← Back
BuildNYC
Over six families without stores
431 WYTHE AVENUE
BROOKLYN · BIN 3059566
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
4,400 sfGross Floor Area
8Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 431-433 Wythe Property Owner · 1,305 sf lot · 3.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof16p · 1 filing · 20 docs
Floor 412p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installation4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Holliswood 2Ave2607/08/2026
431-433 Wythe Property Owner203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jon Powell Architecture506/09/2025
Arquitectura Varela101/02/2025
Jag Engineering203/07/2024
Me Engineers102/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nexus Consulting NYC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Envision Design & ConstructionGeneral Contractor807/08/2026
MNK Enterprises NYScaffold107/08/2026
Envision Design Constructionspecialty_contractor107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
Paul Commodore & SonsPlumbing210/06/1998
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS Engineering & Consulting3652706/09/2025
Building Lifecycle
05/23/2026
§ 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY LOCK AND LATCH SET AT BUILDING FRONT…
HPD violation · closed
05/23/2026
§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE AT VESTIBULE DOOR , 1st STORY
HPD violation · closed
05/23/2026
§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE AT BUILDING FRONT ENTRANCE DOOR ,…
HPD violation · closed
11/25/2025
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
07/07/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01160994-I1
75 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEnvision Design & Construction04/28/2025
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY01/02/2025
DOB NOWMechanical SystemsSigned-offEnvision Design & Construction12/18/2024
DOB NOWGeneral ConstructionSigned-offEnvision Design & Construction12/18/2024
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS11/29/2024
DOB NOWStructuralSigned-offEnvision Design & Construction05/09/2024
DOB NOWGeneral ConstructionSigned-offEnvision Design & Construction05/07/2024
BISBLISSUEDPaul Commdore & Sons10/06/1998
BISPLISSUEDPaul Commdore & Sons10/06/1998
2 projects · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026CompleteInfiniti ElectricGeneral Wiring
01/03/2025CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
06/17/2025Structural Stability – Alterations of existing buildingsNARI MOTWANIspecial
06/17/2025Tenant Protection Plan ComplianceNARI MOTWANIspecial
06/17/2025FinalJonathan Powellprogress
06/17/2025Energy Code Compliance InspectionsNARI MOTWANIprogress
06/17/2025Lighting in dwelling unitsNARI MOTWANIenergy_progress
06/17/2025Interior lighting powerNARI MOTWANIenergy_progress
06/17/2025Lighting controlsNARI MOTWANIenergy_progress
02/28/2025Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
02/28/2025Tenant Protection Plan Compliance—special
03/11/2024FinalJosh Greggprogress
03/11/2024Construction Operations Influencing Adjacent StructuresNARI MOTWANIspecial
03/11/2024Structural Stability – Alterations of existing buildingsNARI MOTWANIspecial
03/11/2024MasonryNARI MOTWANIspecial
03/11/2024Tenant Protection Plan ComplianceNARI MOTWANIspecial
02/28/2024HVAC-R and service water heating system controlsNARI MOTWANIenergy_progress
02/28/2024Shutoff dampersNARI MOTWANIenergy_progress
02/28/2024HVAC-R and service water heating equipmentNARI MOTWANIenergy_progress
02/28/2024HVAC-R and service water piping design and insulationNARI MOTWANIenergy_progress
02/28/2024Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
02/28/2024Energy Code Compliance InspectionsNARI MOTWANIprogress
02/27/2024Tenant Protection Plan ComplianceNARI MOTWANIspecial
02/21/2024FinalBrian Shassianprogress
02/21/2024Mechanical SystemsNARI MOTWANIspecial
48 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account