← Back
STATEN ISLAND
43 MACE STREET
STATEN ISLAND · BIN 5177757
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
StructuralMechanicalCivil
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1 filing · 10 docs
Floor 1Under Construction1 filing · 10 docs
BasementUnder Construction1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT108/07/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. MANGONE CONSTRUCTIONGeneral Contractor209/22/2026
Building Lifecycle
All (30)Filed (1)Permit Issued (2)Objection (2)Special Inspection (25)
09/21/2026
Permit issued — Structural
S01442588-I1-GC-CX
09/21/2026
Permit issued — Earth Work
S01442588-I1-FO-EA
09/16/2026
Objection resolved — Addressed
08/25/2026
Objection raised — Scope
08/07/2026
Filed — New Building
PROPOSED DETACHED 1 FAMILY RESIDENCE WITH ACCESSORY DETACHED ONE CAR GARAGE.
S01442588-I1
08/07/2026
Special inspection requirement — Wood – Prefabricated I-Joists
08/07/2026
Special inspection requirement — Concrete - Cast-In-Place
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/07/2026
Special inspection requirement — Subgrade Inspections
08/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/07/2026
Special inspection requirement — Final
08/07/2026
Special inspection requirement — Footing and Foundation
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
08/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/07/2026
Special inspection requirement — Structural Wood Frame
08/07/2026
Special inspection requirement — Air barrier — testing
08/07/2026
Special inspection requirement — Fenestration areas
08/07/2026
Special inspection requirement — Air barrier - visual inspection
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/07/2026
Special inspection requirement — Insulation placement and R values
08/07/2026
Special inspection requirement — Interior lighting power
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/07/2026
Special inspection requirement — Electric vehicle service equipment requirements
08/07/2026
Special inspection requirement — Fenestration air leakage
08/07/2026
Special inspection requirement — Maintenance information
08/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/07/2026
Special inspection requirement — Permanent certificate
08/07/2026
Special inspection requirement — Protection of exposed foundation insulation
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJ. MANGONE CONSTRUCTION09/21/2026
DOB NOWEarth WorkPermit IssuedJ. MANGONE CONSTRUCTION09/21/2026
1 project · most recent 08/07/2026
Concrete Wood
FiledStatusContractorScope
08/07/2026Permit IssuedJ. MANGONE CONSTRUCTIONConcrete, Wood
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/07/2026Wood – Prefabricated I-Joists—special
08/07/2026Concrete - Cast-In-Place—special
08/07/2026Fire-Resistant Penetrations and Joints—special
08/07/2026Subgrade Inspections—special
08/07/2026Subsurface Investigations (Borings/Test Pits)—special
08/07/2026Final—progress
08/07/2026Footing and Foundation—progress
08/07/2026Energy Code Compliance Inspections—progress
08/07/2026Fire-Resistance Rated Construction—progress
08/07/2026Structural Wood Frame—progress
08/07/2026Air barrier — testing —energy_progress
08/07/2026Fenestration areas—energy_progress
08/07/2026Air barrier - visual inspection—energy_progress
08/07/2026HVAC-R and service water piping design and insulation—energy_progress
08/07/2026Duct leakage testing, insulation and design—energy_progress
08/07/2026HVAC-R and service water heating equipment—energy_progress
08/07/2026Insulation placement and R values—energy_progress
08/07/2026Interior lighting power—energy_progress
08/07/2026HVAC-R and service water heating system controls—energy_progress
08/07/2026Electric vehicle service equipment requirements—energy_progress
08/07/2026Fenestration air leakage—energy_progress
08/07/2026Maintenance information—energy_progress
08/07/2026Fenestration and door U-factor and product ratings—energy_progress
08/07/2026Permanent certificate—energy_progress
08/07/2026Protection of exposed foundation insulation—energy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01442588-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026S01442588-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026S01442588-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01442588-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026S01442588-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026S01442588-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/16/2026S01442588-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026S01442588-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026S01442588-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026S01442588-I1Open ↗