| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/31/2026 | Permit Issued | SWINERTON BUILDERS | Ventilation Systems | |
| 03/19/2026 | Permit Issued | MARLIN MECHANICAL INC | Air Conditioning Systems | Cooling Daikin SWPJ-246898-1 15,000 CFM ×1 |
| 01/06/2026 | Permit Issued | CLUNE CONSTRUCTION CO LP | Air Conditioning Systems | Cooling United Cool Air VZWL15G2ANBC-1 6,000 CFM · Wshp ×1 |
| 08/03/2023 | Permit Issued | RAINIER RESTORATION LLC | Others | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | Permit Issued | BEDROCK MECHANICAL INC | — |
| 01/06/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | 109 heads |
| 12/02/2025 | Signed-off | AMR MECHANICAL INC. | 4 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | — | — | — |
| 07/30/2026 | Permit Issued | BEDROCK PLUMBING & HEATING INC | Water/Sanitary |
| 01/06/2026 | Signed-off | GEORGE BRESLAW PLBNG LLC | Water/Sanitary |
| 12/02/2025 | Signed-off | AMR MECHANICAL INC | — |
| 12/02/2025 | Signed-off | AMR MECHANICAL INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | Permit Issued | PROSTO ELECTRIC CORP | General Wiring |
| 02/06/2026 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 03/10/2025 | Permit Issued | K & G ELECTRIC CO., INC | HVAC Wiring |
| 12/17/2024 | Complete | ENNELL GRP ELECTRIC CORP | General Wiring |
| 09/30/2024 | Permit Issued | M&T ELECTRICAL LLC | — |
| 12/02/2023 | Permit Issued | RICHARD NEU | — |
| 04/30/2023 | Permit Issued | M&T ELECTRICAL LLC | General Wiring |
| 02/07/2023 | Complete | ULTIMATE SIGNS & ELEC COR | — |
| 08/20/2021 | Complete | DENMAR ELECTRIC CORP | General Wiring |
| 06/23/2021 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 09/21/2020 | Cancelled | MARTINEZ ELECTRICAL CONT | General Wiring |
| 09/13/2019 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 08/20/2019 | Complete | L&B ELEC'L INTERNATIONAL | General Wiring |
| 07/26/2019 | Cancelled | E G ELECTRIC INC | General Wiring |
| 05/15/2019 | Complete | M & M CONTROL WIRING & | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | Permit Issued | SWINERTON BUILDERS | Steel |
| 01/06/2026 | Signed-off | GEORGE BRESLAW PLBNG LLC | Steel |
| 04/17/2023 | Signed-off | KEYSTONE BUILDERS GROUP* | Steel |
| Owner | Filings | Most Recent |
|---|---|---|
| 430 PARK AVENUE COMPANY | 586 | 09/23/2026 |
| MNK ENTERPRISES NY INC | 5 | 03/22/2026 |
| KOMOHIL REALTY CO . | 10 | 03/22/2026 |
| PARK 58 CORP C/O BROWN HA | 1 | 03/22/2026 |
| 432 PARK SOUTH ASOCIATES | 1 | 03/22/2026 |
| OES TREICHEN PLOP INC | 1 | 03/22/2026 |
| OSTREI CHER PROP INC JAY | 1 | 03/22/2026 |
| GOODMAN MANAGEMENT | 1 | 03/22/2026 |
| BANK OF MONTREAL | 13 | 03/22/2026 |
| J E LEVINE BUILDERS | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GILSANZ MURRAY STEFICEK LLP | 1 | 08/04/2026 |
| COSENTINI ASSOCIATES | 10 | 07/31/2026 |
| MURDOCH ENGINEERING | 6 | 07/20/2026 |
| MDEAS ARCHITECTS | 1 | 07/13/2026 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 1 | 05/07/2026 |
| MCSWEENEY ENGINEERING | 1 | 03/19/2026 |
| RANDALL P. COLLINS ARCHITECT, PC | 2 | 01/28/2026 |
| MG ENGINEERING D.P.C. | 7 | 01/27/2026 |
| ROBERT DERECTOR ASSOCIATES | 3 | 01/06/2026 |
| KPFF CONSULTING ENGINEERS | 1 | 01/05/2026 |
| TPG ARCHITECTURE, LLP | 3 | 12/31/2025 |
| GOLDMAN COPELAND ASSOCIATES | 6 | 12/02/2024 |
| BR DESIGN ASSOCIATES LLC | 1 | 09/20/2024 |
| ASHRAF CORP | 1 | 12/02/2023 |
| MOED DE ARMAS & SHANNON | 1 | 08/03/2023 |
| KOUTSOUBIS ALONSO ASSOCIATES PE PC | 1 | 04/17/2023 |
| VOCON | 1 | 04/10/2023 |
| MOHAMMAD AHEAD, PE | 1 | 03/07/2023 |
| IAQ SYSTEMS INC | 1 | 10/13/2022 |
| JOSE L. PENA,P.E. | 2 | 09/22/2022 |
| ROBERT PAPAZIAN ARCHITECT PC | 5 | 09/06/2022 |
| STEPHEN BARLOW ARCHITECT PLLC | 1 | 04/07/2022 |
| PATTI & ANTHES CONSULTING ENGINEERS | 1 | 04/07/2022 |
| COHEN ENTERPRISES | 2 | 10/07/2021 |
| ROYAL ENGINEERING, P.C | 1 | 09/17/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 30 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 2 | 03/21/2026 |
| ROBERT PAPAZIAN ARCHITECT PC | 24 | 03/21/2026 |
| KAZAM CONSULTANTS | 6 | 03/21/2026 |
