← Back
Converted dwellings or rooming house
43 WEST 75 STREET
MANHATTAN · Upper West Side (Central) · BIN 1028749
💬 Discuss this project
1891Year Built
4Stories
C5Building Class
R8BZoning
8,250 sfGross Floor Area
8Units
Rent Stabilized2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Converted dwellings or rooming house · Owner of record: 43 WEST 75TH NY NY LLC · 2,248 sf lot · 3.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivil
Permit Issued — active, not yet Signed-off
Floor 32p · 1 filing · 6 docs
Floor 25p · 2 filings · 20 docs
Floor 1Under Construction23p · 3 filings · 20 docs
CellarUnder Construction71p · 1 filing · 20 docs
Sub-BasementUnder Construction63p · 2 filings · 20 docs
Site & exteriorUnder Construction63p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARBROSE REALTY3807/08/2026
IPRIME DEVELOPMENT907/08/2026
43 WEST 75TH STREET403/21/2026
PARK CONTRACTING GROUP107/08/2026
43 WEST 75TH NY NY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/10/2023$5.8M—— → —$703/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREGG ROTHSTEIN ARCHITECT703/21/2026
WILLOUGHBY CONSULTING1003/21/2026
BASIC GROUPS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IPRIME DEVELOPMENT LLCGeneral Contractor1307/08/2026
PARK CONTRACTING GROUPGeneral Contractor107/08/2026
STEEL TONE CONSTRUCTIONGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
NOPHIER PLUMBING & HTG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLANCO DESIGN, INC92121212/19/2025
RYAN SPECIAL ENGINEERING2018212/19/2025
ANDREW GOODRICH, P.E., PL965312/17/2024
Building Lifecycle
All (100)Filed (18)Permit Issued (11)Violation (9)Inspection (10)Objection (22)Special Inspection (30)
08/20/2026
Objection resolved — Resolved
07/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2026
Objection raised — Scope
06/18/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION AT THE CELLAR LEVEL RESTORE STOOP AT BUILDING ENTRANCE. COMBINE APT ON FIRST FLOOR WITH THREE APTS ON BASEMENT LEVEL. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01007133-S4
06/15/2026
Permit issued — Supported Scaffold
M01414056-I1-SF
06/13/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01414056-I1
01/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VERONICA BLANCO
01/28/2026
Special inspection requirement — Structural Steel - Details
VERONICA BLANCO
01/28/2026
Special inspection requirement — Footing and Foundation
VERONICA BLANCO
01/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/28/2026
Special inspection requirement — Subgrade Inspections
William Ryan
01/28/2026
Special inspection requirement — Concrete - Cast-In-Place
VERONICA BLANCO
01/28/2026
Special inspection requirement — Final
VERONICA BLANCO
01/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Raymond Volpe
01/28/2026
Special inspection requirement — Structural Steel - High Strength Bolting
William Ryan
01/13/2026
Permit issued — General Construction
M01007133-S3-GC-CX
01/08/2026
Objection resolved — Addressed
01/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VERONICA BLANCO
01/03/2026
Special inspection requirement — Interior lighting power
VERONICA BLANCO
01/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
VERONICA BLANCO
01/03/2026
Special inspection requirement — Lighting in dwelling units
VERONICA BLANCO
01/03/2026
Special inspection requirement — Concrete - Cast-In-Place
VERONICA BLANCO
01/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/03/2026
Special inspection requirement — Final
VERONICA BLANCO
01/03/2026
Special inspection requirement — Lighting controls
VERONICA BLANCO
01/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VERONICA BLANCO
01/03/2026
Special inspection requirement — Energy Code Compliance Inspections
VERONICA BLANCO
12/29/2025
Objection raised — Structural
12/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/23/2025
