← Back
Miscellaneous two family
434 15 STREET
BROOKLYN · Windsor Terrace-South Slope · BIN 3026690
💬 Discuss this project
1891Year Built
2Stories
B9Building Class
R6BZoning
2,160 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous two family · 1,800 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/05/2022$2.1M—Private party → Private party$991/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC104/14/2025
OPERA STUDIO ARCHITECTURE, LLC605/13/2024
VAKOTA ARCHITECTURE104/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING203/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANRE LLCGeneral Contractor603/21/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
KATAN P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244104/14/2025
INTEGRITY CONSULTING SERV666201/23/2024
OPERA STUDIO ARCHITECTURE5970401/23/2024
Building Lifecycle
All (51)Filed (8)Permit Issued (5)Signed Off (4)Violation (1)Inspection (3)Special Inspection (30)
06/23/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01197429-I1
04/17/2025
Permit issued — Solar
B01197429-I1-SL
04/14/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01197429-I1
03/19/2025
Special inspection requirement — Final
NARESH MAHANGU
03/19/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
03/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
03/19/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
05/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
05/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
05/13/2024
Filed — Alteration
Moderate selective interior renovation of non-load-bearing partitions,GWB, tilework, kitchen cabinet replacement on cel, 001-003 floors. Exterior work for Steel deck and stairs in rear yd, footings and windows. No change to egress, occupancy or use
B00878461-P3
04/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
04/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
03/19/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/28/2024
Signed off — Alteration
Moderate selective interior renovation of non-load-bearing partitions,GWB, tilework, kitchen cabinet replacement on cel, 001-003 floors. Exterior work for Steel deck and stairs in rear yd, footings and windows. No change to egress, occupancy or use
B00878461-I1
02/28/2024
Signed off — Alteration
Moderate selective interior renovation of non-load-bearing partitions,GWB, tilework, kitchen cabinet replacement on cel, 001-003 floors. Exterior work for Steel deck and stairs in rear yd, footings and windows. No change to egress, occupancy or use
B00878461-S1
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
01/25/2024
Special inspection requirement — Mechanical Systems
Thomas Barry
01/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
01/25/2024
Special inspection requirement — Final
Thomas Barry
01/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
01/25/2024
Special inspection requirement — Shutoff dampers
Thomas Barry
01/25/2024
Special inspection requirement — Ventilation and air distribution system
Thomas Barry
01/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
01/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
01/25/2024
Special inspection requirement — Maintenance information
Thomas Barry
01/23/2024
Filed — Alteration
Moderate selective interior renovation of non-load-bearing partitions,GWB, tilework, kitchen cabinet replacement on cel, 001-003 floors. Exterior work for Steel deck and stairs in rear yd, footings and windows. No change to egress, occupancy or use
B00878461-P1
01/23/2024
Filed — Alteration
Moderate selective interior renovation of non-load-bearing partitions,GWB, tilework, kitchen cabinet replacement on cel, 001-003 floors. Exterior work for Steel deck and stairs in rear yd, footings and windows. No change to egress, occupancy or use
B00878461-P2
01/22/2024
Special inspection requirement — Mechanical Systems
Thomas Barry
01/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
01/22/2024
Special inspection requirement — Final
Thomas Barry
01/22/2024
Special inspection requirement — Ventilation and air distribution system
Thomas Barry
01/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
01/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
01/22/2024
Special inspection requirement — Maintenance information
Thomas Barry
01/22/2024
Special inspection requirement — Shutoff dampers
Thomas Barry
01/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
01/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
12/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
10/30/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2023
Permit issued — Plumbing
B00878461-S2-PL
06/21/2023
Permit issued — Structural
B00878461-I1-GC-CX
06/21/2023
