BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Cobble Hill Towers Condominium
431 HICKS STREET · BIN 3398749
💬 Discuss this project
1996Year Built
6Stories
RMBuilding Class
R6Zoning
82,978 sfGross Floor Area
118Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 44,855 sf lot · 1.85 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLisa ManagementUnder Construction4p · 1 filing · 4 docs
Floor 6Cobble Hi1 filing · 7 docs
Floor 5Cobble Hi1 filing · 7 docs
Floor 4Cobble Hi1 filing · 7 docs
Floor 3Cobble Hi1 filing · 7 docs
Floor 2Cobble Hi1 filing · 7 docs
Floor 1Cobble Hi1 filing · 7 docs
Site & exteriorLisa ManagementUnder Construction34p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hudson Cobble Hill Towers2007/08/2026
Lisa Management607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bumpzoid207/09/2026
Always Fast Services102/17/2026
Enthink Engineers505/22/2023
Paul Perdek, Prof. Engineering107/21/2022
Green Design207/29/2021
Ashraf107/28/2021
Royal T&E111/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jhpa103/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold2209/10/2026
Everest ScaffoldingScaffold507/08/2026
Preserv BLD Restoration ManagementScaffold307/08/2026
Cipriani ElectricElectrical103/21/2026
WCK ElectricElectrical103/21/2026
Preserv BLD Restoration ManagementGeneral Contractor110/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843107/09/2026
Crosscheck Inspection Services544107/13/2023
Building Lifecycle
All (76)Filed (13)Permit Issued (19)Signed Off (4)Violation (2)Inspection (3)Objection (26)Special Inspection (9)
09/30/2026
Permit issued — General Construction
B01382318-I1-GC
09/09/2026
Permit issued — Sidewalk Shed
B00595265-I1-SH
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Special inspection requirement — Post-installed Anchors
08/03/2026
Objection raised — Scope
08/03/2026
Objection raised — Admin
08/03/2026
Objection raised — Scope
08/03/2026
Objection raised — Inspections
07/09/2026
Filed — Alteration
FACADE RESTORATION: SAW CUT AND POINTING, BRICK REPLACEMENT, WINDOW TRIM REPLACEMENT, COPING/CAP REPLACEMENT, REMOVE PAINT AND APPLY COATING AS PER PLANS FILED. NOT CHANGE IN USE, EGRESS OR OCCUPANCY.
B01382318-I1
05/29/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2026
Special inspection requirement — Masonry
04/02/2026
Special inspection requirement — Final
04/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/17/2026
Filed — Alteration
B01360379-I1
02/17/2026
Permit issued — Supported Scaffold
B01360379-I1-SF
11/18/2025
Violation issued (HPD, closed)
I
09/08/2025
Permit issued — Sidewalk Shed
B00595265-I1-SH
09/11/2024
Permit issued — Sidewalk Shed
B00595265-I1-SH
12/28/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00595283-I1
09/12/2023
Permit issued — Supported Scaffold
B00595283-I1-SF
09/12/2023
Permit issued — Sidewalk Shed
B00595265-I1-SH
07/25/2023
Permit issued — Protection and Mechanical Methods
B00774485-I1-PM
07/18/2023
Objection raised — Structural
07/18/2023
Objection resolved — Addressed
07/18/2023
Objection raised — Energy
07/18/2023
Objection resolved — Addressed
07/18/2023
Objection raised — Inspections
07/18/2023
Objection resolved — Addressed
07/18/2023
Objection raised — Admin
07/18/2023
Objection resolved — Addressed
07/18/2023
Objection raised — Inspections
07/18/2023
Objection resolved — Addressed
07/18/2023
Objection raised — Other
07/18/2023
Objection resolved — Addressed
07/18/2023
Objection raised — Scope
07/18/2023
Objection resolved — Addressed
07/18/2023
Objection raised — Scope
07/18/2023
Objection resolved — Addressed
07/18/2023
Objection raised — Other
07/18/2023
Objection resolved — Addressed
07/13/2023
Filed — Alteration
Filing for exterior facade restoration
B00583068-I1
05/22/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
B00595265-P1
02/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
Withdrawn
09/15/2022
Permit issued — Supported Scaffold
B00595283-I1-SF
09/15/2022
Permit issued — Sidewalk Shed
B00595265-I1-SH
07/22/2022
Permit issued — Protection and Mechanical Methods
B00774485-I1-PM
07/21/2022
Filed — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00774485-I1
07/06/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00595283-P2
05/25/2022
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
05/25/2022
Special inspection requirement — Masonry
EUGENE BIFULCO
04/20/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00353536-I1
03/25/2022
Signed off — Alteration
B00565406-I1
10/08/2021
Permit issued — Sidewalk Shed
B00353536-I1-SH
09/29/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00595283-P1
09/28/2021
Permit issued — Sidewalk Shed
B00595265-I1-SH
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPreserv BLD Restoration Management09/30/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/09/2026
DOB NOWSupported ScaffoldPermit IssuedAndamio Scaffolding02/17/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/08/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/11/2024
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/12/2023
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/12/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedPreserv BLD Restoration Management07/25/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/15/2022
