← Back
Multi-story retail building (2+)
431 WEST 16 STREET
MANHATTAN · BIN 1012543
💬 Discuss this project
1950Year Built
2Stories
K2Building Class
C6-3Zoning
15,200 sfGross Floor Area
1Units
3 Open Violations 2 unresolved · 1 paperwork only ▸
Multi-story retail building (2+) · Owner of record: MCPJF W. 16TH LLC · 6,884 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof2p · 2 filings · 20 docs
Floor 31p · 1 filing · 12 docs
Floor 21p · 1 filing · 12 docs
Floor 1
Nothing on file for this building.
Building Lifecycle
All (101)Filed (6)Permit Issued (5)Signed Off (3)Violation (55)Inspection (1)Objection (2)Special Inspection (29)
07/31/2026
Filed — Alteration
PROPOSE NEW ALUMINUM STOREFRONT GLAZING WITHIN ENLARGED OPENING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01417351-I1
06/17/2026
Special inspection requirement — Fenestration air leakage
06/17/2026
Special inspection requirement — Fenestration areas
06/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
06/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/28/2025
Signed off — Alteration
To remove Daikin UNIT , model # DX11SAC903AA from roof top.
M01229108-I1
09/09/2025
Permit issued — Mechanical Systems
M01229108-I1-MS
06/30/2025
Objection resolved — Addressed
06/23/2025
Objection raised — Scope
06/03/2025
Filed — Alteration
To remove Daikin UNIT , model # DX11SAC903AA from roof top.
M01229108-I1
05/20/2025
Special inspection requirement — Mechanical Systems
RAYMOND CALAMARI
05/20/2025
Special inspection requirement — Final
LUZ MORAIMA DISLA
03/27/2023
Signed off — Alteration
RESURFACE FLOORS, WALLS AND CEILINGS. REPLACE A/C UNITS AT ROOFTOP. MODIFY EXISTING INTERIOR DUCTWORK - IF REQUIRED.
M00746166-I1
03/20/2023
Permit issued — Mechanical Systems
M00746166-I1-MS
01/17/2023
Signed off — Alteration
REPLACE ALL PLUMBING FIXTURES IN EXISTING LOCATIONS.
M00754716-I1
01/17/2023
Special inspection requirement — Final
Paul Gregory
01/17/2023
Special inspection requirement — Mechanical Systems
Paul Gregory
01/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Gregory
01/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Gregory
01/17/2023
Special inspection requirement — Ventilation and air distribution system
Paul Gregory
01/17/2023
Special inspection requirement — Maintenance information
Paul Gregory
01/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Gregory
01/17/2023
Special inspection requirement — Insulation placement and R values
Paul Gregory
01/17/2023
Special inspection requirement — Shutoff dampers
Paul Gregory
01/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Gregory
01/16/2023
Filed — Alteration
RESURFACE FLOORS, WALLS AND CEILINGS. REPLACE A/C UNITS AT ROOFTOP. MODIFY EXISTING INTERIOR DUCTWORK - IF REQUIRED.
M00746166-P1
01/07/2023
Special inspection requirement — Shutoff dampers
Paul Gregory
01/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Gregory
01/07/2023
Special inspection requirement — Final
Paul Gregory
01/07/2023
Special inspection requirement — Ventilation and air distribution system
Paul Gregory
01/07/2023
Special inspection requirement — Maintenance information
Paul Gregory
01/07/2023
Special inspection requirement — Insulation placement and R values
Paul Gregory
01/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Gregory
01/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Gregory
01/07/2023
Special inspection requirement — Mechanical Systems
Paul Gregory
01/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Gregory
01/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Gregory
01/02/2023
Filed — Alteration
REPLACE ALL PLUMBING FIXTURES IN EXISTING LOCATIONS.
M00754716-P1
12/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Gregory
12/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/16/2022
Permit issued — Plumbing
M00754716-I1-PL
09/15/2022
Permit issued — Plumbing
M00754716-I1-PL
09/07/2022
Permit issued — Mechanical Systems
M00746166-I1-GC
06/16/2022
Filed — Alteration
RESURFACE FLOORS, WALLS AND CEILINGS. REPLACE A/C UNITS AT ROOFTOP. MODIFY EXISTING INTERIOR DUCTWORK - IF REQUIRED.
