← Back
Two stories - detached, small or mid-size
4303 VIREO AVENUE
BRONX · BIN 2019457
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R4AZoning
1,036 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,689 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/21/2016$415K—Private party → Private party$401/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PELLETIER SALGADO ARCHITECTS309/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DYNAMIC BUILDING CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOUBLE DIAMOND INCGeneral Contractor107/08/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544209/30/2024
Building Lifecycle
All (20)Filed (3)Permit Issued (2)Signed Off (2)Violation (1)Inspection (2)Special Inspection (10)
12/18/2025
Signed off — Alteration
Respectfully request to install to new shower, lab & toilet connecting to existing sanitary line. No change in use, egress, or occupancy.
X01012906-I1
12/05/2024
Signed off — Alteration
New Bathroom & closet with finishes, exterior decking & temporary seasonal screen in patio. Modify existing fencing & gate as required. No change in use, egress, or occupancy.
X00998866-I1
11/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2024
Special inspection requirement — Lighting controls
Jarrett Pelletier
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
10/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
10/21/2024
Special inspection requirement — Final
Jarrett Pelletier
10/21/2024
Special inspection requirement — Lighting in dwelling units
Jarrett Pelletier
09/30/2024
Filed — Alteration
New Bathroom & closet with finishes, exterior decking & temporary seasonal screen in patio. Modify existing fencing & gate as required. No change in use, egress, or occupancy.
X00998866-P1
09/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2024
Permit issued — Plumbing
X01012906-I1-PL
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
09/19/2024
Special inspection requirement — Final
Jarrett Pelletier
09/19/2024
Special inspection requirement — Lighting controls
Jarrett Pelletier
09/19/2024
Special inspection requirement — Lighting in dwelling units
Jarrett Pelletier
05/24/2024
Permit issued — General Construction
X00998866-I1-GC
03/07/2024
Filed — Alteration
Respectfully request to install to new shower, lab & toilet connecting to existing sanitary line. No change in use, egress, or occupancy.
X01012906-I1
02/27/2024
Filed — Alteration
New Bathroom & closet with finishes, exterior decking & temporary seasonal screen in patio. Modify existing fencing & gate as required. No change in use, egress, or occupancy.
X00998866-I1
03/25/2014
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC09/23/2024
DOB NOWGeneral ConstructionSigned-offDOUBLE DIAMOND INC05/24/2024
1 project · most recent 06/13/2024
General Wiring
FiledStatusContractorScope
06/13/2024CompleteKURT EBINGER ELEC CONSTGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/21/2024Lighting controlsJarrett Pelletierenergy_progress
10/21/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
10/21/2024Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
10/21/2024FinalJarrett Pelletierprogress
10/21/2024Lighting in dwelling unitsJarrett Pelletierenergy_progress
09/19/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/19/2024Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
09/19/2024FinalJarrett Pelletierprogress
09/19/2024Lighting controlsJarrett Pelletierenergy_progress
09/19/2024Lighting in dwelling unitsJarrett Pelletierenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026X00998866-P1Request digital key ↗
08/21/2026X00998866-I1Request digital key ↗
08/21/2026X01012906-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026X00998866-I1Open ↗
08/13/2026X00998866-P1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026X00998866-P1Open ↗
08/28/2026X00998866-P1Open ↗
08/28/2026X00998866-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026X00998866-I1Open ↗
08/13/2026X00998866-P1Open ↗
08/13/2026X01012906-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X00998866-P1Open ↗
08/26/2026X00998866-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026X00998866-I1Open ↗
08/13/2026X00998866-P1Open ↗
08/13/2026X01012906-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/21/2026X00998866-I1Open ↗
08/13/2026X00998866-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026X00998866-I1Open ↗
08/13/2026X00998866-P1Open ↗
▸DOB NOWPlot Diagram2
08/21/2026X00998866-I1Open ↗
08/13/2026X00998866-P1Open ↗