← Back
Public elementary, junior or senior high
P.S. 131 Brooklyn
4301 FT HAMILTON PARKWAY · BIN 3136085
💬 Discuss this project
1937Year Built
3Stories
W1Building Class
R6Zoning
80,260 sfGross Floor Area
0Units
LL97 Covered13 Open Violations 3 unresolved · 10 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 54,610 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 13 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
BasementUnder Construction9p · 3 filings · 20 docs
Sub-BasementUnder Construction21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1509/22/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION903/22/2026
DEPT OF EDUCATION/PS 131103/22/2026
DOE PS 131 0503/22/2026
NEELAM CONSTRUCTION503/22/2026
DOE 040203/22/2026
DOE PS131 040403/22/2026
DOE PS 131903/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASO ASSOCIATES1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCIS RICHARDSElectrical303/21/2026
WDF INCGeneral Contractor207/08/2026
COONEY, RONANElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
GIOVANNI DITURIElectrical103/21/2026
LUPINSKI, MAREKElectrical103/21/2026
MARTANY TILE CORPElectrical103/21/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
BORRELLI, RAFFAELEElectrical103/21/2026
WDF INCPlumbing107/08/2026
CHAYUT, ALLENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317307/08/2026
Building Lifecycle
All (147)Filed (22)Permit Issued (3)Violation (60)Objection (32)Special Inspection (30)
09/17/2026
Objection raised — Other
09/11/2026
Filed — Alteration
Floor and roof penetrations. Area Way closure and roof top equipment support
B01436960-S2
09/10/2026
Objection resolved — Resolved
09/04/2026
Special inspection requirement — Concrete - Cast-In-Place
09/04/2026
Special inspection requirement — Structural Steel - Details
09/04/2026
Special inspection requirement — Final
08/25/2026
Objection resolved — Resolved
08/14/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection raised — Other
08/05/2026
Filed — Alteration
Demolition of existing individual restroom in its entirety on cellar at corner of Lunch room. Demolition of window, infill opening. Construct 2 hr fire rated pump room with misc. floor repairs. New walls, doors, light fixture, gyp bd. ceiling.
B01397602-S9
08/03/2026
Filed — Alteration
Floor and roof penetrations. Area Way closure and roof top equipment support
B01436960-S1
08/03/2026
Special inspection requirement — Concrete - Cast-In-Place
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/03/2026
Special inspection requirement — Post-installed Anchors
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/31/2026
Objection resolved — Addressed
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
07/29/2026
Filed — Alteration
Floor and roof penetrations. Area Way closure and roof top equipment support
B01436960-I1
07/28/2026
Objection raised — Other
07/28/2026
Objection resolved — Resolved
07/23/2026
Filed — Alteration
Demolition of existing individual restroom in its entirety on cellar at corner of Lunch room. Demolition of window, infill opening. Construct 2 hr fire rated pump room with misc. floor repairs. New walls, doors, light fixture, gyp bd. ceiling.
B01397602-S8
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/21/2026
Special inspection requirement — Final
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/21/2026
Special inspection requirement — Interior lighting power
07/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/21/2026
Special inspection requirement — Maintenance information
07/21/2026
Special inspection requirement — Lighting controls
07/21/2026
Special inspection requirement — Mechanical Systems
07/17/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Maxim Korngold
07/17/2026
Special inspection requirement — Subgrade Inspections
Maxim Korngold
07/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Maxim Korngold
07/17/2026
Special inspection requirement — Final
Maxim Korngold
07/09/2026
Filed — Alteration
Addition of site drainage system upgrades; new area drains, manhole structures and all related piping and connections
B00965700-P4
07/08/2026
Filed — Alteration
Addition of site drainage system upgrades; new area drains, manhole structures and all related piping and connections
B00965700-P2
07/08/2026
Filed — Alteration
Addition of site drainage system upgrades; new area drains, manhole structures and all related piping and connections
B00965700-P3
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/06/2026
Special inspection requirement — Final
MAXIM KORNGOLD
07/06/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MAXIM KORNGOLD
07/06/2026
Special inspection requirement — Subgrade Inspections
MAXIM KORNGOLD
07/06/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
06/30/2026
Objection resolved — Open
06/30/2026
Objection resolved — Open
06/30/2026
Objection resolved — Open
06/23/2026
Objection raised — Other
06/22/2026
Filed — Alteration
Demolition of existing individual restroom in its entirety on cellar at corner of Lunch room. Demolition of window, infill opening. Construct 2 hr fire rated pump room with misc. floor repairs. New walls, doors, light fixture, gyp bd. ceiling.
