← Back
Two stories - detached, small or mid-size
4324 BOYD AVENUE
BRONX · Wakefield-Woodlawn · BIN 2069981
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4-1Zoning
1,256 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,281 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/18/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
06/11/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/11/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2024
Signed off — Alteration
X01009557-I1
03/27/2024
Permit issued — Solar
X01009557-I1-SL
03/18/2024
Filed — Alteration
X01009557-I1
02/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
02/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
02/22/2024
Special inspection requirement — Final
Walid Abdulla
02/22/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/27/2024
1 project · most recent 03/18/2024
FiledStatusContractorScope
03/18/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/22/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/22/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/22/2024Energy Code Compliance InspectionsWalid Abdullaprogress
02/22/2024FinalWalid Abdullaprogress
02/22/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026X01009557-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026X01009557-I1Open ↗
08/24/2026X01009557-I1Open ↗
08/24/2026X01009557-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026X01009557-I1Open ↗
08/24/2026X01009557-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026X01009557-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026X01009557-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01009557-I1Open ↗