Miscellaneous two family
432 15 STREET
BROOKLYN · BIN 3026689
💬 Discuss this project
1891Year Built
2Stories
B9Building Class
R6BZoning
2,160 sfGross Floor Area
2Units
Miscellaneous two family · 1,817 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction5p · 1 filing · 10 docs
Floor 2Under Construction8p · 1 filing · 10 docs
Floor 1Under Construction8p · 1 filing · 10 docs
Sub-BasementUnder Construction3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A D GENERAL CONTRACTORS809/02/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2024$2.4M—Private party → Private party$1,116/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VOLUME SPACE CONSULTING INC.102/19/2026
HM LOKE CONSULTING ENGINEERING PC102/18/2026
PETER V STOREY308/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BURNHAM NATIONWIDE INC403/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZITAN BILT INCGeneral Contractor508/27/2026
A & D GENERAL CONTR INCGeneral Contractor409/02/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
RRP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LT INSPECTIONS INC9795102/18/2026
Building Lifecycle
All (56)Filed (5)Permit Issued (11)Inspection (8)Objection (24)Special Inspection (8)
09/01/2026
Permit issued — Supported Scaffold
B01361939-I1-SH
08/26/2026
Permit issued — Structural
B01359092-I1-ST
08/26/2026
Permit issued — General Construction
B01158902-I1-GC
04/21/2026
Permit issued — Supported Scaffold
B01361939-I1-SH
03/04/2026
Permit issued — Structural
B01359092-I1-ST
02/19/2026
Filed — Alteration
B01361939-I1
02/19/2026
Permit issued — Supported Scaffold
B01361939-I1-SH
02/19/2026
Permit issued — Sidewalk Shed
B01361939-I1-SF
02/18/2026
Filed — Alteration
B01359092-I1
02/12/2026
Special inspection requirement — Final
Chih Hsu
02/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chih Hsu
02/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Chih Hsu
02/12/2026
Special inspection requirement — Structural Steel - Welding
Chih Hsu
02/12/2026
Special inspection requirement — Structural Steel - Details
Chih Hsu
01/09/2026
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
12/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/16/2025
Objection resolved — Addressed
10/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2025
Permit issued — Plumbing
B01158902-S1-PL
10/09/2025
Permit issued — General Construction
B01158902-I1-GC
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/03/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/26/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/18/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/16/2025
Objection raised — Scope
09/16/2025
Objection raised — Scope
08/28/2025
Objection raised — Zoning
08/26/2025
Filed — Alteration
GENERAL CONSTRUCTION, REPLACEMENT OF WINDOWS AND DOORS, NEW DECK AND DECK OPENING AT REAR FACADE AS PER DRAWINGS FILED HEREWITH.
B01277518-I1
08/26/2025
Special inspection requirement — Final
04/23/2025
Permit issued — Plumbing
B01158902-S1-PL
04/21/2025
Permit issued — General Construction
B01158902-I1-GC
02/10/2025
Objection raised — Admin
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Admin
02/10/2025
Objection resolved — Addressed
02/07/2025
Objection resolved — Addressed
02/07/2025
Objection resolved — Addressed
02/07/2025
Objection resolved — Addressed
02/07/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Scope
01/24/2025
Objection raised — Admin
01/23/2025
Filed — Alteration
Partial renovation of BASEMENT, 1ST AND 2ND floors. Construction includes the removal of non-load bearing interior partitions, new millwork, flooring and finishes. no change in use, egress or occupancy is included in this application
B01158902-S1
01/03/2025
Objection raised — Fire_Protection
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection raised — Fire_Protection
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection raised — Other
01/03/2025
Objection raised — Admin
01/03/2025
Objection raised — Admin
01/03/2025
Objection resolved — Addressed
01/02/2025
Filed — Alteration
Partial renovation of BASEMENT, 1ST AND 2ND floors. Construction includes the removal of non-load bearing interior partitions, new millwork, flooring and finishes. no change in use, egress or occupancy is included in this application
B01158902-I1
12/27/2024
Special inspection requirement — Lighting in dwelling units
Peter Storey
12/27/2024
Special inspection requirement — Final
Peter Storey
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedA & D GENERAL CONTR INC09/01/2026
DOB NOWStructuralSigned-offZITAN BILT INC08/26/2026
DOB NOWGeneral ConstructionPermit IssuedZITAN BILT INC08/26/2026
DOB NOWSupported ScaffoldPermit IssuedA & D GENERAL CONTR INC04/21/2026
DOB NOWStructuralSigned-offZITAN BILT INC03/04/2026
DOB NOWSupported ScaffoldPermit IssuedA & D GENERAL CONTR INC02/19/2026
DOB NOWSidewalk ShedPermit IssuedA & D GENERAL CONTR INC02/19/2026
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP10/14/2025
DOB NOWGeneral ConstructionPermit IssuedZITAN BILT INC10/09/2025
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC04/23/2025
DOB NOWGeneral ConstructionPermit IssuedZITAN BILT INC04/21/2025
1 project · most recent 01/23/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/23/2025Permit IssuedRRP PLUMBING CORPGas, Water/Sanitary
3 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
09/02/2025Permit IssuedHV ELECTRIC CORPGeneral Wiring
04/30/2025Permit IssuedHV ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/09/2026Fail-Final SP - Up to 3 Requested FloorsFailView ↗
12/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/26/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/12/2026FinalChih Hsuprogress
02/12/2026Structural Stability – Alterations of existing buildingsChih Hsuspecial
02/12/2026Structural Steel - High Strength BoltingChih Hsuspecial
02/12/2026Structural Steel - WeldingChih Hsuspecial
02/12/2026Structural Steel - DetailsChih Hsuspecial
08/26/2025Final—progress
12/27/2024Lighting in dwelling unitsPeter Storeyenergy_progress
12/27/2024FinalPeter Storeyprogress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01158902-I1Request digital key ↗
08/23/2026B01158902-S1Request digital key ↗
08/20/2026B01277518-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B01158902-S1Open ↗
08/13/2026B01359092-I1Open ↗
08/13/2026B01158902-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026B01361939-I1Open ↗
08/13/2026B01359092-I1Open ↗
08/13/2026B01158902-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B01359092-I1Open ↗
08/28/2026B01359092-I1Open ↗
08/28/2026B01359092-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01158902-I1Open ↗
09/01/2026B01158902-I1Open ↗
08/28/2026B01359092-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B01158902-S1Open ↗
08/13/2026B01158902-I1Open ↗
08/13/2026B01359092-I1Open ↗
Showing 3 of 4 on file for this type