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/19/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION AT THE CELLAR LEVEL RESTORE STOOP AT BUILDING ENTRANCE. COMBINE APT ON FIRST FLOOR WITH THREE APTS ON BASEMENT LEVEL. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01007133-P8
12/16/2025
Special inspection requirement — Concrete - Cast-In-Place
VERONICA BLANCO
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
William Ryan
12/16/2025
Special inspection requirement — Structural Steel - Details
VERONICA BLANCO
12/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VERONICA BLANCO
12/16/2025
Special inspection requirement — Footing and Foundation
VERONICA BLANCO
12/16/2025
Special inspection requirement — Final
VERONICA BLANCO
12/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Raymond Volpe
12/16/2025
Special inspection requirement — Subgrade Inspections
William Ryan
12/05/2025
Permit issued — Plumbing
M01007133-S1-PL
11/26/2025
Objection raised — Structural
11/26/2025
Objection raised — Fire_Protection
11/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
VERONICA BLANCO
11/21/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION AT THE CELLAR LEVEL RESTORE STOOP AT BUILDING ENTRANCE. COMBINE APT ON FIRST FLOOR WITH THREE APTS ON BASEMENT LEVEL. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01007133-P7
11/21/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION AT THE CELLAR LEVEL RESTORE STOOP AT BUILDING ENTRANCE. COMBINE APT ON FIRST FLOOR WITH THREE APTS ON BASEMENT LEVEL. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01007133-P6
11/17/2025
Special inspection requirement — Interior lighting power
VERONICA BLANCO
10/31/2025
Permit issued — General Construction
M01007133-S3-GC-CX
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/02/2025
Objection raised — Admin
09/02/2025
Objection raised — Cost
09/02/2025
Objection raised — Structural
09/02/2025
Objection raised — Admin
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedPARK CONTRACTING GROUP06/15/2026
DOB NOWGeneral ConstructionPermit IssuedIPRIME DEVELOPMENT LLC01/13/2026
DOB NOWPlumbingSigned-offNOPHIER PLUMBING & HTG IN12/05/2025
DOB NOWGeneral ConstructionPermit IssuedIPRIME DEVELOPMENT LLC10/31/2025
DOB NOWFoundationPermit IssuedIPRIME DEVELOPMENT LLC04/11/2025
DOB NOWGeneral ConstructionPermit IssuedIPRIME DEVELOPMENT LLC03/09/2025
DOB NOWMechanical SystemsPermit IssuedIPRIME DEVELOPMENT LLC12/03/2024
DOB NOWMechanical SystemsPermit IssuedIPRIME DEVELOPMENT LLC12/03/2024
DOB NOWStructuralPermit IssuedIPRIME DEVELOPMENT LLC08/06/2024
DOB NOWGeneral ConstructionPermit IssuedSTEEL TONE CONSTRUCTION08/18/2023
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC08/18/2023
BIS—ISSUEDINTERIORS BY JERRY LLC12/06/2019
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/02/2007
1 project · most recent 06/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2026Permit IssuedIPRIME DEVELOPMENT LLCHeating and Air Conditioning Systems
Heat / Cool
Tosot TU36-H30 34,000 BTU · Condensing Unit ×3
TU36-HFI 34,000 BTU · Heat Pump Outdoor ×3
TU36-24WADU 36,000 BTU · Condensing Unit ×1
TU60-32WEDU 45,000 BTU · Condensing Unit ×1
TUD36-24AH2ADU 36,000 BTU · Ahu ×1
TUD60-32AH2EDU 54,000 BTU · Ahu ×1
3 projects · most recent 06/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/18/2026Signed-offNOPHIER PLUMBING & HTG INGas, Water/Sanitary
11/01/2024——Gas, Water/Sanitary
08/10/2023Permit IssuedAMC PLBG, HTG & CLNG, INCGas, Water/Sanitary
1 project · most recent 04/19/2026
FiledStatusContractorScope
04/19/2026Permit IssuedAFFORDABLE ELECTRICAL1 meters, 1 new_meters
1 project · most recent 06/18/2026
Steel Concrete
FiledStatusContractorScope
06/18/2026Permit IssuedIPRIME DEVELOPMENT LLCSteel, Concrete
1 project · most recent 06/13/2026
Scaffold
FiledStatusContractorScope
06/13/2026Permit IssuedPARK CONTRACTING GROUPScaffold