M00746166-I1
06/16/2022
Filed — Alteration
REPLACE ALL PLUMBING FIXTURES IN EXISTING LOCATIONS.
M00754716-I1
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2021
Violation issued (ECB, open)
Elevators
01/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/29/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/29/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2018
Violation issued (ECB, closed)
Construction
08/09/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/18/2018
Violation issued (ECB, closed)
Elevators
06/27/2018
Violation issued (ECB, closed)
Construction
05/16/2018
Violation issued (ECB, closed)
Construction
04/26/2018
Violation issued (ECB, closed)
Construction
Latest 60 of 101 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOWERY PRESENTS1407/08/2026
CACTUS HOLDINGS407/08/2026
MCPJFW W. 16TH LLC3103/22/2026
MCPJF 16TH LLC103/22/2026
MCJJF W16TH LLC203/22/2026
MCPJFW 16 LLC203/22/2026
MCPIF 16TH LLC103/22/2026
17TH AND 10TH ASSC. LLC103/22/2026
17TH AND 10TH ASSOC LLC203/22/2026
17 & 10 ASSOCIATED LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX ENGINEERING, PLLC107/31/2026
ARCALHEK106/03/2025
FEINGOLD AND GREGORY ARCH.401/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOREN INTERNATIONAL803/21/2026
A&A BUILDING CONSULTANTS INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOLOR INCGeneral Contractor203/21/2026
A&A PLUMBING CORPPlumbing207/08/2026
A&A BUILDING CONSULTANTSGeneral Contractor107/08/2026
DYNAMIC SHEET METAL LTDGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCALHEK PC3340106/03/2025
FEINGOLD & GREGORY ARCHIT979401/16/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offA&A BUILDING CONSULTANTS09/09/2025
DOB NOWMechanical SystemsSigned-offDYNAMIC SHEET METAL03/20/2023
DOB NOWPlumbingSigned-offA&A PLUMBING CORP12/16/2022
DOB NOWPlumbingSigned-offA&A PLUMBING CORP09/15/2022
DOB NOWMechanical SystemsSigned-offFOLOR INC09/07/2022
BISOTISSUEDALEX & TOM CONSTRUCTION A12/04/2012
BISOTISSUEDALEX & TOM CONSTRUCTION A10/01/2012
BISOTISSUEDALEX & TOM CONSTRUCTION A10/01/2012
BISOTISSUEDALEX & TOM CONSTRUCTION A09/18/2012
BISFPISSUEDFIRE COMMAND CO INC08/07/2007
BISPLISSUEDAMERICAN NATIONAL05/04/2007
BIS—ISSUEDMCP JF WEST 16TH STREET04/24/2007
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM04/18/2007
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP04/11/2007
BISMHISSUEDMCP JF04/10/2007
BISFSISSUEDACE-ATLAS PLBG & HTG LLC04/10/2007
BISMHISSUEDELITE NESS USA,INC03/27/2007
BISPLISSUEDAMERICAN NATIONAL PLBG & HTG CO03/22/2007
BISMHISSUEDELITE NESS USA,INC03/21/2007
BIS—ISSUEDELITE NESS USA,INC03/09/2007
BISOTISSUEDELITE NESS USA,INC03/09/2007
BIS—ISSUEDMONTANA ELECTRICAL DECORATION11/30/2006
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP10/05/2006
BISOTISSUEDMCPJF W 16TH LLC10/02/2006
BIS—ISSUEDMCP JF WEST 16TH STREET05/31/2006
BISOTISSUEDMCPJF W 16TH LLC02/22/2006
BISOTISSUEDMCPJF W. 16TH LLC01/12/2006
BISOTISSUEDDASE LLC08/20/2003
BISFPISSUEDMASTER FIRE SYSTEMS, INC07/25/2003
BISOTISSUEDSKYLINE DEVELOPMENT GROUP INC.11/26/2002
BISMHISSUEDSKYLINE DEVELOPMENT GROUP INC.11/07/2002
BISPLISSUEDDOVAL PLBG & HTG CORP09/09/2002
BIS—ISSUEDROCHA CONSTRUCTION INC.08/15/2002
BISMHISSUEDROCHA CONSTRUCTION INC.08/15/2002
BIS—ISSUEDGKAM12/28/1999
BISFPISSUEDACTIVE FIRE EXTINGUISHER INC.12/22/1999
BISSPISSUEDC.R.U. MECHAN & HEATIN IN12/03/1999
BISPLISSUEDC.R.U. MECHAN & HEAT INC12/02/1999
BIS—ISSUEDGKAM11/17/1999
BISOTISSUEDGKAM08/24/1999
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
06/17/2026Fenestration air leakage—energy_progress
06/17/2026Fenestration areas—energy_progress
06/17/2026Fenestration and door U-factor and product ratings—energy_progress
06/17/2026Energy Code Compliance Inspections—progress
06/17/2026Structural Stability – Alterations of existing buildings—special
