← Back
BuildNYC
Three families
434 BAY RIDGE AVENUE
BROOKLYN · Bay Ridge · BIN 3145737
💬 Discuss this project
1915Year Built
3Stories
C0Building Class
R5BZoning
3,042 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Three families · 1,918 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Unit 3I013p · 1 filing · 16 docs
Floor 212p · 1 filing · 16 docs
Floor 111p · 1 filing · 16 docs
CellarGeneral construction facade masonry modification11p · 2 filings · 20 docs
Site & exterior11p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2024$1.4M—Private party → Private party$460/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX Flame Solution605/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Viben Building1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jabbie IndustriesGeneral Contractor303/21/2026
NY Building AssociatesGeneral Contractor203/21/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JX Flame Solution7286404/15/2025
Building Lifecycle
01/12/2026
Signed off — Alteration
REMEDY ECB VIOLATION#39137662J. TO OBTAIN A PERMIT FOR THE ALTERATION AT EXPO-1 CELLAR ENTRY.MODIFYING EXISTING FACADE MASONRY TO WIDEN THE DOOR OPENING FOR INSTALLATION OF A NEW METAL DOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01223875-I1
07/31/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/03/2025
Permit issued — General Construction
B01223875-I1-GC
06/06/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/03/2025
Objection resolved — Addressed
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY Building Associates07/03/2025
DOB NOWPlumbingSigned-offCatman Plumbing11/18/2024
DOB NOWGeneral ConstructionSigned-offJabbie Industries11/07/2024
1 project · most recent 02/14/2025
General Wiring
FiledStatusContractorScope
02/14/2025Permit IssuedVoltron ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/31/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/31/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/10/2025Energy Code Compliance InspectionsJIE ZHUprogress
05/10/2025Fenestration and door U-factor and product ratingsJIE ZHUenergy_progress
05/10/2025Fenestration areasJIE ZHUenergy_progress
04/17/2025Energy Code Compliance InspectionsJIE ZHUprogress
04/17/2025Fire-Resistant Penetrations and JointsJIE ZHUspecial
04/17/2025HVAC-R and service water heating equipmentJIE ZHUenergy_progress
04/17/2025HVAC-R and service water piping design and insulationJIE ZHUenergy_progress
04/17/2025HVAC-R and service water heating system controlsJIE ZHUenergy_progress
10/04/2024Fenestration areas—energy_progress
10/04/2024Fire-Resistance Rated Construction—progress
10/04/2024Fenestration and door U-factor and product ratings—energy_progress
10/04/2024Interior lighting power—energy_progress
10/04/2024Energy Code Compliance Inspections—progress
10/04/2024Fire-Resistant Penetrations and Joints—special
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account