← Back
Elevator apt, semi-fireproof with stores
43 ORCHARD STREET
MANHATTAN · Chinatown-Two Bridges · BIN 1003993
💬 Discuss this project
1900Year Built
7Stories
D7Building Class
C6-2Zoning
15,633 sfGross Floor Area
14Units
Rent Stabilized13 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: ORCHARD & GRAND LLC · 2,395 sf lot · 6.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO507/08/2026
ORCHARD AND GRAND LLC203/22/2026
ORCHARD 45 LLC103/22/2026
ORCHARD & GRAND LLC FIRST103/22/2026
43 ORCHARD REALTY2103/22/2026
MAD 45 ORCHARD503/21/2026
CD HOUSING CONSTRUCTION203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2014$8.2M—ORCHARD 45 LLC → ORCHARD & GRAND LLC$522/sf building
03/14/2014$16.1M—43 ORCHARD REALTY LLC → ORCHARD 45 LLC$1,030/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC112/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARD NEUElectrical103/22/2026
JASCO, INCGeneral Contractor107/08/2026
Building Lifecycle
All (60)Filed (1)Permit Issued (1)Signed Off (1)Facade (FISP) (12)Violation (45)
04/02/2025
Violation issued (HPD, open)
B
04/02/2025
Violation issued (HPD, open)
B
04/02/2025
Violation issued (HPD, open)
B
04/02/2025
Violation issued (HPD, open)
B
04/02/2025
Violation issued (HPD, open)
B
04/02/2025
Violation issued (HPD, open)
B
05/08/2024
Violation issued (HPD, closed)
C
05/08/2024
Violation issued (HPD, open)
A
05/08/2024
Violation issued (HPD, open)
B
05/08/2024
Violation issued (HPD, open)
A
05/08/2024
Violation issued (HPD, closed)
C
11/15/2023
Violation issued (HPD, closed)
I
06/20/2023
Cycle 9 facade report signed — SWARMP
06/12/2023
Cycle 9 facade inspection completed
06/10/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00804181-I1
02/17/2023
Cycle 9 facade report submitted
12/27/2022
Permit issued — Sidewalk Shed
M00804181-I1-SH
12/26/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00804181-I1
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
10/26/2021
Violation issued (FDNY_NOV, closed)
10/04/2021
Violation issued (FDNY_NOV, closed)
09/29/2021
Violation issued (ECB, closed)
Elevators
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/01/2021
Violation issued (HPD, closed)
A
01/31/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/16/2019
Cycle 8 facade inspection completed
01/12/2019
Cycle 8 facade report signed — SWARMP
12/13/2018
Violation issued (ECB, closed)
Elevators
05/25/2018
Violation issued (HPD, closed)
A
05/25/2018
Violation issued (HPD, closed)
A
05/25/2018
Violation issued (HPD, open)
C
04/18/2018
Violation issued (HPD, closed)
C
02/08/2018
Cycle 8 facade report submitted
05/31/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/20/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/07/2015
Violation issued (HPD, open)
B
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/18/2014
Cycle 7 facade report submitted
11/14/2014
Cycle 7 facade report signed — SAFE
10/09/2014
Cycle 7 facade inspection completed
09/19/2014
Violation issued (ECB, closed)
Local Law
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/02/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/14/2007
Violation issued (ECB, closed)
Construction
02/16/2006
Cycle 6 facade report submitted
02/15/2006
Cycle 6 facade report signed — SAFE
10/22/2005
Cycle 6 facade inspection completed
07/10/1990
Violation issued (ECB, closed)
Construction
04/19/1990
Violation issued (ECB, closed)
Construction
12/11/1989
Violation issued (ECB, closed)
Construction
12/11/1989
Violation issued (ECB, closed)
Construction
07/20/1988
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJASCO, INC12/27/2022
BISPLISSUEDC JAMES PLBG & HTG INC04/24/2009
BISSDISSUEDC. JAMES PLBG & HTG INC03/18/2009
BISSPISSUEDC. JAMES PLBG & HTG INC03/18/2009
BISPLISSUEDORION PLG & HTG CORP06/30/2008
BISSPISSUEDGREAT CITY PLBG & HTG CORP09/25/2007
BISSDISSUEDGREAT CITY PLBG & HTG CORP09/25/2007
BISBLISSUEDC JAMES PLBG & HTG INC08/30/2007
BIS—ISSUEDCASUR CORP05/03/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/16/2007
BISOTISSUEDCASUR CORPORATION01/03/2007
BISOTISSUEDCASUR CORP12/15/2006
BISOTISSUEDCD HOUSING COSTRUCTION01/18/2002
BIS—ISSUEDY & L SERVICING INC.09/04/1990
2 projects · most recent 12/25/2022
General Wiring
FiledStatusContractorScope
12/25/2022Permit IssuedRICHARD NEU—
05/20/2018CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
Nothing on file for this building.
▾Documents — 2 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/01/2026M00804181-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M00804181-I1Open ↗