection resolved — Addressed
07/23/2026
Objection raised — Other
07/15/2026
Filed — No Work
B01430029-I1
04/29/2026
Objection resolved — Addressed
04/28/2026
Objection raised — Other
04/27/2026
Filed — No Work
B01392979-I1
02/20/2026
Special inspection requirement — Post-installed Anchors
Spencer Goroff
02/20/2026
Special inspection requirement — Maintenance information
Spencer Goroff
02/20/2026
Special inspection requirement — Final
Spencer Goroff
02/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Spencer Goroff
02/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Spencer Goroff
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
02/20/2026
Special inspection requirement — Sprinkler Systems
Spencer Goroff
02/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Spencer Goroff
02/20/2026
Special inspection requirement — Mechanical Systems
Spencer Goroff
02/04/2026
Permit issued — General Construction
B01343545-I1-GC
01/16/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Other
01/13/2026
Filed — Alteration
Temporary structures for event programming. Removed at the end of the programing. No changes to existing structures, use or egress.
B01343545-I1
01/12/2026
Filed — No Work
B01345018-I1
01/07/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
09/30/2025
Filed — No Work
B01295625-I1
09/26/2025
Filed — Alteration
Remove existing gas piping and plumbing fixtures as indicated on the plans and risers.
B01061115-P6
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
09/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/07/2025
Signed off — Alteration
Interior alterations including a new bar, new partitions, doors, windows, flooring, light fixtures, plumbing fixtures and finishes. One existing stair will be replaced, and the existing trusses will be reinforced.
B01110512-I1
09/07/2025
Signed off — Alteration
Remove existing gas piping and plumbing fixtures as indicated on the plans and risers.
B01061115-I1
09/03/2025
Filed — No Work
B01280869-I1
09/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/03/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/20/2025
Filed — Alteration
Interior alterations including a new bar, new partitions, doors, windows, flooring, light fixtures, plumbing fixtures and finishes. One existing stair will be replaced, and the existing trusses will be reinforced.
B01110512-P1
08/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Spencer Goroff
08/20/2025
Special inspection requirement — Lighting controls
Spencer Goroff
08/20/2025
Special inspection requirement — Interior lighting power
Spencer Goroff
08/20/2025
Special inspection requirement — Final
Spencer Goroff
08/20/2025
Special inspection requirement — Lighting controls
Spencer Goroff
08/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Spencer Goroff
08/20/2025
Special inspection requirement — Final
Spencer Goroff
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
08/20/2025
Special inspection requirement — Concrete - Cast-In-Place
Spencer Goroff
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
08/20/2025
Special inspection requirement — Concrete - Cast-In-Place
Spencer Goroff
08/20/2025
Special inspection requirement — Interior lighting power
Spencer Goroff
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/28/2025
Objection raised — Cost
05/28/2025
Objection resolved — Addressed
05/22/2025
Filed — Alteration
Interior alterations including a new bar, new partitions, doors, windows, flooring, light fixtures, plumbing fixtures and finishes. One existing stair will be replaced, and the existing trusses will be reinforced.
B01110512-S5
05/19/2025
Permit issued — Mechanical Systems
B01110512-S1-MS
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedZone Plumbing & Heating10/15/2026
DOB NOWStructuralPermit IssuedWilton Construction Managers09/14/2026
DOB NOWGeneral ConstructionPermit IssuedMalta Builders08/28/2026
DOB NOWGeneral ConstructionPermit IssuedWinick Productions02/04/2026
DOB NOWMechanical SystemsPermit IssuedWilton Construction Managers05/19/2025
DOB NOWSprinklersPermit IssuedSharp Plumbing05/16/2025
DOB NOWPlumbingPermit IssuedBrook Plumbing & Heating05/16/2025
DOB NOWGeneral ConstructionSigned-offWilton Construction Managers05/15/2025
DOB NOWSprinklersSigned-offAsco Sprinkler Co07/11/2024
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating07/03/2024
