← Back
BuildNYC
School or academy
Inwood Academy
431 WEST 204TH STREET · Inwood · BIN 1081902
💬 Discuss this project
1955Year Built
3Stories
W3Building Class
R7AZoning
72,850 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 2 old, status unconfirmed ▸
School or academy · Owner of record: Church of St Jude · 25,180 sf lot · 2.89 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Inwood Academy4p · 2 filings · 6 docs
Floor 2Inwood Academy4p · 2 filings · 6 docs
Floor 1Inwood Academy4p · 2 filings · 6 docs
CellarChurchof St. Jude14p · 1 filing · 11 docs
Site & exteriorInwood Academy7p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Jude's School603/21/2026
Church of St Jude203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pvedi Engineering, Architecture & G202/26/2026
Asif Jamil, RA108/27/2021
Paul Perdek, Prof. Engineering204/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Northeast Expediting403/21/2026
AE Design Solution403/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold303/21/2026
Illuminous ElectricElectrical203/21/2026
Apache Legend GroupScaffold203/21/2026
Swing StagingScaffold203/21/2026
Tri Borough ScaffoldingScaffold107/08/2026
Demar MechanicalPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ase Engineering5785202/26/2026
AR-Tech Engineering6659104/05/2021
Building Lifecycle
All (48)Filed (5)Permit Issued (5)Signed Off (3)Violation (7)Inspection (2)Objection (20)Special Inspection (6)
04/22/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
alon egozi
04/15/2026
Special inspection requirement — Post-installed Anchors
alon egozi
02/26/2026
Filed — Alteration
STORMWATER PLUMBING REDESIGN AS PER PLANS. INCL INSTALL'N OF NEW STORMWATER DRAINAGE PIPING SEGMENTS THROUGHOUT BLDG FOR FULL SEPARATION FROM EXT'G SANITARY DRAINAGE PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01203530-P1
02/09/2026
Special inspection requirement — Post-installed Anchors
alon egozi
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
alon egozi
09/15/2025
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
07/16/2025
Permit issued — Plumbing
M01203530-I1-PL
07/01/2025
Filed — Alteration
STORMWATER PLUMBING REDESIGN AS PER PLANS. INCL INSTALL'N OF NEW STORMWATER DRAINAGE PIPING SEGMENTS THROUGHOUT BLDG FOR FULL SEPARATION FROM EXT'G SANITARY DRAINAGE PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01203530-I1
12/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00493656-I1
10/24/2024
Permit issued — Protection and Mechanical Methods
M00493656-I1-PM
10/03/2023
Signed off — Alteration
M00584036-I1
09/08/2023
Permit issued — Sidewalk Shed
M00584036-I1-SH
08/27/2021
Filed — Alteration
M00584036-I1
08/19/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00372512-I1
05/18/2021
Permit issued — Protection and Mechanical Methods
M00493656-I1-PM
04/27/2021
Special inspection requirement — Post-installed Anchors
ALBERTO ROMAN
04/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALBERTO ROMAN
04/08/2021
Objection raised — Structural
04/08/2021
Objection resolved — Addressed
04/08/2021
Objection raised — Structural
04/08/2021
Objection resolved — Addressed
04/06/2021
Objection raised — Fire_Protection
04/06/2021
Objection resolved — Addressed
04/06/2021
Objection raised — Admin
04/06/2021
Objection resolved — Addressed
04/06/2021
Objection raised — Other
04/06/2021
Objection resolved — Addressed
04/06/2021
Objection raised — Scope
04/06/2021
Objection resolved — Addressed
04/06/2021
Objection raised — Inspections
04/06/2021
Objection resolved — Addressed
04/06/2021
Objection raised — Inspections
04/06/2021
Objection resolved — Addressed
04/06/2021
Objection raised — Scope
04/06/2021
Objection resolved — Addressed
04/06/2021
Objection raised — Admin
04/06/2021
Objection resolved — Addressed
04/05/2021
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00493656-I1
03/19/2021
Violation issued (ECB, closed)
Construction
03/19/2021
Violation issued (ECB, closed)
Construction
03/19/2021
Violation issued (ECB, closed)
Unknown
09/03/2020
Permit issued — Supported Scaffold
M00372512-I1-SF
08/11/2020
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00372512-I1
02/02/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2016
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
06/02/2016
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDemar Mechanical07/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offApache Legend Group10/24/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offSwing Staging05/18/2021
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding09/03/2020
