← Back
BuildNYC
One family attached or semi-detached
433 VERMONT STREET
BROOKLYN · BIN 3330434
💬 Discuss this project
1990Year Built
2Stories
A5Building Class
R6Zoning
1,134 sfGross Floor Area
1Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
One family attached or semi-detached · Owner of record: 433 Vermont St · 3,325 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof13p · 4 filings · 20 docs
Bulkhead3p · 1 filing · 11 docs
Floor 485p · 4 filings · 20 docs
Floor 387p · 4 filings · 20 docs
Floor 2Unit 2A, Unit 2B, Unit 2C89p · 4 filings · 20 docs
Floor 1Unit 1A, Unit 1B99p · 4 filings · 20 docs
CellarExcavation and support of excavation100p · 5 filings · 20 docs
Site & exteriorScaffolding work filing17p · 3 filings · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/04/2021$535K—Private party → 433 VERMONT ST LLC$472/sf building
02/25/2014$315K—Private party → Private party$278/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nikolai Katz Architect612/19/2022
Chosen MEP509/02/2022
Paul Perdek, Professional Engineering303/30/2022
KNF Services Crop103/21/2022
Kce Consulting Engineering401/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing3203/21/2026
AE Design Solution603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Red Brick Property ManagementGeneral Contractor1507/08/2026
Red Brick Property ManagementScaffold707/08/2026
Mpi PlumbingPlumbing507/08/2026
Central Scaffold & HoistScaffold107/08/2026
Foster Electrical ServiceElectrical103/22/2026
Prime Piping & HeatingFire Protection107/08/2026
Nikolai KatzElectrical103/21/2026
Key Plumbing & Heating SolGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161412/19/2022
Building Lifecycle
10/02/2024
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT DOOR LEADING TO STAIRCASE AT PUBLIC HALL, 1st STORY
HPD violation · closed
09/19/2024
§ 27-2005 HMC: REFIT DOOR LEADING TO STAIRCASE AT PUBLIC HALL, 1st STORY
HPD violation · closed
09/19/2024
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
09/02/2024
§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT…
HPD violation · closed
09/02/2024
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT…
HPD violation · closed
107 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRed Brick Property Management07/06/2022
DOB NOWGeneral ConstructionPermit IssuedRed Brick Property Management06/08/2022
DOB NOWMechanical SystemsPermit IssuedRed Brick Property Management06/01/2022
DOB NOWConstruction FenceSigned-offRed Brick Property Management05/28/2022
DOB NOWSupported ScaffoldSigned-offRed Brick Property Management03/22/2022
DOB NOWSprinklersSigned-offAmb Mechanical02/17/2022
DOB NOWPlumbingSigned-offYG Services01/28/2022
DOB NOWSupport of ExcavationSigned-offRed Brick Property Management01/14/2022
DOB NOWSidewalk ShedSigned-offCentral Scaffold & Hoist12/22/2021
DOB NOWEarth WorkSigned-offRed Brick Property Management11/17/2021
DOB NOWGeneral ConstructionPermit IssuedRed Brick Property Management11/17/2021
DOB NOWConstruction FenceSigned-offRed Brick Property Management10/06/2021
3 projects · most recent 02/14/2022
General Wiring
FiledStatusContractorScope
02/14/2022CompleteFoster Electrical Service—
02/14/2022CompleteFoster Electrical ServiceGeneral Wiring
12/23/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/14/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/31/2022Fail-Final CND-Occupancy InspectionFailView ↗
08/19/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/17/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/27/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
12/27/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/27/2022MasonryFAHAD FATEHspecial
12/27/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/27/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/27/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
12/27/2022Maintenance informationFAHAD FATEHenergy_progress
12/27/2022Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/27/2022MeteringFAHAD FATEHenergy_progress
12/27/2022Fenestration air leakageFAHAD FATEHenergy_progress
12/27/2022Lighting controlsFAHAD FATEHenergy_progress
12/27/2022Lighting in dwelling unitsFAHAD FATEHenergy_progress
12/27/2022Fenestration areasFAHAD FATEHenergy_progress
12/27/2022Insulation placement and R valuesFAHAD FATEHenergy_progress
12/27/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/27/2022Interior lighting powerFAHAD FATEHenergy_progress
09/07/2022Seismic Isolation SystemsFAHAD FATEHspecial
09/07/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/07/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
09/07/2022Sprinkler SystemsFAHAD FATEHspecial
09/02/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/02/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/02/2022Sprinkler SystemsFAHAD FATEHspecial
09/02/2022Seismic Isolation SystemsFAHAD FATEHspecial
09/02/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
Latest 25 of 83.
110 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account