B01397602-S7
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/12/2026
Special inspection requirement — Interior lighting power
06/12/2026
Special inspection requirement — Lighting controls
06/03/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/20/2026
Objection raised — Other
05/20/2026
Objection raised — Other
05/20/2026
Objection raised — Other
05/20/2026
Objection raised — Other
05/20/2026
Objection raised — Other
05/20/2026
Objection raised — Other
05/11/2026
Filed — Alteration
Demolition of existing individual restroom in its entirety on cellar at corner of Lunch room. Demolition of window, infill opening. Construct 2 hr fire rated pump room with misc. floor repairs. New walls, doors, light fixture, gyp bd. ceiling.
B01397602-S5
05/11/2026
Filed — Alteration
Demolition of existing individual restroom in its entirety on cellar at corner of Lunch room. Demolition of window, infill opening. Construct 2 hr fire rated pump room with misc. floor repairs. New walls, doors, light fixture, gyp bd. ceiling.
B01397602-S4
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWDF INC04/22/2026
DOB NOWStructuralPermit IssuedWDF INC04/22/2026
DOB NOWPlumbingPermit IssuedWDF INC04/22/2026
BISPLISSUEDVARSITY PLBG AND HTG INC10/17/2025
BISOTISSUEDNEELAM CONSTRUCTION CORP07/25/2025
BISOTISSUEDNEELAM CONSTRUCTION CORP07/25/2025
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/28/2025
BISPLISSUEDVARSITY PLBG AND HTG INC10/22/2024
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/30/2024
BISOTISSUEDNEELAM CONSTRUCTION CORP01/29/2024
BISOTISSUEDNEELAM CONSTRUCTION CORP01/29/2024
BISPLISSUEDVARSITY PLBG AND HTG INC10/25/2023
BISEQISSUEDNEELAM CONSTRUCTION CORP09/11/2023
BISOTISSUEDNEELAM CONSTRUCTION CORP07/28/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/26/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/12/2023
BISPLISSUEDVARSITY PLBG AND HTG INC10/31/2022
BISEQISSUEDNEELAM CONSTRUCTION CORP09/09/2022
BISOTISSUEDNEELAM CONSTRUCTION CORP07/28/2022
BISOTISSUEDNEELAM CONSTRUCTION CORP07/28/2022
BISMHISSUEDACS SYSTEM ASSOCIATES INC.05/05/2022
BISPLISSUEDVARSITY PLBG AND HTG INC11/08/2021
BISEQISSUEDPJP INSTALLERS INC10/12/2021
BISEQISSUEDPJP INSTALLERS INC10/12/2021
BISEQISSUEDNEELAM CONSTRUCTION CORP09/08/2021
BISEQISSUEDLADI CONSTRUCTION INC08/17/2021
BISOTISSUEDNEELAM CONSTRUCTION CORP08/04/2021
BISOTISSUEDNEELAM CONSTRUCTION CORP08/04/2021
BISPLISSUEDVARSITY PLBG AND HTG INC11/13/2020
BISOTISSUEDNEELAM CONSTRUCTION CORP11/10/2020
BISOTISSUEDNEELAM CONSTRUCTION CORP11/06/2020
BISEQISSUEDPJP INSTALLERS INC10/13/2020
BISEQISSUEDPJP INSTALLERS INC10/09/2020
BISEQISSUEDNEELAM CONSTRUCTION CORP09/03/2020
BISOTISSUEDNEELAM CONSTRUCTION CORP08/10/2020
BISOTISSUEDNEELAM CONSTRUCTION CORP08/10/2020
BISEQISSUEDLADI CONSTRUCTION INC07/30/2020
BISMHISSUEDACS SYSTEM ASSOCIATES INC.06/02/2020
BISPLISSUEDVARSITY PLBG AND HTG INC11/21/2019
BISEQISSUEDPJP INSTALLERS INC10/16/2019
+ 13 more permits on file
2 projects · most recent 09/11/2026
Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/11/2026——Air Conditioning Systems, Ventilation Systems
Ventilation
08/05/2026——Heating Systems
Heating
Qmark ×1
1 project · most recent 08/05/2026
Sprinkler System
FiledStatusContractorScope
08/05/2026——Sprinkler System
2 projects · most recent 08/05/2026
Water/Sanitary Plumbing-Sprinkler Storm
FiledStatusContractorScope
08/05/2026——Plumbing-Sprinkler, Water/Sanitary
07/09/2026Permit IssuedWDF INCStorm, Water/Sanitary
16 projects · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026Permit IssuedANCO ELECTL CONTCTNG INCGeneral Wiring
03/19/2026Permit IssuedGT ELECTRICAL COMPANY INCGeneral Wiring
12/17/2025CompleteSTANCO SYSTEM ELEC'L CONT—
