Other private school
Shema Kolainu-hear Our Voices
4306 NEW UTRECHT AVENUE · BIN 3136067
💬 Discuss this project
1930Year Built
2Stories
W8Building Class
R6Zoning
21,205 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Other private school · 5,300 sf lot · 4 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire ProtectionGeneral
Roof5p · 4 filings · 20 docs
Floor 31p · 3 filings · 20 docs
Floor 21p · 2 filings · 20 docs
Floor 11p · 1 filing · 17 docs
Cellar2p · 1 filing · 17 docs
3 jobs · most recent 12/24/2024
General Wiring
FiledStatusContractorScope
12/24/2024CompleteGREEN STAR ELECTL CONT INGeneral Wiring
10/26/2023CompletePOWER DIRECT ELECTRIC INC—
08/26/2020CompleteV. VASS ELECTRIC CORP—
Building Lifecycle
All (118)Filed (10)Permit Issued (13)Signed Off (7)Violation (25)Inspection (11)Objection (22)Special Inspection (30)
02/12/2026
Violation issued (FDNY_NOV, closed)
03/26/2025
Signed off — Alteration
New Mechanical system in conjunction with ALTCO #310295436, include heating, ventilation, air condition systems, associated ducts & piping.
B00780691-I1
02/25/2025
Special inspection requirement — Final
FAHAD FATEH
02/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/25/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
02/25/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/25/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
02/25/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/14/2025
Filed — Alteration
New Mechanical system in conjunction with ALTCO #310295436, include heating, ventilation, air condition systems, associated ducts & piping.
B00780691-P1
02/14/2025
Permit issued — Mechanical Systems
B00780691-I1-MS
01/28/2025
Special inspection requirement — Energy Code Compliance Inspections
01/07/2025
Signed off — Alteration
Filing plumbing fixtures on 3rd floor in conjunction with with Alt1 #310295436
B00780651-I1
12/04/2024
Signed off — Alteration
B01087964-S1
12/04/2024
Signed off — Alteration
B01087964-I1
11/26/2024
Signed off — Alteration
Filing Modification to existing sprinkler system to add Sprinkler heads on new 3rd floor and roof in conjunction with DOB ALT1 #310295436
B00780738-I1
11/25/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2024
Signed off — Alteration
INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01073827-I1
11/07/2024
Violation issued (FDNY_ORDER, closed)
10/30/2024
Permit issued — Mechanical Systems
B01073827-I1-MS
10/30/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2024
Permit issued — Plumbing
B00780651-I1-PL
09/03/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2024
Permit issued — Plumbing
B01087964-S1-PL
08/14/2024
Permit issued — Boiler Equipment
B01087964-I1-BE
08/14/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
08/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/14/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/14/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
08/14/2024
Special inspection requirement — Final
FAHAD FATEH
08/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/14/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
08/12/2024
Filed — Alteration
B01087964-S1
08/12/2024
Filed — Alteration
B01087964-I1
08/05/2024
Objection raised — Scope
08/05/2024
Objection resolved — Addressed
07/17/2024
Objection resolved — Addressed
07/16/2024
Objection raised — Fire_Protection
07/11/2024
Filed — Alteration
INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01073827-I1
06/28/2024
Special inspection requirement — Mechanical Systems
Jay Kavi
06/28/2024
Special inspection requirement — Final
De Gao
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
Latest 60 of 118 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC602/14/2025
ANDREW KATZ ENGINEERS208/12/2024
ASHRAF CORP107/11/2024
FL&M ENGINEERING DESIGN &INSPECTION107/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY EXPEDITING1203/21/2026
GREEN STUDIO203/21/2026
AN TONG FAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN D ENTERPRISESGeneral Contractor1203/21/2026
GWT ENTERPRISES INCGeneral Contractor407/08/2026
RITE WAY HEATING CORPPlumbing207/08/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
AIG DEVELOPERS INCGeneral Contractor107/08/2026
M&D FIRE SPRINKLER INCFire Protection107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
ERGO DEVELOPMENT & MGMN'TGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616602/14/2025
DAVID KATZ, P.E.6087108/12/2024
JAY KAVI CORPORATION8500107/11/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAIG DEVELOPERS02/14/2025
DOB NOWMechanical SystemsSigned-offERGO DEVELOPMENT MGMNT10/30/2024
DOB NOWPlumbingSigned-offLS PLUMBING CORP09/19/2024
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC08/14/2024
DOB NOWBoiler EquipmentSigned-offTARGET PIPING NY LLC08/14/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES07/12/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES07/12/2023
DOB NOWPlumbingSigned-offLS PLUMBING CORP04/20/2023
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC04/20/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES07/15/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES07/15/2022
BIS—ISSUEDAIG DEVELOPERS INC02/11/2025
BIS—ISSUEDAIG DEVELOPERS INC07/03/2024
BIS—ISSUEDAIG DEVELOPERS INC05/23/2024
BIS—ISSUEDAIG DEVELOPERS INC08/29/2023
BISEQISSUEDAIG DEVELOPERS INC05/08/2023
BIS—ISSUEDAIG DEVELOPERS INC08/31/2022
BIS—ISSUEDAIG DEVELOPERS INC05/17/2022
BISEQISSUEDAIG DEVELOPERS INC05/17/2022
BISPLISSUEDJ. CRISERA PLG & HTG CORP.05/12/2003
BISBLISSUEDTMS PLMBG & HTG CORP02/04/2003
BISPLISSUEDTMS PLMBG & HTG CORP01/09/2003
BISPLISSUEDADVANCED PLUMBING MECH08/15/2002
BIS—ISSUEDWEISSGARTEN CONTRACTING03/08/2002
BISSPISSUEDADVANCED PLBG, MECH & SPR04/30/2001
BIS—ISSUEDWEISSGARTEN CONTRACTING04/30/2001
BISPLISSUEDJ. CRISERA PLBG & HTG CORP.03/30/2001
BISEQISSUEDWEISSGARTEN CONTRACTING03/06/2001
BIS—ISSUEDWEISSGARTEN CONSTRUCTION11/03/2000
BISEQISSUEDSPRING SCAFFOLDING INC04/05/2000
