← Back
Single or multiple dwelling with stores or offices
4320 14 AVENUE
BROOKLYN · BIN 3136210
💬 Discuss this project
1930Year Built
4Stories
S9Building Class
R6Zoning
9,081 sfGross Floor Area
8Units
2 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: GREEN B FISHER LLC · 2,017 sf lot · 4.5 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Roof1p · 1 filing · 8 docs
Floor 41p · 1 filing · 8 docs
Floor 3
Floor 22p · 1 filing · 8 docs
Floor 1
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YEHOSHUA B261307/08/2026
YELLOW HAT CONSTGRUCTION INC1007/08/2026
GREEN B FISHER LLC103/22/2026
T B S GLOBAL CORP203/22/2026
MANHATTAN D ENTERPRISES103/22/2026
J S B WORKS INC203/22/2026
ISB WORKS INC103/22/2026
OWNER OF PREMISES 1383 44103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/20/2019$1.5M—1383 44 LLC → GREEN B FISHER LLC$165/sf building
01/30/2019$1.5M—— → —$165/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.501/02/2025
ASHRAF CORP204/28/2022
ANTHONY CUCICH ARCHITECT102/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
2020 GROUP SERVICE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN D ENTERPRISESGeneral Contractor407/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection207/08/2026
WATERMARK PLUMBING CORPPlumbing207/08/2026
JSB WORKS INCGeneral Contractor107/08/2026
TRUE POWER ELECL CONT LLCElectrical103/22/2026
SUPERB CONSTRUCTION MGTGeneral Contractor107/08/2026
YELLOW HAT CONSTRUCTION IGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCT. ENGINEERING INTEG4174202/28/2023
Building Lifecycle
All (74)Filed (8)Permit Issued (9)Signed Off (5)Violation (46)Inspection (4)Special Inspection (2)
05/01/2026
Violation issued (HPD, open)
A
01/16/2025
Signed off — Alteration
BOILER APPLICATION IN CONJUNCTION WITH ALT1 #321975369
B01119683-S1
01/15/2025
Signed off — Alteration
BOILER APPLICATION IN CONJUNCTION WITH ALT1 #321975369
B01119683-I1
01/10/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/08/2025
Permit issued — Boiler Equipment
B01119683-S1-BE
01/02/2025
Filed — Alteration
BOILER APPLICATION IN CONJUNCTION WITH ALT1 #321975369
B01119683-S1
12/30/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/11/2024
Filed — Alteration
BOILER APPLICATION IN CONJUNCTION WITH ALT1 #321975369
B01119683-P1
11/01/2024
Permit issued — Boiler Equipment
B01119683-I1-BE
10/08/2024
Filed — Alteration
BOILER APPLICATION IN CONJUNCTION WITH ALT1 #321975369
B01119683-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2024
Signed off — Alteration
INSTALLING NEW SPRINKLER SYSTEM, IN CONJUNCTION WITH AL1 #321975369
B00223352-I1
12/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/12/2023
Permit issued — Sprinklers
B00223352-I1-EW-SP
09/07/2023
Special inspection requirement — Sprinkler Systems
Chris Yiu
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/27/2023
Signed off — Alteration
B00464432-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2023
Filed — Alteration
INSTALLING NEW SPRINKLER SYSTEM, IN CONJUNCTION WITH AL1 #321975369
B00223352-P1
02/28/2023
Special inspection requirement — Sprinkler Systems
Chris Yiu
12/21/2022
Permit issued — Sprinklers
B00223352-I1-EW-SP
11/15/2022
Violation issued (ECB, closed)
Construction
10/07/2022
Violation issued (ECB, closed)
Construction
09/28/2022
Violation issued (ECB, closed)
Unknown
09/16/2022
Signed off — Alteration
Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00633017-I1
08/04/2022
Violation issued (ECB, closed)
Unknown
08/04/2022
Violation issued (ECB, closed)
Construction
06/21/2022
Permit issued — Construction Fence
B00464432-I1-FN
05/25/2022
Violation issued (ECB, closed)
Construction
05/25/2022
Violation issued (ECB, closed)
Construction
04/28/2022
Filed — Alteration
Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00633017-P1
04/18/2022
Violation issued (ECB, closed)
Construction
11/24/2021
Permit issued — Supported Scaffold
B00633017-I1-SH
11/24/2021
Permit issued — Supported Scaffold
B00633017-I1-SF
11/23/2021
Filed — Alteration
Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00633017-I1
10/21/2021
Permit issued — Construction Fence
B00464432-I1-FN
08/11/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/11/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/25/2021
Permit issued — Construction Fence
B00464432-I1-FN
02/02/2021
Filed — Alteration
B00464432-I1
08/31/2020
Filed — Alteration
INSTALLING NEW SPRINKLER SYSTEM, IN CONJUNCTION WITH AL1 #321975369
B00223352-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offWATERMARK PLUMBING CORP01/08/2025
DOB NOWBoiler EquipmentSigned-offWATERMARK PLUMBING CORP11/01/2024
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP12/12/2023
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP12/21/2022
DOB NOWConstruction FenceSigned-offJSB WORKS INC06/21/2022
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES11/24/2021
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES11/24/2021
DOB NOWConstruction FenceSigned-offYELLOW HAT CONSTRUCTION I10/21/2021
DOB NOWConstruction FenceSigned-offSUPERB CONSTRUCTION MGT02/25/2021
BISPLISSUEDWATERMARK PLUMBING CORP12/07/2023
BIS—ISSUEDYELLOW HAT CONSTRUCTION I10/18/2023
BIS—ISSUEDYELLOW HAT CONSTRUCTION I12/01/2022
BISPLISSUEDWATERMARK PLUMBING CORP11/15/2022
BIS—ISSUEDT.B.S. GLOBAL.CORP10/04/2022
BIS—ISSUEDJSB WORKS INC07/01/2022
BIS—ISSUEDYELLOW HAT CONSTRUCTION I08/26/2021
BIS—ISSUEDT.B.S. GLOBAL.CORP02/10/2021
2 projects · most recent 05/03/2023
General Wiring
FiledStatusContractorScope
05/03/2023CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
11/15/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/10/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/30/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/07/2023Sprinkler SystemsChris Yiuspecial
02/28/2023Sprinkler SystemsChris Yiuspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
08/31/2026B00633017-I1Request digital key ↗
08/31/2026B00633017-P1Request digital key ↗
08/23/2026B01119683-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00223352-I1Request digital key ↗
08/15/2026B00223352-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00464432-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00464432-I1Open ↗
08/31/2026B00633017-P1Open ↗
08/31/2026B00633017-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00223352-P1Open ↗
08/25/2026B00223352-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00223352-I1Open ↗
08/13/2026B00223352-P1Open ↗