07/07/2025CompleteGEMINI ELECTRIC CO., INC.—
06/23/2025CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
06/18/2025CompleteGEMINI ELECTRIC CO., INC.—
12/26/2024CompleteEVEREST ELECTRIC CORP—
05/04/2023CompleteCHARAN ELEC'L ENTERP'S IN—
03/22/2023CompleteCHARAN ELEC'L ENTERP'S IN—
12/21/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
11/15/2022Permit IssuedHIGH VOLT ELEC CORP. OF—
09/16/2020CompleteCHARAN ELEC'L ENTERP'S IN—
07/07/2020CompleteCHARAN ELEC'L ENTERP'S IN—
05/04/2020CompleteCHARAN ELEC'L ENTERP'S IN—
06/04/2019CompleteCHARAN ELEC'L ENTERP'S IN—
3 projects · most recent 09/11/2026
Concrete Steel
FiledStatusContractorScope
09/11/2026——Steel, Concrete
08/05/2026——1 scope_items
07/09/2026Permit IssuedWDF INCConcrete
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
09/04/2026Concrete - Cast-In-Place—special
09/04/2026Structural Steel - Details—special
09/04/2026Final—progress
08/03/2026Concrete - Cast-In-Place—special
08/03/2026Fire-Resistance Rated Construction—progress
08/03/2026Post-installed Anchors—special
08/03/2026Fire-Resistant Penetrations and Joints—special
07/30/2026Energy Code Compliance Inspections—progress
07/21/2026HVAC-R and service water heating equipment—energy_progress
07/21/2026Fire-Resistant Penetrations and Joints—special
07/21/2026Final—progress
07/21/2026HVAC-R and service water piping design and insulation—energy_progress
07/21/2026Interior lighting power—energy_progress
07/21/2026HVAC-R and service water heating system controls—energy_progress
07/21/2026Maintenance information—energy_progress
07/21/2026Lighting controls—energy_progress
07/21/2026Mechanical Systems—special
07/17/2026Subsurface Conditions – Fill Placement & In-Place DensityMaxim Korngoldspecial
07/17/2026Subgrade InspectionsMaxim Korngoldspecial
07/17/2026Concrete - Cast-In-PlaceMaxim Korngoldspecial
07/17/2026FinalMaxim Korngoldprogress
07/07/2026Fire-Resistance Rated Construction—progress
07/06/2026FinalMAXIM KORNGOLDprogress
07/06/2026Subsurface Conditions – Fill Placement & In-Place DensityMAXIM KORNGOLDspecial
07/06/2026Subgrade InspectionsMAXIM KORNGOLDspecial
Latest 25 of 51.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/03/2026B01397602-S6Request digital key ↗
08/23/2026B00965700-P1Request digital key ↗
08/23/2026B00965700-P4Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
09/14/2007310019011Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/22/2026B01436960-S2Open ↗
08/23/2026B00965700-P2Open ↗
08/23/2026B00965700-P4Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026B00965700-P2Open ↗
08/31/2026B00965700-P2Open ↗
08/31/2026B00965700-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B00965700-P2Open ↗
08/22/2026B00965700-S5Open ↗
08/22/2026B00965700-S4Open ↗
▸BISPC FULL REPORT1
09/06/2007310019011Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/06/2007310019011Open ↗
▸Approvals, Objections & Sign-offs47
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/22/2026B01436960-S2Open ↗
08/23/2026B00965700-P4Open ↗
08/23/2026B00965700-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)17
08/23/2026B00965700-P4Open ↗
08/23/2026B00965700-P3Open ↗
08/23/2026B00965700-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/14/2026B01397602-S6Open ↗
08/13/2026B00965700-S3Open ↗
08/13/2026B00965700-S5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/23/2026B00965700-S4Open ↗
08/23/2026B00965700-S3Open ↗
08/23/2026B00965700-S2Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/06/2007310019011Open ↗
▸Other Documents20
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal19
09/22/2026B01436960-S2Open ↗
08/23/2026B00965700-P4Open ↗
08/23/2026B00965700-P3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026B00965700-I1Open ↗