← Back
Miscellaneous two family
433 51 STREET
BROOKLYN · Sunset Park (West) · BIN 3013292
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R6BZoning
2,540 sfGross Floor Area
2Units
Miscellaneous two family · 1,803 sf lot · 1.41 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 22p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
Cellar1p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/25/2015$990K—433 51 STREET INC → Private party$390/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI507/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394307/03/2023
Building Lifecycle
All (17)Filed (5)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (3)
07/24/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00817742-I1
07/24/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00817744-I1
07/17/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/12/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/03/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00817742-P2
07/03/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00817744-P1
07/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/03/2023
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/31/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00817742-P1
05/17/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2023
Permit issued — General Construction
B00817742-I1-GC
01/27/2023
Permit issued — Plumbing
B00817744-I1-PL
01/24/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00817742-I1
01/24/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00817744-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC01/27/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC01/27/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/17/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/12/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/17/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/03/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/03/2023Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/03/2023Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00817742-P2Request digital key ↗
08/27/2026B00817742-I1Request digital key ↗
08/27/2026B00817742-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00817742-P2Open ↗
08/27/2026B00817742-P1Open ↗
08/27/2026B00817742-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B00817742-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00817742-P2Open ↗