05/20/2025Mechanical SystemsRAYMOND CALAMARIspecial
05/20/2025FinalLUZ MORAIMA DISLAprogress
01/17/2023FinalPaul Gregoryprogress
01/17/2023Mechanical SystemsPaul Gregoryspecial
01/17/2023Fire-Resistant Penetrations and JointsPaul Gregoryspecial
01/17/2023Energy Code Compliance InspectionsPaul Gregoryprogress
01/17/2023Ventilation and air distribution systemPaul Gregoryenergy_progress
01/17/2023Maintenance informationPaul Gregoryenergy_progress
01/17/2023HVAC-R and service water heating system controlsPaul Gregoryenergy_progress
01/17/2023Insulation placement and R valuesPaul Gregoryenergy_progress
01/17/2023Shutoff dampersPaul Gregoryenergy_progress
01/17/2023HVAC-R and service water heating equipmentPaul Gregoryenergy_progress
01/07/2023Shutoff dampersPaul Gregoryenergy_progress
01/07/2023HVAC-R and service water heating system controlsPaul Gregoryenergy_progress
01/07/2023FinalPaul Gregoryprogress
01/07/2023Ventilation and air distribution systemPaul Gregoryenergy_progress
01/07/2023Maintenance informationPaul Gregoryenergy_progress
01/07/2023Insulation placement and R valuesPaul Gregoryenergy_progress
01/07/2023HVAC-R and service water heating equipmentPaul Gregoryenergy_progress
01/07/2023Energy Code Compliance InspectionsPaul Gregoryprogress
Latest 25 of 29.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026M00754716-P1Request digital key ↗
09/01/2026M00754716-I1Request digital key ↗
09/01/2026M00746166-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION6
12/13/2022104635138Open ↗
09/14/2012121376475Open ↗
09/06/2012121158399Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
12/10/2012121376475Open ↗
10/02/2012121158399Open ↗
10/02/2012121158399Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY2
12/06/2022104635138Open ↗
11/18/2022104635138Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature17
08/29/2026M00746166-I1Open ↗
08/29/2026M00746166-I1Open ↗
08/29/2026M00746166-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026M00746166-I1Open ↗
08/29/2026M00746166-I1Open ↗
08/27/2026M01229108-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026M00754716-P1Open ↗
09/01/2026M00754716-I1Open ↗
09/01/2026M00746166-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION4
09/21/2012121158399Open ↗
09/14/2012121376475Open ↗
08/08/2012121158399Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWHPD-1: Anti-Harassment Area Checklist4
08/13/2026M00754716-P1Open ↗
08/13/2026M00754716-I1Open ↗
08/13/2026M00746166-I1Open ↗
Showing 3 of 4 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist2
09/21/2012121158399Open ↗
09/18/2012121376475Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026M00754716-I1Open ↗
09/01/2026M00754716-P1Open ↗
09/01/2026M00746166-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M00746166-I1Open ↗
08/13/2026M00754716-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026M00754716-I1Open ↗
08/13/2026M00746166-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/08/2012121158399Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/22/2022104635138Open ↗
11/21/2022104635138Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00746166-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00746166-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
09/14/2012121376475Open ↗
08/08/2012121158399Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/21/2012121158399Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
10/29/2009104666470Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/14/2012121376475Open ↗
08/08/2012121158399Open ↗
08/08/2012121158399Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
09/14/2012121376475Open ↗
08/08/2012121158399Open ↗
08/08/2012121158399Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/18/2012121376475Open ↗