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/13/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/21/2024Fail-Final General Construction Non-Directive 14FailView ↗
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
01/28/2026Footing and FoundationVERONICA BLANCOprogress
01/28/2026FinalVERONICA BLANCOprogress
01/28/2026Tenant Protection Plan Compliance—special
01/28/2026Structural Steel - High Strength BoltingWilliam Ryanspecial
01/28/2026Subgrade InspectionsWilliam Ryanspecial
01/28/2026Subsurface Investigations (Borings/Test Pits)Raymond Volpespecial
01/28/2026Concrete - Cast-In-PlaceVERONICA BLANCOspecial
01/28/2026Structural Stability – Alterations of existing buildingsVERONICA BLANCOspecial
01/28/2026Structural Steel - DetailsVERONICA BLANCOspecial
01/03/2026Concrete - Cast-In-PlaceVERONICA BLANCOspecial
01/03/2026Interior lighting powerVERONICA BLANCOenergy_progress
01/03/2026Lighting controlsVERONICA BLANCOenergy_progress
01/03/2026Lighting in dwelling unitsVERONICA BLANCOenergy_progress
01/03/2026Fire-Resistance Rated ConstructionVERONICA BLANCOprogress
01/03/2026FinalVERONICA BLANCOprogress
01/03/2026Energy Code Compliance InspectionsVERONICA BLANCOprogress
01/03/2026Structural Stability – Alterations of existing buildingsVERONICA BLANCOspecial
01/03/2026Tenant Protection Plan Compliance—special
01/03/2026Fire-Resistant Penetrations and JointsVERONICA BLANCOspecial
12/16/2025Structural Steel - High Strength BoltingWilliam Ryanspecial
12/16/2025Structural Stability – Alterations of existing buildingsVERONICA BLANCOspecial
12/16/2025Structural Steel - DetailsVERONICA BLANCOspecial
12/16/2025Tenant Protection Plan Compliance—special
12/16/2025Concrete - Cast-In-PlaceVERONICA BLANCOspecial
12/16/2025Subgrade InspectionsWilliam Ryanspecial
Latest 25 of 81.
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/29/2026M00917333-I1Request digital key ↗
08/25/2026M01007133-I1Request digital key ↗
08/25/2026M01007133-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits21
▸DOB NOWLPC Approval/Permit17
08/25/2026M01007133-S4Open ↗
08/13/2026M00917333-I1Open ↗
08/13/2026M01007133-P2Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
08/21/2019120415390Open ↗
04/08/2019120415390Open ↗
07/22/2010120415390Open ↗
▸BISWORK PERMIT APPLICATION1
12/09/2019120415390Open ↗
▸Seals & Professional Certifications85
▸DOB NOWProgress Inspector Seal & Signature34
10/01/2026M00917333-I1Open ↗
09/01/2026M01007133-P8Open ↗
09/01/2026M01007133-P8Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
10/01/2026M00917333-I1Open ↗
09/01/2026M01007133-S1Open ↗
09/01/2026M01007133-P8Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/29/2026M00917333-I1Open ↗
08/25/2026M01007133-P8Open ↗
08/25/2026M01007133-S4Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/22/2010120415390Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/08/2019120415390Open ↗
▸BISSCHEDULE B - PLUMBING1
07/22/2010120415390Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/29/2026M00917333-I1Open ↗
08/25/2026M01007133-P2Open ↗
08/25/2026M01007133-P1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/13/2019120415390Open ↗
03/13/2019120415390Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
03/13/2019120415390Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026M01007133-S3Open ↗
08/13/2026M01007133-P8Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M01007133-S3Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE3
08/21/2019120415390Open ↗
04/08/2019120415390Open ↗
07/22/2010120415390Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/22/2010120415390Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/13/2019120415390Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/22/2010120415390Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
08/21/2019120415390Open ↗
04/08/2019120415390Open ↗
▸BISEFILING COVER SHEET1
07/22/2010120415390Open ↗
▸BISADDITIONAL INFORMATION1
08/19/2019120415390Open ↗