← Back
Two stories - detached, small or mid-size
4332 FURMAN AVENUE
BRONX · Wakefield-Woodlawn · BIN 2069820
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R5Zoning
1,332 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,375 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Roof3p · 2 filings · 12 docs
Floor 11p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/02/2025
TRINITY SOLAR LLC101/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES103/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
TRINITY SOLAR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/02/2025
BITOPI CONSULTANTS LLC7036101/09/2025
Building Lifecycle
All (11)Filed (2)Permit Issued (2)Signed Off (1)Violation (1)Special Inspection (5)
02/04/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01234185-I1
06/09/2025
Permit issued — Solar
X01234185-I1-SL
06/02/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01234185-I1
05/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/30/2025
Special inspection requirement — Final
Walid Abdulla
05/30/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/17/2025
Permit issued — Solar
X01157630-I1-SL
01/09/2025
Filed — Alteration
X01157630-I1
12/08/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/09/2025
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC01/17/2025
2 projects · most recent 06/02/2025
FiledStatusContractorScope
06/02/2025CompleteSUNRUN SOLAR ELECTL CORP—
12/13/2024CancelledREDLINE ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/30/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/30/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/30/2025Energy Code Compliance InspectionsWalid Abdullaprogress
05/30/2025FinalWalid Abdullaprogress
05/30/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X01157630-I1Request digital key ↗
08/19/2026X01234185-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026X01234185-I1Open ↗
08/26/2026X01234185-I1Open ↗
08/26/2026X01234185-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026X01157630-I1Open ↗
08/19/2026X01234185-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X01234185-I1Open ↗
08/26/2026X01234185-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026X01157630-I1Open ↗
08/19/2026X01234185-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01234185-I1Open ↗