← Back
Over six families without stores
433 WYTHE AVENUE
BROOKLYN · Williamsburg · BIN 3059565
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
4,400 sfGross Floor Area
8Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Over six families without stores · Owner of record: 431-433 WYTHE PROPERTY OWNER LLC · 1,305 sf lot · 3.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof32p · 1 filing · 20 docs
Floor 412p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOLLISWOOD 2AVE3107/08/2026
MNK ENTERPRISES NY INC503/22/2026
431-433 WYTHE PROPERTY OWNER LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JON POWELL ARCHITECTURE PLLC506/09/2025
JAG ENGINEERING, LLC304/07/2025
ARQUITECTURA VARELA101/02/2025
ME ENGINEERS202/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXUS CONSULTING NYC, INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ENVISION DESIGN & CONST LGeneral Contractor1207/08/2026
MNK ENTERPRISES NY INCGeneral Contractor303/21/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS ENGINEERING & CONSULTI3652906/09/2025
Building Lifecycle
All (110)Filed (10)Permit Issued (8)Signed Off (5)Violation (11)Inspection (4)Objection (42)Special Inspection (30)
08/13/2025
Signed off — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977792-I1
08/08/2025
Signed off — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977792-S2
08/08/2025
Signed off — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977792-S1
07/28/2025
Signed off — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977792-S3
07/07/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01160996-I1
06/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/17/2025
Special inspection requirement — Lighting in dwelling units
NARI MOTWANI
06/17/2025
Special inspection requirement — Interior lighting power
NARI MOTWANI
06/17/2025
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
06/17/2025
Special inspection requirement — Final
Jonathan Powell
06/17/2025
Special inspection requirement — Lighting controls
NARI MOTWANI
06/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARI MOTWANI
06/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARI MOTWANI
06/09/2025
Filed — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977792-P7
06/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARI MOTWANI
06/09/2025
Special inspection requirement — Interior lighting power
NARI MOTWANI
06/09/2025
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
06/09/2025
Special inspection requirement — Final
Jonathan Powell
06/09/2025
Special inspection requirement — Lighting controls
NARI MOTWANI
06/09/2025
Special inspection requirement — Lighting in dwelling units
NARI MOTWANI
06/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/28/2025
Permit issued — General Construction
B00977792-I1-GC
04/25/2025
Objection resolved — Addressed
04/18/2025
Objection resolved — Addressed
04/18/2025
Objection resolved — Addressed
04/07/2025
Filed — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977792-P6
04/07/2025
Special inspection requirement — Final
Josh Gregg
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
NARI MOTWANI
04/07/2025
Special inspection requirement — Mechanical Systems
NARI MOTWANI
04/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARI MOTWANI
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
04/07/2025
Special inspection requirement — Final
Brian Shassian
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
NARI MOTWANI
04/07/2025
Special inspection requirement — Shutoff dampers
NARI MOTWANI
04/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NARI MOTWANI
04/07/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
NARI MOTWANI
04/07/2025
Special inspection requirement — Masonry
NARI MOTWANI
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARI MOTWANI
04/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARI MOTWANI
04/07/2025
Special inspection requirement — Wood – Seismic Resistance
NARI MOTWANI
03/14/2025
Objection raised — Fire_Protection
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/06/2025
Objection raised — Zoning
03/06/2025
Objection raised — Other
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Zoning
03/06/2025
Objection raised — Other
03/06/2025
Objection raised — Other
03/06/2025
Objection raised — Other
02/28/2025
Filed — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977792-P4
02/19/2025
Objection raised — Scope
02/13/2025
Filed — Alteration
PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00977792-P3
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offENVISION DESIGN & CONST L04/28/2025
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC01/03/2025
DOB NOWGeneral ConstructionSigned-offENVISION DESIGN & CONST L12/18/2024
DOB NOWMechanical SystemsSigned-offENVISION DESIGN & CONST L12/18/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS12/03/2024
DOB NOWMechanical SystemsSigned-offENVISION DESIGN & CONST L05/17/2024
DOB NOWStructuralSigned-offENVISION DESIGN & CONST L05/09/2024
DOB NOWGeneral ConstructionSigned-offENVISION DESIGN & CONST L05/09/2024
2 projects · most recent 08/26/2025
General Wiring
FiledStatusContractorScope
08/26/2025CompleteINFINITI ELECTRIC CORPGeneral Wiring
01/03/2025CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
06/17/2025Lighting in dwelling unitsNARI MOTWANIenergy_progress
06/17/2025Interior lighting powerNARI MOTWANIenergy_progress
06/17/2025Energy Code Compliance InspectionsNARI MOTWANIprogress
06/17/2025FinalJonathan Powellprogress
06/17/2025Lighting controlsNARI MOTWANIenergy_progress
06/17/2025Structural Stability – Alterations of existing buildingsNARI MOTWANIspecial
06/17/2025Tenant Protection Plan ComplianceNARI MOTWANIspecial
06/09/2025Tenant Protection Plan Compliance—special
06/09/2025Structural Stability – Alterations of existing buildingsNARI MOTWANIspecial
06/09/2025Interior lighting powerNARI MOTWANIenergy_progress
06/09/2025Energy Code Compliance InspectionsNARI MOTWANIprogress
06/09/2025FinalJonathan Powellprogress
06/09/2025Lighting controlsNARI MOTWANIenergy_progress
06/09/2025Lighting in dwelling unitsNARI MOTWANIenergy_progress
04/07/2025FinalJosh Greggprogress
04/07/2025HVAC-R and service water heating system controlsNARI MOTWANIenergy_progress
04/07/2025Mechanical SystemsNARI MOTWANIspecial
04/07/2025Tenant Protection Plan ComplianceNARI MOTWANIspecial
04/07/2025Energy Code Compliance InspectionsNARI MOTWANIprogress
04/07/2025FinalBrian Shassianprogress
04/07/2025Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
04/07/2025HVAC-R and service water heating equipmentNARI MOTWANIenergy_progress
04/07/2025Shutoff dampersNARI MOTWANIenergy_progress
04/07/2025HVAC-R and service water piping design and insulationNARI MOTWANIenergy_progress
04/07/2025Construction Operations Influencing Adjacent StructuresNARI MOTWANIspecial
Latest 25 of 45.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/23/2026B01160996-I1Request digital key ↗
08/22/2026B00977792-S2Request digital key ↗
08/22/2026B00977792-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026B00977792-P5Open ↗
09/02/2026B00977792-P5Open ↗
09/02/2026B00977792-P5Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026B00977792-P5Open ↗
09/02/2026B00977792-P5Open ↗
09/02/2026B00977792-P5Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026B00977792-S2Open ↗
08/22/2026B00977792-S1Open ↗
08/22/2026B00977792-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/22/2026B00977792-S1Open ↗
08/22/2026B00977792-P7Open ↗
08/22/2026B00977792-P1Open ↗
Showing 3 of 10 on file for this type