| J A EXPEDITING | 4 | 03/21/2026 |
| RIZZO GROUP | 5 | 03/21/2026 |
| LOUIS STRIAR | 10 | 03/21/2026 |
| BIG ORANGE EXPEDITING | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SWINERTON BUILDERS | General Contractor | 9 | 09/19/2026 |
| REIDY CONTRACTING GROUP | General Contractor | 7 | 07/08/2026 |
| KEYSTONE BUILDERS GROUP* | General Contractor | 7 | 07/08/2026 |
| ULTIMATE SIGNS DESIGNS | Scaffold | 5 | 07/08/2026 |
| FOUR BROTHERS GENERAL CONTRACT | General Contractor | 4 | 03/21/2026 |
| RAINIER RESTORATION LLC | General Contractor | 4 | 07/08/2026 |
| MNK ENTERPRISES NY INC | General Contractor | 3 | 03/21/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 3 | 04/09/2026 |
| ESSENTIAL DESIGN & BUILD | General Contractor | 3 | 03/21/2026 |
| LIEBHABER COMPANY INC | General Contractor | 3 | 07/08/2026 |
| AMR MECHANICAL INC | Plumbing | 3 | 07/08/2026 |
| ODYSSIA GLOBAL COMM. CORP | General Contractor | 2 | 07/08/2026 |
| R G M SIGNS | Scaffold | 2 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 2 | 03/21/2026 |
| AMR MECHANICAL INC. | Fire Protection | 2 | 07/08/2026 |
| DEMAR PLUMBING CORP | Fire Protection | 1 | 07/08/2026 |
| LT FIRE PROTECTION CORP | Fire Protection | 1 | 07/02/2026 |
| MEGA PLBG CORP | Fire Protection | 1 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 1 | 07/08/2026 |
| MEGA PLBG CORP | Plumbing | 1 | 07/08/2026 |
| ACTIVE SIGNS | Scaffold | 1 | 07/08/2026 |
| M&T ELECTRICAL LLC | Electrical | 1 | 03/22/2026 |
| KISLAND COLE | Electrical | 1 | 03/21/2026 |
| MARLIN MECHANICAL INC | General Contractor | 1 | 07/08/2026 |
| MILLSTONE CONSTRUCTION AS | General Contractor | 1 | 05/15/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| FENAGH, INC | 6942 | 3 | 08/04/2026 |
| ARCO ENGINEERING PC | 3769 | 1 | 03/19/2026 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 1 | 01/27/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 5 | 01/06/2026 |
| DOMANI INSPECTION SERVICE | 843 | 6 | 12/02/2025 |
| CONSULTING AND TESTING SE | 6152 | 4 | 12/02/2024 |
| PSI AGENCY INC. | 254 | 3 | 09/20/2024 |
| MILROSE CONSULTANTS LLC | 2003 | 4 | 04/17/2023 |
| KATZ ENGINEERING | 238 | 1 | 10/13/2022 |
| ROBERT PAPAZIAN ARCHITECT | 3491 | 1 | 10/13/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | SWINERTON BUILDERS | 09/18/2026 |
| DOB NOW | General Construction | Permit Issued | SWINERTON BUILDERS | 09/18/2026 |
| DOB NOW | Structural | Permit Issued | SWINERTON BUILDERS | 09/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 09/17/2026 |
| DOB NOW | Plumbing | Permit Issued | BEDROCK PLBG. & HTG., INC | 09/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | LT FIRE PROTECTION CORP | 06/30/2026 |
| DOB NOW | General Construction | Permit Issued | SPK/LEWIS CONSTRUCTION LL | 05/18/2026 |
| DOB NOW | General Construction | Signed-off | MILLSTONE CONSTRUCTION AS | 05/13/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MARLIN MECHANICAL INC | 05/04/2026 |
| DOB NOW | Sprinklers | Signed-off | AMR MECHANICAL INC. | 04/14/2026 |
| DOB NOW | Plumbing | Signed-off | GEORGE BRESLAW PLBNG LLC | 02/25/2026 |
| DOB NOW | Structural | Permit Issued | CLUNE CONSTRUCTION CO LP | 02/13/2026 |
| DOB NOW | Sign | Permit Issued | ULTIMATE SIGNS&DESIGNS CO | 02/11/2026 |
| DOB NOW | Sign | Permit Issued | ULTIMATE SIGNS&DESIGNS CO | 02/11/2026 |
| DOB NOW | Sign | Permit Issued | ULTIMATE SIGNS&DESIGNS CO | 02/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 02/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 01/06/2026 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 01/05/2026 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 02/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SWINERTON BUILDERS | 02/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ROSENWACH TANK CO. LLC | 02/11/2025 |
| DOB NOW | Sprinklers | Signed-off | AMR MECHANICAL INC | 01/21/2025 |
| DOB NOW | Plumbing | Signed-off | AMR MECHANICAL INC | 01/14/2025 |