DOB NOWGeneral ConstructionSigned-offStreamline USA06/21/2024
DOB NOWMechanical SystemsSigned-offStreamline USA06/18/2024
3 projects · most recent 10/08/2026
Heating and Air Conditioning Systems Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
10/08/2026Permit IssuedMalta BuildersHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU123SJS4 13,600 BTU · Vrf Indoor ×1
ARNU243M2A4 27,300 BTU · Vrf Indoor ×1
ARUM036GSS5 3 tons · Vrf Outdoor ×1
09/26/2025Signed-offStreamline USAAir Conditioning Systems
Cooling
Trane TWA180E30RAB 6,000 CFM · Condensing Unit ×6
08/20/2025Permit IssuedWilton Construction ManagersOthers
Other
Carrier NA 18,000 CFM · Ductwork ×4
3 projects · most recent 10/08/2026
Sprinkler System
FiledStatusContractorScope
10/08/2026——Sprinkler System
09/26/2025Signed-offAsco Sprinkler CompanySprinkler System
08/20/2025Permit IssuedBrook Plumbing & HeatingSprinkler System
3 projects · most recent 10/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/08/2026Permit Issued5 Boro's PlumbingWater/Sanitary
09/26/2025Permit IssuedBedrock Plumbing & HeatingGas, Water/Sanitary
08/20/2025Permit IssuedBrook Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 10/08/2026
Steel
FiledStatusContractorScope
10/08/2026Permit Issued5 Boro's Plumbing1 scope_items
08/20/2025Permit IssuedWilton Construction ManagersSteel
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/03/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
10/08/2026Fire-Resistant Penetrations and Joints—special
02/20/2026FinalSpencer Goroffprogress
02/20/2026Maintenance informationSpencer Goroffenergy_progress
02/20/2026Post-installed AnchorsSpencer Goroffspecial
02/20/2026HVAC-R and service water heating equipmentSpencer Goroffenergy_progress
02/20/2026HVAC-R and service water piping design and insulationSpencer Goroffenergy_progress
02/20/2026HVAC-R and service water heating system controlsSpencer Goroffenergy_progress
02/20/2026Fire-Resistant Penetrations and JointsSpencer Goroffspecial
02/20/2026Fire-Resistant Penetrations and JointsSpencer Goroffspecial
02/20/2026Sprinkler SystemsSpencer Goroffspecial
02/20/2026Mechanical SystemsSpencer Goroffspecial
01/07/2026FinalANDY ENGLER ROTHprogress
09/26/2025Fire-Resistant Penetrations and JointsMatthew Bendixspecial
08/20/2025Interior lighting powerSpencer Goroffenergy_progress
08/20/2025Lighting controlsSpencer Goroffenergy_progress
08/20/2025FinalSpencer Goroffprogress
08/20/2025Fire-Resistance Rated ConstructionSpencer Goroffprogress
08/20/2025Fire-Resistant Penetrations and JointsSpencer Goroffspecial
08/20/2025Interior lighting powerSpencer Goroffenergy_progress
08/20/2025Lighting controlsSpencer Goroffenergy_progress
08/20/2025Concrete - Cast-In-PlaceSpencer Goroffspecial
08/20/2025Concrete - Cast-In-PlaceSpencer Goroffspecial
08/20/2025Fire-Resistant Penetrations and JointsSpencer Goroffspecial
08/20/2025FinalSpencer Goroffprogress
08/20/2025Fire-Resistance Rated ConstructionSpencer Goroffprogress
Latest 25 of 67.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
RefugeRestaurant / Food ServiceCellar, Floor 1, Roof
Project B01362985 Alteration · QA Failed · 07/29/2026
Project B01110512 Alteration · Permit Entire · 04/18/2025
Refuge 43 GarageEvents & gatheringsFloor 1
Project B01343545 Alteration · Permit Entire · 01/13/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch22
08/24/2026B01061115-S3Request digital key ↗
08/24/2026B01061115-P6Request digital key ↗
08/24/2026B01061115-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly8
08/24/2026B01081676-I1Request digital key ↗
08/23/2026B01134765-I1Request digital key ↗
08/20/2026B01280869-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications88
▸DOB NOWProgress Inspector Seal & Signature35
09/01/2026B01110512-I1Open ↗
09/01/2026B01110512-I1Open ↗
09/01/2026B01110512-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
10/11/2026B01362985-S4Open ↗
08/24/2026B01061115-P6Open ↗
08/24/2026B01061115-S2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026B01110512-I1Open ↗
09/01/2026B01110512-I1Open ↗
09/01/2026B01110512-P2Open ↗
Showing 3 of 21 on file for this type
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
10/11/2026B01362985-S4Open ↗
08/24/2026B01061115-S2Open ↗
08/24/2026B01061115-P6Open ↗
Showing 3 of 22 on file for this type