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/15/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedPreserv BLD Restoration Management07/22/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/08/2021
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/28/2021
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/24/2021
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/15/2021
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding07/29/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding06/15/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding06/19/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding11/08/2019
BISOTISSUEDMSR Construction03/12/2015
BISEQISSUEDHKS Construction02/26/2015
BISEQISSUEDHKS Construction02/25/2015
BISOTISSUEDMacc Enterprises One07/11/2014
BISEQISSUEDB H & B Construction07/07/2014
BISEQISSUEDB H & B Construction06/13/2014
BISOTISSUEDMSR Construction06/02/2014
BISPLISSUEDAbr Plumbing & Heating Contracting02/10/2014
BISOTISSUEDElite Contracting & Home Imp11/19/2013
BISOTISSUEDVantage Associates02/01/2002
BISOTISSUEDVantage Associates10/10/2001
BISMHISSUEDCellular Telephone Co06/06/2000
BISMHISSUEDCellular Phone Co AT&T Wireless11/12/1996
2 projects · most recent 08/07/2026
General Wiring
FiledStatusContractorScope
08/07/2026Permit IssuedMac Elect'l ContractingGeneral Wiring
11/06/2019Permit IssuedBorowide Elect'l Contractors—
1 project · most recent 05/22/2023
Sidewalk Shed
FiledStatusContractorScope
05/22/2023Permit IssuedAndamio ScaffoldingSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/04/2026Post-installed Anchors—special
04/02/2026Masonry—special
04/02/2026Final—progress
04/02/2026Tenant Protection Plan Compliance—special
02/01/2023Tenant Protection Plan ComplianceWithdrawnspecial
05/25/2022Post-installed AnchorsEUGENE BIFULCOspecial
05/25/2022MasonryEUGENE BIFULCOspecial
08/25/2021FinalEUGENE BIFULCOprogress
07/30/2021FinalSunil Saigalprogress
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch10
09/01/2026B00565406-I1Request digital key ↗
09/01/2026B00595283-P2Request digital key ↗
09/01/2026B00595283-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00259713-I1Request digital key ↗
09/02/2026B00353536-I1Request digital key ↗
08/15/2026B00353536-P1Request digital key ↗
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION9
03/25/2015321005657Open ↗
03/09/2015340153862Open ↗
03/03/2015340162077Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
11/14/2016321470029Open ↗
05/20/2016321390339Open ↗
07/24/2014321200687Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLPC Approval/Permit2
08/15/2026B01382318-I1Open ↗
08/13/2026B00583068-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026B00259713-I1Open ↗
09/01/2026B00565406-I1Open ↗
09/01/2026B00595283-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
11/14/2016321470029Open ↗
05/20/2016321390339Open ↗
12/16/2015321005657Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/11/2014321005657Open ↗
07/06/2014340162077Open ↗
06/12/2014340153862Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/24/2014321200687Open ↗
07/11/2014321005657Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/06/2014340162077Open ↗
06/12/2014340153862Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/06/2014340162077Open ↗
06/12/2014340153862Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00583068-I1Open ↗
08/23/2026B00353536-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/24/2014321200687Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00583068-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
07/09/2014320786556Open ↗
06/06/2014320786556Open ↗
▸BISSCHEDULE B - PLUMBING1
07/17/2013320786556Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan3
08/13/2026B00259713-I1Open ↗
08/13/2026B00353536-I1Open ↗
08/13/2026B00353536-P1Open ↗
▸BISTenant Protection Plan and Notes2
07/01/2016321390339Open ↗
05/20/2016321390339Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/14/2016321470029Open ↗
08/16/2013320786556Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00583068-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026B01382318-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/14/2016321470029Open ↗
05/20/2016321390339Open ↗
07/21/2014320786556Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/06/2014340162077Open ↗
06/12/2014340153862Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLANDMARKS APPROVAL5
07/01/2016321390339Open ↗
12/16/2015321005657Open ↗
07/06/2014340162077Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/24/2014321200687Open ↗
07/11/2014321005657Open ↗
07/17/2013320786556Open ↗
▸BISSUPERSEDING LETTER2
03/09/2015340153862Open ↗
03/03/2015340162077Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/16/2015321005657Open ↗
12/15/2014320786556Open ↗
▸BISSHED LETTER1
03/09/2015340153862Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
11/14/2016321470029Open ↗
05/20/2016321390339Open ↗
12/16/2015321005657Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
11/14/2016321470029Open ↗
05/20/2016321390339Open ↗
07/24/2014321200687Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/06/2014340162077Open ↗
06/12/2014340153862Open ↗
▸Other Documents2
▸BISOP-4 - Special Report1
07/30/2014320786556Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026B00583068-I1Open ↗