| DOB NOW | Sprinklers | Signed-off | CAPITOL FIRE SPRINKLER CO | 12/31/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SWINERTON BUILDERS | 12/11/2024 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 12/11/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 12/11/2024 |
| DOB NOW | Plumbing | Signed-off | DEMAR PLUMBING CORP | 09/30/2024 |
| DOB NOW | Sprinklers | Signed-off | DEMAR PLUMBING CORP | 09/30/2024 |
| DOB NOW | General Construction | Signed-off | KEYSTONE BUILDERS GROUP* | 09/27/2024 |
| DOB NOW | Mechanical Systems | Signed-off | KEYSTONE BUILDERS GROUP* | 09/24/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | MNK ENTERPRISES NY INC | 12/04/2023 |
| DOB NOW | Sprinklers | Signed-off | AMR MECHANICAL INC. | 10/05/2023 |
| DOB NOW | Plumbing | Signed-off | AMR MECHANICAL INC | 10/05/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | RAINIER RESTORATION LLC | 08/31/2023 |
| DOB NOW | General Construction | Signed-off | RAINIER RESTORATION LLC | 08/30/2023 |
| DOB NOW | General Construction | Signed-off | ESSENTIAL DESIGN & BUILD | 06/05/2023 |
| DOB NOW | Sprinklers | Signed-off | REAL PLUMBING CORP | 05/11/2023 |
| DOB NOW | Plumbing | Signed-off | MEGA PLBG CORP | 04/22/2023 |
| DOB NOW | Structural | Signed-off | KEYSTONE BUILDERS GROUP* | 04/21/2023 |
| Date | Type | Result | Report |
|---|---|---|---|
| 02/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/02/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/30/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/27/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/22/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/02/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/29/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/23/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/22/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/31/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/31/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/26/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/09/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/09/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/05/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/15/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/13/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/17/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/14/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/23/2021 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/17/2021 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/31/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 07/31/2026 | Structural Steel - High Strength Bolting | — | special |
| 07/21/2026 | Final | JERE MURDOCH | progress |
| 07/21/2026 | Final | JERE MURDOCH | progress |
| 07/21/2026 | Final | JERE MURDOCH | progress |
| 07/07/2026 | Final | JERE MURDOCH | progress |
| 07/07/2026 | Final | JERE MURDOCH | progress |
| 04/29/2026 | Final | Frank Loffredo | progress |
| 03/10/2026 | HVAC-R and service water piping design and insulation | Michael McSweeney | energy_progress |
| 03/10/2026 | Fire-Resistant Penetrations and Joints | JOSE MANTRANA | special |
| 03/10/2026 | HVAC-R and service water heating system controls | Michael McSweeney | energy_progress |
| 03/10/2026 | Maintenance information | Michael McSweeney | energy_progress |
| 03/10/2026 | HVAC-R and service water heating equipment | Michael McSweeney | energy_progress |
| 03/10/2026 | Duct leakage testing, insulation and design | Michael McSweeney | energy_progress |
| 02/26/2026 | Mechanical Systems | JOSE MANTRANA | special |
| 02/26/2026 | Final | Michael McSweeney | progress |
| 01/27/2026 | Fire-Resistance Rated Construction | Shahrish Shuvo | progress |
| 01/16/2026 | Structural Steel - Welding | — | special |
| 01/16/2026 | Sprayed fire-resistant materials | — | special |
| 01/16/2026 | Post-installed Anchors | — | special |
| 01/16/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 01/16/2026 | Sprinkler Systems | — | special |
| 01/16/2026 | Structural Steel - Details | — | special |
| 01/16/2026 | Final | — | progress |
| 01/15/2026 | Post-installed Anchors | Shahrish Shuvo | special |