435 44 STREET
BROOKLYN · BIN 3010996
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
R6BZoning
2,472 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Miscellaneous two family · 2,003 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 21p · 1 filing · 6 docs
Floor 1
Cellar1p · 1 filing · 6 docs
Basement1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AM ARCHITECT'S STUDIO LLC101/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK BUILT, LLCGeneral Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413101/11/2024
Building Lifecycle
All (27)Filed (1)Permit Issued (2)Signed Off (1)Violation (6)Special Inspection (17)
05/01/2025
Signed off — Alteration
REPAIR EXISTING REAR ADDITION OF TWO FAMILY DWELLING AS SHOWN ON PLANS.
B00963530-I1
03/28/2025
Permit issued — General Construction
B00963530-I1-GC
12/02/2024
Permit issued — General Construction
B00963530-I1-GC
03/12/2024
Violation issued (ECB, closed)
Construction
01/11/2024
Filed — Alteration
REPAIR EXISTING REAR ADDITION OF TWO FAMILY DWELLING AS SHOWN ON PLANS.
B00963530-I1
11/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALLENDE MATOS
11/15/2023
Special inspection requirement — Concrete - Cast-In-Place
ALLENDE MATOS
11/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
11/15/2023
Special inspection requirement — Masonry
ALLENDE MATOS
11/15/2023
Special inspection requirement — Subgrade Inspections
ALLENDE MATOS
11/15/2023
Special inspection requirement — Vertical Masonry Foundation Elements
ALLENDE MATOS
11/15/2023
Special inspection requirement — Final
ALLENDE MATOS
11/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
ALLENDE MATOS
11/15/2023
Special inspection requirement — Air barrier — testing
ALLENDE MATOS
11/15/2023
Special inspection requirement — Fenestration air leakage
ALLENDE MATOS
11/15/2023
Special inspection requirement — Air barrier - visual inspection
ALLENDE MATOS
11/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ALLENDE MATOS
11/15/2023
Special inspection requirement — Fenestration areas
ALLENDE MATOS
11/15/2023
Special inspection requirement — Interior lighting power
ALLENDE MATOS
11/15/2023
Special inspection requirement — Insulation placement and R values
ALLENDE MATOS
11/15/2023
Special inspection requirement — Protection of exposed foundation insulation
ALLENDE MATOS
11/15/2023
Special inspection requirement — Permanent certificate
ALLENDE MATOS
09/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/20/2001
Violation issued (ECB, closed)
Construction
02/20/2001
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
01/17/1998
Violation issued (ECB, closed)
Plumbing
12/12/1997
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offROCK BUILT, LLC03/28/2025
DOB NOWGeneral ConstructionSigned-offROCK BUILT, LLC12/02/2024
1 project · most recent 04/17/2024
General Wiring
FiledStatusContractorScope
04/17/2024CompleteADAM ELECL CONTRNG LLCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
11/15/2023Structural Stability – Alterations of existing buildingsALLENDE MATOSspecial
11/15/2023Concrete - Cast-In-PlaceALLENDE MATOSspecial
11/15/2023Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
11/15/2023MasonryALLENDE MATOSspecial
11/15/2023Subgrade InspectionsALLENDE MATOSspecial
11/15/2023Vertical Masonry Foundation ElementsALLENDE MATOSspecial
11/15/2023FinalALLENDE MATOSprogress
11/15/2023Fire-Resistance Rated ConstructionALLENDE MATOSprogress
11/15/2023Air barrier — testingALLENDE MATOSenergy_progress
11/15/2023Fenestration air leakageALLENDE MATOSenergy_progress
11/15/2023Air barrier - visual inspectionALLENDE MATOSenergy_progress
11/15/2023Fenestration and door U-factor and product ratingsALLENDE MATOSenergy_progress
11/15/2023Fenestration areasALLENDE MATOSenergy_progress
11/15/2023Interior lighting powerALLENDE MATOSenergy_progress
11/15/2023Insulation placement and R valuesALLENDE MATOSenergy_progress
11/15/2023Protection of exposed foundation insulationALLENDE MATOSenergy_progress
11/15/2023Permanent certificateALLENDE MATOSenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026B00963530-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026B00963530-I1Open ↗
08/22/2026B00963530-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00963530-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B00963530-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00963530-I1Open ↗