← Back
Single or multiple dwelling with stores or offices
4330 NEW UTRECHT AVENUE
BROOKLYN · Sunset Park (East)-Borough Park (West) · BIN 3136084
💬 Discuss this project
1930Year Built
2Stories
S9Building Class
R6Zoning
4,600 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: FORTY FOUR 88 REALTY LLC · 2,555 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 217p · 3 filings · 20 docs
Floor 118p · 3 filings · 20 docs
Cellar19p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Y W NY CONSTRUCTION203/22/2026
OWNER OF 4330 NEW UTRECHT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2025$1.7M—Private party → FORTY FOUR 88 REALTY LLC$370/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIMON JIANG606/08/2026
CITY BUILDING NY ARCHITECT P.C.1003/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY BUILDING NY ARCHITECT P C1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing507/08/2026
Y & W NY CONSTRUCTION INCGeneral Contractor404/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY BUILDING NY ARCHITEC1394501/20/2026
SIMON7555104/23/2025
Building Lifecycle
All (136)Filed (16)Permit Issued (7)Signed Off (2)Violation (8)Inspection (9)Objection (80)Special Inspection (14)
07/15/2026
Signed off — Alteration
To file PL plumbing work in conjunction with DOB Now Build application job#B01198078. No change in use, egress or occupancy under this application.
B01200547-I1
07/15/2026
Signed off — Alteration
Replace exsiting damaged structural framing of an existing building at cellar, 1st and 2nd floor. To file interior demolition work. Remove interior non-load bearing partitions. No change in use, egress or occupancy under this application.
B01214614-I1
06/08/2026
Filed — Alteration
Replace exsiting damaged structural framing of an existing building at cellar, 1st and 2nd floor. To file interior demolition work. Remove interior non-load bearing partitions. No change in use, egress or occupancy under this application.
B01214614-P5
04/28/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/09/2026
Permit issued — Boiler Equipment
B01344114-S2-BE
04/09/2026
Permit issued — Boiler Equipment
B01344114-S3-BE
04/08/2026
Permit issued — Boiler Equipment
B01344114-I1-BE
04/08/2026
Permit issued — Boiler Equipment
B01344114-S1-BE
04/06/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/13/2026
Filed — Alteration
To file PL plumbing work in conjunction with DOB Now Build application job#B01198078. No change in use, egress or occupancy under this application.
B01200547-P4
02/03/2026
Objection raised — Energy
02/03/2026
Objection raised — Mechanical
02/03/2026
Objection raised — Mechanical
02/03/2026
Objection raised — Energy
02/03/2026
Objection raised — Energy
02/03/2026
Objection raised — Cost
02/03/2026
Objection raised — Mechanical
02/03/2026
Objection raised — Mechanical
02/03/2026
Objection raised — Mechanical
02/03/2026
Objection raised — Fire_Protection
02/03/2026
Objection raised — Mechanical
02/03/2026
Objection raised — Admin
02/03/2026
Objection raised — Structural
02/03/2026
Objection raised — Admin
02/03/2026
Objection raised — Admin
02/03/2026
Objection raised — Mechanical
02/03/2026
Objection raised — Mechanical
02/03/2026
Objection raised — Admin
02/03/2026
Objection raised — Admin
02/03/2026
Objection raised — Mechanical
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC04/09/2026
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC04/09/2026
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC04/08/2026
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC04/08/2026
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC05/07/2025
DOB NOWGeneral ConstructionPermit IssuedY & W NY CONSTRUCTION INC05/02/2025
DOB NOWGeneral ConstructionSigned-offY & W NY CONSTRUCTION INC04/25/2025
1 project · most recent 03/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/13/2026Signed-offCATMAN PLUMBING INCGas, Water/Sanitary
1 project · most recent 09/24/2025
General Wiring
FiledStatusContractorScope
09/24/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/28/2026Pass-Final Boiler Equipment InspectionPassView ↗
10/20/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/21/2026Structural Stability – Alterations of existing buildings—special
01/20/2026HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
01/20/2026HVAC-R and service water heating system controlsYING HAO LIenergy_progress
01/20/2026HVAC-R and service water heating equipmentYING HAO LIenergy_progress
01/20/2026Heating SystemsYING HAO LIspecial
01/15/2026Heating SystemsYING HAO LIspecial
01/15/2026HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
01/15/2026HVAC-R and service water heating system controlsYING HAO LIenergy_progress
01/15/2026HVAC-R and service water heating equipmentYING HAO LIenergy_progress
10/08/2025Structural Stability – Alterations of existing buildings—special
07/29/2025Structural Stability – Alterations of existing buildings—special
07/15/2025Structural Stability – Alterations of existing buildings—special
03/25/2025Fire-Resistance Rated ConstructionYING HAO LIprogress
03/25/2025Fire-Resistant Penetrations and JointsYING HAO LIspecial
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/22/2026B01198078-I1Request digital key ↗
08/22/2026B01198078-P1Request digital key ↗
08/18/2026B01344114-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/18/2026B01344114-I1Open ↗
08/18/2026B01344114-S3Open ↗
08/18/2026B01344114-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01344114-S2Open ↗
09/01/2026B01344114-S1Open ↗
08/27/2026B01198078-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01344114-S2Open ↗
09/01/2026B01344114-S1Open ↗
08/27/2026B01198078-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/18/2026B01344114-S3Open ↗
08/18/2026B01344114-S2Open ↗
08/18/2026B01344114-S1Open ↗
Showing 3 of 16 on file for this type