4320 VAN CORTLANDT PARK EAST
BRONX · BIN 2018858
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R4AZoning
2,680 sfGross Floor Area
1Units
18 Active Violations 1 old, status unconfirmed ▸
Two stories - detached, small or mid-size · 2,750 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSidewalk shed installation and repairUnder Construction7p · 1 filing · 6 docs
Floor 13p · 1 filing · 10 docs
Site & exteriorProposed heavy duty sidewalk shedUnder Construction11p · 3 filings · 13 docs
Filed — no permit issuedSuspended scaffold outrigger for facade repair2p · 2 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4320 Van Cortlandt Park Owners707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services109/15/2026
Walker107/21/2026
McLaren Engineering Group206/04/2026
Lawless & Mangione110/13/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rael MaintenancePlumbing203/22/2026
Niche Waterproofingspecialty_contractor110/04/2026
Primal General ConstructionGeneral Contractor107/08/2026
Tribeca Construction GroupGeneral Contractor104/09/2026
Andamio ScaffoldingScaffold109/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS Engineering3745108/24/2026
Crosscheck Inspection Services544107/21/2026
M.G. McLaren Engineering2999206/04/2026
Special Testing & Consulting1688110/13/2022
Building Lifecycle
10/26/2026
Objection raised — Other
10/12/2026
Filed — Alteration
Suspended Scaffold outrigger installation for Facade repair works and inspections
X01472624-I1
10/06/2026
Filed — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01466235-I1
10/06/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/15/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01457958-I1
186 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedJC Santana Contracting Co09/15/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/15/2026
DOB NOWGeneral ConstructionPermit IssuedNiche Waterproofing08/31/2026
DOB NOWStructuralSigned-offTribeca Construction Group01/21/2026
DOB NOWStructuralSigned-offPrimal General Construction11/21/2022
BISFBISSUEDC C Controlled Combustion12/18/2012
1 project · most recent 09/15/2026
FiledStatusContractorScope
09/15/2026Permit IssuedBorowide Elect'l Contractors—
1 project · most recent 06/04/2026
Concrete
FiledStatusContractorScope
06/04/2026Signed-offTribeca Construction GroupConcrete
1 project · most recent 09/15/2026
Sidewalk Shed
FiledStatusContractorScope
09/15/2026Permit IssuedAndamio ScaffoldingSidewalk Shed
1 project · most recent 07/21/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/21/2026Permit IssuedNiche WaterproofingTenant Protection Plan 72 Hour
3 projects · most recent 10/12/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
10/12/2026——Suspended Scaffold (SC)
10/06/2026——Suspended Scaffold (SC)
08/24/2026Permit IssuedJC Santana Contracting CoSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/21/2026Post-installed AnchorsMichael Walshspecial
08/21/2026Post-installed anchors in masonryMichael Walshspecial
07/01/2026Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
07/01/2026Fenestration air leakageEUGENE BIFULCOenergy_progress
06/30/2026Fenestration areasEUGENE BIFULCOenergy_progress
06/26/2026Structural Stability – Alterations of existing buildingsJeremy Billigspecial
06/26/2026FinalJeremy Billigprogress
06/26/2026Tenant Protection Plan ComplianceJeremy Billigspecial
06/04/2026FinalJeremy Billigprogress
06/04/2026Structural Stability – Alterations of existing buildingsJeremy Billigspecial
06/04/2026Tenant Protection Plan ComplianceJeremy Billigspecial
04/08/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/08/2026MasonryEUGENE BIFULCOspecial
04/08/2026Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
04/08/2026FinalEUGENE BIFULCOprogress
10/13/2022Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
10/13/2022Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
09/20/2022FinalSyed Shoaibprogress