Permit issued — Mechanical Systems
B00878461-S1-MS
06/09/2023
Filed — Alteration
Moderate selective interior renovation of non-load-bearing partitions,GWB, tilework, kitchen cabinet replacement on cel, 001-003 floors. Exterior work for Steel deck and stairs in rear yd, footings and windows. No change to egress, occupancy or use
B00878461-S1
06/09/2023
Filed — Alteration
Moderate selective interior renovation of non-load-bearing partitions,GWB, tilework, kitchen cabinet replacement on cel, 001-003 floors. Exterior work for Steel deck and stairs in rear yd, footings and windows. No change to egress, occupancy or use
B00878461-S2
06/08/2023
Filed — Alteration
Moderate selective interior renovation of non-load-bearing partitions,GWB, tilework, kitchen cabinet replacement on cel, 001-003 floors. Exterior work for Steel deck and stairs in rear yd, footings and windows. No change to egress, occupancy or use
B00878461-I1
09/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2022
Signed off — Alteration
B00656248-I1
04/21/2022
Permit issued — General Construction
B00656248-I1-GC
04/08/2022
Filed — Alteration
B00656248-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC04/17/2025
DOB NOWPlumbingSigned-offKATAN P & H INC08/15/2023
DOB NOWStructuralSigned-offMANRE LLC06/21/2023
DOB NOWMechanical SystemsSigned-offMANRE LLC06/21/2023
DOB NOWGeneral ConstructionSigned-offMANRE LLC04/21/2022
1 project · most recent 05/13/2024
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
05/13/2024Signed-offMANRE LLCAir Conditioning Systems, Associated Ducts and Piping
Cooling
Mitsubishi Electric MXZ-SM36NAMHZ 36,000 BTU · Heat Pump Outdoor ×2
Ducts & Piping
__Junk__ n/a 1 CFM · Exhaust Fan ×1
1 project · most recent 05/13/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/13/2024Signed-offKATAN P & H INCGas, Water/Sanitary
2 projects · most recent 03/19/2025
General Wiring
FiledStatusContractorScope
03/19/2025CompleteBROOKYLN SOLARWORKS, LLC—
06/15/2023CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 05/13/2024
Steel Concrete
FiledStatusContractorScope
05/13/2024Signed-offKATAN P & H INCSteel, Concrete
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
03/19/2025FinalNARESH MAHANGUprogress
03/19/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
03/19/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/19/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
03/19/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/14/2024Energy Code Compliance InspectionsThomas Barryprogress
05/14/2024HVAC-R and service water piping design and insulationThomas Barryenergy_progress
04/18/2024Energy Code Compliance InspectionsThomas Barryprogress
04/18/2024HVAC-R and service water piping design and insulationThomas Barryenergy_progress
01/25/2024Fire-Resistant Penetrations and JointsThomas Barryspecial
01/25/2024Mechanical SystemsThomas Barryspecial
01/25/2024Energy Code Compliance InspectionsThomas Barryprogress
01/25/2024FinalThomas Barryprogress
01/25/2024HVAC-R and service water piping design and insulationThomas Barryenergy_progress
01/25/2024Shutoff dampersThomas Barryenergy_progress
01/25/2024Ventilation and air distribution systemThomas Barryenergy_progress
01/25/2024HVAC-R and service water heating system controlsThomas Barryenergy_progress
01/25/2024HVAC-R and service water heating equipmentThomas Barryenergy_progress
01/25/2024Maintenance informationThomas Barryenergy_progress
01/22/2024Mechanical SystemsThomas Barryspecial
01/22/2024Fire-Resistant Penetrations and JointsThomas Barryspecial
01/22/2024FinalThomas Barryprogress
01/22/2024Ventilation and air distribution systemThomas Barryenergy_progress
01/22/2024HVAC-R and service water piping design and insulationThomas Barryenergy_progress
01/22/2024HVAC-R and service water heating system controlsThomas Barryenergy_progress
Latest 25 of 47.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/30/2026B00656248-I1Request digital key ↗
08/27/2026B00878461-I1Request digital key ↗
08/27/2026B00878461-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/27/2026B00878461-I1Open ↗
08/27/2026B00878461-P3Open ↗
08/27/2026B00878461-P2Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature15
10/01/2026B00656248-I1Open ↗
09/25/2026B00878461-P2Open ↗
09/25/2026B00878461-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00878461-I1Open ↗
08/27/2026B00878461-P3Open ↗
08/27/2026B00878461-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/25/2026B00878461-P2Open ↗
09/01/2026B00878461-S1Open ↗
08/31/2026B00878461-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00878461-I1Open ↗
08/27/2026B00878461-P3Open ↗
08/27/2026B00878461-P2Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01197429-I1Open ↗