← Back
Two family frame
432 FENIMORE STREET
BROOKLYN · BIN 3107280
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R6Zoning
1,760 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: T PROPERTIES LLC · 1,936 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
Architecture
Roof14p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T PROPERTIES LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/26/2014$300K—— → —$170/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHAQ903/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JCVC GENERAL CONSTRUCTIONGeneral Contractor407/08/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524903/26/2026
Building Lifecycle
All (93)Filed (9)Permit Issued (3)Signed Off (3)Violation (5)Inspection (7)Objection (36)Special Inspection (30)
04/07/2026
Signed off — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-I1
04/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
04/03/2026
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
04/03/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
04/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
04/03/2026
Special inspection requirement — Fenestration areas
Shahrish Shuvo
04/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
04/03/2026
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
04/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
04/03/2026
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
03/31/2026
Objection raised — Cost
03/31/2026
Objection resolved — Addressed
03/26/2026
Filed — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-P8
03/26/2026
Objection raised — Zoning
03/26/2026
Objection resolved — Addressed
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
03/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
03/26/2026
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
03/26/2026
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
03/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
03/26/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
03/26/2026
Special inspection requirement — Fenestration areas
Shahrish Shuvo
03/26/2026
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
09/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/24/2025
Signed off — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-S2
06/24/2025
Signed off — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-S1
06/24/2025
Violation issued (ECB, closed)
Construction
03/12/2025
Filed — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-P4
03/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
03/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
03/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
03/12/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
03/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
03/10/2025
Filed — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-P6
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
03/07/2025
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
03/07/2025
Special inspection requirement — Final
Shahrish Shuvo
03/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
03/05/2025
Filed — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-P5
01/16/2025
Filed — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-P2
01/08/2025
Violation issued (ECB, closed)
Construction
01/08/2025
Violation issued (ECB, closed)
Construction
01/08/2025
Violation issued (ECB, closed)
Construction
11/15/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/09/2024
Filed — Alteration CO
Convert Two (2) family to One (1) family with new stucco siding as per plan and propose blackhead.
B01104943-P1
09/27/2024
Permit issued — Mechanical Systems
B01104943-S2-MS
09/27/2024
Permit issued — Plumbing
B01104943-S1-PL
09/26/2024
Permit issued — General Construction
B01104943-I1-GC
09/24/2024
Objection resolved — Addressed
09/23/2024
Objection raised — Other
09/23/2024
Objection resolved — Addressed
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJCVC GENERAL CONSTRUCTION09/27/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C09/27/2024
DOB NOWGeneral ConstructionPermit IssuedJCVC GENERAL CONSTRUCTION09/26/2024
1 project · most recent 03/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2026Signed-offJCVC GENERAL CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Daikin 3MXM24AVJU9 48,500 BTU · Heat Pump Outdoor ×1
5MXS48WVJU9 48,500 BTU · Heat Pump Outdoor ×1
5MXS48TVJU 48,500 BTU · Heat Pump Outdoor ×2
Goodman PA4SAN448-A 48,000 BTU · Condensing Unit ×1
GSX130481B 48,000 BTU · Condensing Unit ×1
1 project · most recent 03/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/26/2026Signed-offZONE PLUMBING & HEATING CGas, Water/Sanitary
1 project · most recent 08/28/2025
General Wiring
FiledStatusContractorScope
08/28/2025CompleteBLZ ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
04/03/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
04/03/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
04/03/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
04/03/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
04/03/2026Lighting in dwelling unitsShahrish Shuvoenergy_progress
04/03/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
04/03/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
04/03/2026Fenestration areasShahrish Shuvoenergy_progress
04/03/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
04/03/2026Fenestration air leakageShahrish Shuvoenergy_progress
03/26/2026Fenestration air leakageShahrish Shuvoenergy_progress
03/26/2026Fenestration areasShahrish Shuvoenergy_progress
03/26/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
03/26/2026Lighting in dwelling unitsShahrish Shuvoenergy_progress
03/26/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
03/26/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
03/26/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/26/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
03/26/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
03/26/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
03/12/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/12/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
03/12/2025Maintenance informationShahrish Shuvoenergy_progress
03/12/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
03/12/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
Latest 25 of 76.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026B01104943-I1Request digital key ↗
08/24/2026B01104943-P5Request digital key ↗
08/23/2026B01104943-P8Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/23/2026B01104943-P8Open ↗
08/13/2026B01104943-I1Open ↗
08/13/2026B01104943-P6Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature18
09/25/2026B01104943-P8Open ↗
09/25/2026B01104943-P8Open ↗
09/01/2026B01104943-P6Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/25/2026B01104943-P8Open ↗
09/01/2026B01104943-P6Open ↗
09/01/2026B01104943-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026B01104943-P8Open ↗
08/13/2026B01104943-S2Open ↗
08/13/2026B01104943-P5Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/23/2026B01104943-P8Open ↗
08/13/2026B01104943-P6Open ↗
08/13/2026B01104943-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/23/2026B01104943-P8Open ↗
08/13/2026B01104943-S2Open ↗
08/13/2026B01104943-P1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/23/2026B01104943-P8Open ↗
08/13/2026B01104943-P2Open ↗
08/13/2026B01104943-P6Open ↗
Showing 3 of 4 on file for this type