← Back
BuildNYC
Condo, residential unit in 1-3 story building
Horizon Village Condominium
434-1 CASWELL AVENUE · BIN 5130230
💬 Discuss this project
0Year Built
2Stories
R3Building Class
—Zoning
87,272 sfGross Floor Area
64Units
0 Active ViolationsFDNY Report ↗
Condo, residential unit in 1-3 story building · Owner of record: Horizon Village Condominium # 1 · 125,091 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarReplacement of interior bearing wall2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ronald D.victorio R.A103/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jon AdamoGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Reliance Engineering322103/23/2023
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (6)
08/16/2023
Signed off — Alteration
Removal of interior fire rated bearing wall at cellar level which was damaged in Hurricane Ida Storm. Wall reconstruction required & interior fire rated finishes on wall to underside of 1st floor plywood.
S00848147-I1
04/27/2023
Permit issued — General Construction
S00848147-I1-GC-CX
03/23/2023
Filed — Alteration
Removal of interior fire rated bearing wall at cellar level which was damaged in Hurricane Ida Storm. Wall reconstruction required & interior fire rated finishes on wall to underside of 1st floor plywood.
S00848147-I1
03/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
03/22/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Ralph Giorgio
03/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Giorgio
03/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ralph Giorgio
03/22/2023
Special inspection requirement — Structural Wood Frame
Ralph Giorgio
03/22/2023
Special inspection requirement — Final
Ronald Victorio
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJon Adamo04/27/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/22/2023Fire-Resistant Penetrations and JointsRalph Giorgiospecial
03/22/2023Construction Operations Influencing Adjacent StructuresRalph Giorgiospecial
03/22/2023Structural Stability – Alterations of existing buildingsRalph Giorgiospecial
03/22/2023Fire-Resistance Rated ConstructionRalph Giorgioprogress
03/22/2023Structural Wood FrameRalph Giorgioprogress
03/22/2023FinalRonald Victorioprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026S00848147-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S00848147-I1Open ↗
08/26/2026S00848147-I1Open ↗
08/26/2026S00848147-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026S00848147-I1Open ↗
08/26/2026S00848147-I1Open ↗
08/26/2026S00848147-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026S00848147-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026S00848147-I1Open ↗