BISOTISSUED2260 Mag10/27/2020
BISOTISSUED2260 Mag08/20/2020
BISFSISSUEDPalladino Heating Service09/08/2014
BISPLISSUED24 Seven Plumbing08/20/2014
BISOTISSUEDQuedan Construction Services08/04/2014
BISFPISSUEDLund Fire Products Co09/20/2012
1 project · most recent 02/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/26/2026Permit IssuedDemar MechanicalStorm, Water/Sanitary
2 projects · most recent 12/15/2021
General Wiring
FiledStatusContractorScope
12/15/2021CompleteIlluminous Electric—
12/07/2021CompleteIlluminous ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/22/2026Pass-Final PL - UndergroundPassView ↗
09/15/2025Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/15/2026Fire-Resistant Penetrations and Jointsalon egozispecial
04/15/2026Post-installed Anchorsalon egozispecial
02/09/2026Post-installed Anchorsalon egozispecial
02/09/2026Fire-Resistant Penetrations and Jointsalon egozispecial
04/27/2021Post-installed AnchorsALBERTO ROMANspecial
04/27/2021Structural Stability – Alterations of existing buildingsALBERTO ROMANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Churchof St. JudeReligiousCellar
Project M01203530 Alteration · Permit Entire · 07/01/2025
Inwood AcademyEducationFloors 1–3
Project M00584036 Alteration · LOC Issued · 08/27/2021
Project M00493656 Alteration · LOC Issued · 04/05/2021
Project M00372512 Alteration · LOC Issued · 08/11/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
09/03/2026M00584036-I1Request digital key ↗
08/19/2026M01203530-P1Request digital key ↗
08/19/2026M01203530-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00372512-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
01/13/2022123880737Open ↗
12/30/2021123880737Open ↗
10/18/2019123880737Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION6
08/20/2020123880737Open ↗
09/09/2014122125388Open ↗
09/09/2014122125388Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
10/21/2019123880737Open ↗
12/04/2014122068127Open ↗
12/04/2014122068127Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M01203530-I1Open ↗
09/02/2026M01203530-I1Open ↗
08/23/2026M01203530-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00584036-I1Open ↗
08/19/2026M01203530-I1Open ↗
08/19/2026M01203530-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/18/2019123880737Open ↗
09/09/2014122125388Open ↗
07/23/2014122068127Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/21/2019123880737Open ↗
09/09/2014122125388Open ↗
07/23/2014122068127Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/23/2014122068127Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/29/2014122068127Open ↗
▸BISSCHEDULE B - PLUMBING1
08/27/2012121352810Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/09/2014122125388Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/09/2014122125388Open ↗
07/23/2014122068127Open ↗
08/27/2012121352810Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026M01203530-P1Open ↗
08/19/2026M01203530-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/05/2020123880737Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/21/2019123880737Open ↗
12/04/2014122068127Open ↗
09/09/2014122125388Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/03/2022123880737Open ↗
12/30/2021123880737Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/19/2022123880737Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/19/2022123880737Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/19/2022123880737Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/04/2014122068127Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/19/2022123880737Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/03/2022123880737Open ↗
12/30/2021123880737Open ↗
▸BISMASONRY1
01/19/2022123880737Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026M01203530-P1Open ↗
08/13/2026M01203530-I1Open ↗
08/13/2026M00372512-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/21/2022123880737Open ↗
12/04/2014122068127Open ↗
▸BISFINAL1
01/19/2022123880737Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/27/2012121352810Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
12/30/2021123880737Open ↗
10/21/2019123880737Open ↗
12/04/2014122068127Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/19/2022123880737Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET5
10/18/2019123880737Open ↗
09/09/2014122125388Open ↗
07/23/2014122068127Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
01/13/2022123880737Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/09/2014122125388Open ↗