← Back
Two family converted from one family
43 VAN BUREN STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3050015
💬 Discuss this project
1935Year Built
2Stories
B3Building Class
R6BZoning
2,160 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: TOWNHOUSE RENTAL, L.L.C. · 2,000 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 16 docs
Floor 12p · 1 filing · 16 docs
Cellar2p · 1 filing · 16 docs
Sub-Basement2p · 1 filing · 16 docs
Site & exterior1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKSTONE GROUP603/22/2026
TOWNHOUSE RENTAL, LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/14/2023$2.1M—— → —$984/sf building
06/22/2022$1.2M—MGP INV LLC → VAN BUREN BRICKS LLC$559/sf building
04/15/2022$800K—Private party → MGP INV LLC$370/sf building
07/07/2014$300K—— → —$139/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.303/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor303/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781303/08/2023
Building Lifecycle
All (93)Filed (3)Permit Issued (2)Signed Off (2)Violation (60)Inspection (7)Special Inspection (19)
03/03/2026
Violation issued (HPD, closed)
B
03/03/2026
Violation issued (HPD, closed)
B
03/03/2026
Violation issued (HPD, closed)
B
03/03/2026
Violation issued (HPD, closed)
B
11/25/2025
Violation issued (HPD, closed)
A
11/25/2025
Violation issued (HPD, closed)
B
11/25/2025
Violation issued (HPD, closed)
A
11/25/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
04/07/2023
Violation issued (HPD, closed)
A
03/27/2023
Signed off — Alteration
PROPOSED TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00773380-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00773380-I1
03/24/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/14/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Metering
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
03/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/08/2023
Filed — Alteration
PROPOSED TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00773380-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00773380-P1
03/07/2023
Signed off — Alteration
PROPOSED TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00773380-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00773380-S1
02/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/15/2022
Permit issued — Plumbing
B00773380-S1-PL
07/18/2022
Permit issued — General Construction
B00773380-I1-GC
07/15/2022
Filed — Alteration
PROPOSED TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00773380-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00773380-S1
07/15/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
07/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
07/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
07/15/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
07/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/14/2022
Filed — Alteration
PROPOSED TWO FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #B00773380-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00773380-I1
01/17/2022
Violation issued (HPD, closed)
C
01/17/2022
Violation issued (HPD, closed)
B
01/17/2022
Violation issued (HPD, closed)
C
01/17/2022
Violation issued (HPD, closed)
C
01/17/2022
Violation issued (HPD, closed)
B
01/17/2022
Violation issued (HPD, closed)
B
01/17/2022
Violation issued (HPD, closed)
B
01/17/2022
Violation issued (HPD, closed)
B
11/15/2021
Violation issued (HPD, closed)
I
11/10/2021
Violation issued (HPD, closed)
B
11/10/2021
Violation issued (HPD, closed)
B
11/10/2021
Violation issued (HPD, closed)
B
11/10/2021
Violation issued (HPD, closed)
B
11/10/2021
Violation issued (HPD, closed)
C
11/10/2021
Violation issued (HPD, closed)
A
05/13/2020
Violation issued (HPD, closed)
B
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT08/15/2022
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC07/18/2022
1 project · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022CompleteSOLID STATE ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/14/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/01/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/09/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
03/09/2023MeteringCHRISTIAN LOZADAenergy_progress
03/09/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
03/09/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/09/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
03/09/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
03/09/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
03/09/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/09/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
03/09/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/09/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/09/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
03/09/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
07/15/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/15/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
07/15/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
07/15/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
07/15/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
07/15/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00773380-P1Request digital key ↗
08/29/2026B00773380-S1Request digital key ↗
08/29/2026B00773380-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026B00773380-I1Open ↗
08/28/2026B00773380-I1Open ↗
08/26/2026B00773380-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00773380-P1Open ↗
08/29/2026B00773380-S1Open ↗
08/29/2026B00773380-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00773380-I1Open ↗
08/26/2026B00773380-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00773380-P1Open ↗
08/29/2026B00773380-S1Open ↗
08/29/2026B00773380-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00773380-I1Open ↗