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC08/17/1998
BISBLISSUEDNAT'L MECH. SVCS PLBG LLC08/17/1998
BIS—ISSUEDFRASCA CONSTRUCTION07/26/1991
BISEQISSUEDFRASCA CONSTRUCTION07/26/1991
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2024Pass-Final Boiler Equipment InspectionPassView ↗
11/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
02/25/2025FinalFAHAD FATEHprogress
02/25/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/25/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/25/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/25/2025Shutoff dampersFAHAD FATEHenergy_progress
02/25/2025Maintenance informationFAHAD FATEHenergy_progress
02/25/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/25/2025Heating SystemsFAHAD FATEHspecial
02/25/2025Mechanical SystemsFAHAD FATEHspecial
02/25/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/25/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/28/2025Energy Code Compliance Inspections—progress
08/14/2024Shutoff dampersFAHAD FATEHenergy_progress
08/14/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/14/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/14/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/14/2024Maintenance informationFAHAD FATEHenergy_progress
08/14/2024Mechanical SystemsFAHAD FATEHspecial
08/14/2024FinalFAHAD FATEHprogress
08/14/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/14/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/14/2024Heating SystemsFAHAD FATEHspecial
06/28/2024Mechanical SystemsJay Kavispecial
06/28/2024FinalDe Gaoprogress
06/28/2024Fire-Resistant Penetrations and JointsJay Kavispecial
Latest 25 of 34.
▾Documents — 150 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026B00770312-I1Request digital key ↗
08/28/2026B00780738-P1Request digital key ↗
08/28/2026B00780691-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION19
07/22/2025310295436Open ↗
01/16/2025310295436Open ↗
01/09/2025310295436Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION4
05/28/2024310295436Open ↗
09/07/2022310295436Open ↗
05/17/2022310295436Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/12/2024310295436Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/14/2009310295436Open ↗
▸BISVERIFY TAX LOT1
12/19/2024310295436Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/30/2024310295436Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/14/2009310295436Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B00780738-I1Open ↗
08/28/2026B00780738-P1Open ↗
08/28/2026B00780691-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B00780691-I1Open ↗
09/01/2026B01073827-I1Open ↗
09/01/2026B01073827-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B00780691-I1Open ↗
09/02/2026B00780691-I1Open ↗
09/02/2026B00780691-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/18/2009320037553Open ↗
06/18/2009320037571Open ↗
02/12/2009310295436Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
06/18/2009320037553Open ↗
06/18/2009320037571Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
06/16/2025310295436Open ↗
▸BISEQUIPMENT USE PERMITS1
06/30/2025310295436Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE SIGNOFF1
12/31/2024310295436Open ↗
▸BISST-1 Street Tree Checklist1
05/27/2009310295436Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B00780738-P1Open ↗
08/28/2026B00780691-P1Open ↗
08/28/2026B00780651-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/18/2009320037553Open ↗
06/18/2009320037571Open ↗
▸BIS* ASBESTOS ACP 7 OR 5 OR ASB 41
09/18/2024310295436Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00780651-I1Open ↗
08/13/2026B00780691-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00780691-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/13/2022310295436Open ↗
06/09/2022310295436Open ↗
05/17/2022310295436Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
10/09/2024310295436Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/14/2025310295436Open ↗
▸BISPOST-INSTALLED ANCHORS1
10/09/2024310295436Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
10/09/2024310295436Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
10/09/2024310295436Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/09/2024310295436Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/17/2022310295436Open ↗
▸BISMECHANICAL SYSTEMS1
01/14/2025310295436Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/17/2022310295436Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
10/09/2024310295436Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/24/2026B01087964-S1Open ↗
08/24/2026B01087964-I1Open ↗
08/13/2026B00780691-P1Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
06/22/2009320037571Open ↗
06/22/2009320037553Open ↗
06/22/2009320037544Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
01/09/2025310295436Open ↗
02/22/2021310295436Open ↗
03/20/2012310295436Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/28/2024310295436Open ↗
09/07/2022310295436Open ↗
02/22/2021310295436Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
05/22/2025310295436Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
06/30/2025310295436Open ↗
06/25/2025310295436Open ↗
06/18/2009320037553Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
05/28/2024310295436Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/30/2024310295436Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/17/2022310295436Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION12
07/28/2025310295436Open ↗
06/25/2025310295436Open ↗
06/25/2025310295436Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET5
06/18/2009320037553Open ↗
06/18/2009320037571Open ↗
06/18/2009320037544Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
09/07/2022310295436Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
02/12/2009310295436Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
10/09/2024310295436Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/13/2022310295436Open ↗