DOB12/15/2005V-DOB VIOLATION - ACTIVE
ECB02/16/2016ALTERED/CHANGE BUILDING OCCUPIED W/OUT A VALID C OF O AS PER 28-118.3.1-28-118.3.2. NOTE.AT TIME OF INSPECTION ALTERATION TYPE-1 PERMIT #210026167 OBTAIN TO CREATE A CLASS "A" APARTMENT IN BASEMENT AND JOB NUMBNothing owed — awaiting certificate of correction
ECB10/17/2008WORK W/O A PERMIT. UPON INSP, PLUMBING WORK WAS ALREADY IN PROGRESS ATTIME OF INSP. NEW PVC,WATER, SHOWER BODY WAS INSTALLED W/O ANY PERMIT.STOP ALL WORK ON BATHROOM & OBTAIN PERMIT FOR THE PLUMBING. REMEDY: STNothing owed — awaiting certificate of correction
ECB10/02/2007APT CONTRARY OF C OF O (DEPT RECORDS) PREMISES TO BE OCCUPIED- FOUND @LOCATION- CELLAR HAS PARTITIONS FULL BTHRM & KITCHEN AREA DEPT RECORDSSHOW 1 FAMILY OPEN CELLAR W/ BOILER ROOM. REMEDY: OBTAIN A PERMIT &Nothing owed — awaiting certificate of correction
ECB11/22/2005FAILURE TO MAINTAIN- CHIMNEY. CHIMNEY CRACKS AT BASE AND SIDES. METAL SUPPORT STRAPS FOR CHIMNEY ARE RUSTING MORTOR MISSING THROUGHOUT. REMEDY: MAINTAIN BLDG. MAINTAIN CHIMNEYNothing owed — awaiting certificate of correction
ECB01/09/2001FAILURE TO MAINTAIN CHIMNEY-MASONRY CHIMNEY IS SECURED IN 3 LOCATIONS BY METAL TIES.CHIMNEY HAS A BOW.TRIM COVERS JOINT OF CHIMNEY/HOUSE CRACKS THRU-OUT WALL & CHIMNEY.REMEDY:PROVIDE STRUCTURAL ENGINEER'S RENothing owed — awaiting certificate of correction