RoofUnder Construction4p · 2 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing
TEMPORARY SHORING FOR STRUCTURAL ALTERATION AS PER PLANS.
On file for this project
111 documents · 3 drawing sheets
Facade repairs. No change in egress, use or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 162 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Structural work
On file for this project
26 documents
Filing for mechanical work. No change in occupancy, use or egress.
On file for this project
10 documents
Floor 152 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Structural work
On file for this project
26 documents
Filing for mechanical work. No change in occupancy, use or egress.
On file for this project
10 documents
Floor 142 filings · 12 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural work
On file for this project
26 documents
Filing for mechanical work. No change in occupancy, use or egress.
On file for this project
10 documents
Floor 134p · 3 filings · 12 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Sprinklers
Structural work
On file for this project
26 documents · 1 drawing sheet
Filing for mechanical work. No change in occupancy, use or egress.
On file for this project
10 documents · 2 drawing sheets
MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE 13TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 12Under Construction2p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Proposed equipment replacement of existing Autoclave located on the 12th fl room RL-1202 Soiled Utility (Dirty Cage Wash). Patching and repairing of existing finishes as required. No change to occupancy use, or egress.
On file for this project
25 documents · 2 drawing sheets
Floor 113p · 3 filings · 12 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
INTERIOR RENOVATION ON THE 11TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
6 documents
Mechanical work on the 11th floor. No change in occupancy, use or egress.
On file for this project
8 documents · 2 drawing sheets
Modifications to the Plumbing and Sprinkler systems on the 11th floor. No change in occupancy, use or egress.
On file for this project
5 documents · 1 drawing sheet
Floor 10
Floor 92p · 2 filings · 12 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
PLUMBING WORK ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
MECHANICAL WORK ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Floor 8
Floor 7
Floor 6
Floor 5Under Construction1 filing
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Project M01425471Permit Issued · 10/01/2026
Filing herewith for general construction as per plans submitted. No change in occupancy use or egress.
Floor 45p · 1 filing · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing Plumbing and Sprinkler systems on the 4th floor. No change in occupancy, use or egress.
On file for this project
34 documents · 5 drawing sheets
Floor 33p · 3 filings · 12 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Replace existing terminal boxes and duct distribution. Provide (2) new Fan Coil Units
On file for this project
5 documents · 1 drawing sheet
INTERIOR RENOVATIONS ON THE 3RD FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents
MODIFICATIONS TO THE PLUMBING AND SPRINKLER SYSTEMS ON THE 3RD FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
5 documents · 2 drawing sheets
Floor 21p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Sprinkler system on the 1st floor. No change in occupancy, use or egress.
On file for this project
26 documents
Structural work
On file for this project
26 documents
Filing to replace and upgrade nitrogen generation system. No change in egress, use, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 1Under Construction23p · 6 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
TEMPORARY SHORING FOR STRUCTURAL ALTERATION AS PER PLANS.
On file for this project
111 documents · 13 drawing sheets
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING STRUCTURAL ALTERATION MEANS & METHODS, FILED SEPARATELY UNDER M00977118-I1.
On file for this project
11 documents · 6 drawing sheets
Installation of Temp Weather Walls
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
CellarUnder Construction21p · 7 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
TEMPORARY SHORING FOR STRUCTURAL ALTERATION AS PER PLANS.
On file for this project
111 documents · 7 drawing sheets
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING STRUCTURAL ALTERATION MEANS & METHODS, FILED SEPARATELY UNDER M00977118-I1.
On file for this project
11 documents · 13 drawing sheets
INSTALLATION AND USE OF SHANTY/CONTRACTOR OFFICE AS PER PLANS.
On file for this project
6 documents
Latest 3 of 7 filings on this floor.
Sub-CellarUnder Construction13p · 5 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
TEMPORARY SHORING FOR STRUCTURAL ALTERATION AS PER PLANS.
On file for this project
111 documents · 3 drawing sheets
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING STRUCTURAL ALTERATION MEANS & METHODS, FILED SEPARATELY UNDER M00977118-I1.
On file for this project
11 documents · 8 drawing sheets
INSTALLATION AND USE OF SHANTY/CONTRACTOR OFFICE AS PER PLANS.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Site & exterior2 filings · 8 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Sidewalk Shed
Facade repairs. No change in egress, use or occupancy.
On file for this project
6 documents · 5 drawing sheets
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupanncy
On file for this project
2 documents · 4 drawing sheets
Filed — no permit issued3 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
MODIFICATION/ADDITIONS TO EXISTING SPRINKLER AND STANPIPE SYSTEM FOR INTERIOR FITOUT (RRL PHASE 2B) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
16 documents · 12 drawing sheets
Install new steel framing to accommodate the loading dock restoration as per plans filed herewith. No change to zoning, use, egress, occupancy.
On file for this project
9 documents · 4 drawing sheets
new loading dock platform within the existing loading dock
On file for this project
5 documents · 6 drawing sheets