← Back
BuildNYC
Multi-story retail building (2+)
435 7TH AVENUE
MANHATTAN · BIN 1015217
💬 Discuss this project
2002Year Built
3Stories
K2Building Class
C6-6Zoning
39,983 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Multi-story retail building (2+) · Owner of record: Vno 435 Seventh · 11,013 sf lot · 3.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVornado Realty Trust8p · 2 filings · 20 docs
Floor 3Vornado Realty Trust1 filing · 20 docs
Floor 2Vornado Realty Trust1 filing · 20 docs
Floor 1
CellarVornado Realty Trust1 filing · 20 docs
Site & exteriorForever 2125p · 16 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vornado Realty Trust10210/04/2026
Vno 435 Seventh1403/22/2026
CS Hudson507/08/2026
E.C. Provini Co103/22/2026
Vorbado Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York Sign Consultants603/21/2026
Synergy Building Consultants203/21/2026
2260 MAG403/21/2026
Kazam Consultants1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Balaton ConsultingSign hanger1107/08/2026
Starr IndustriesScaffold603/21/2026
Mauceri Sign CoSign hanger306/27/2026
City Electrical Sign ErectorsElectrical203/22/2026
SRM Electrical ServicesElectrical203/21/2026
Service Sign Erectors CoSign hanger207/08/2026
SRM Electrical ServiceElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Delta Testing Labs687610/02/2026
Building Lifecycle
All (151)Filed (27)Permit Issued (18)Signed Off (13)Violation (60)Objection (3)Special Inspection (30)
10/20/2026
Objection raised — Other
10/14/2026
Objection raised — Other
10/14/2026
Objection raised — Other
10/02/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-S7
10/02/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-S9
10/02/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-S8
10/02/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-Z1
10/01/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-S6
10/01/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-S5
09/30/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-S2
09/29/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-S1
09/25/2026
Filed — Alteration CO
INSTALLATION AND MODIFICATION OF SPRINKLER AND MANUAL WET STANDPIPE SYSTEMS, INCLUDING PIPING, SPRINKLER BOOSTER AND JOCKEY PUMPS, FLOOR CONTROL VALVES, HOSE VALVES, FIRE DEPARTMENT CONNECTION AND ASSOCIATED EQUIPMENT.
M01452172-I1
09/07/2026
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Subgrade Inspections
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Masonry
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Demolition
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Concrete - Cast-In-Place
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Demolition
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Luminous Exit Path Markings
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Sprayed fire-resistant materials
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
09/03/2026
Special inspection requirement — Preliminary
RICHARD GREENWALD
09/01/2026
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
09/01/2026
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
09/01/2026
Special inspection requirement — Footing and Foundation
RICHARD GREENWALD
09/01/2026
Special inspection requirement — Final
RICHARD GREENWALD
08/27/2026
Special inspection requirement — Final
RICHARD GREENWALD
08/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
08/24/2026
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01286368-I1
08/24/2026
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01286367-I1
08/24/2026
Signed off — Alteration
M01286366-I1
09/19/2025
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01286368-I1
09/19/2025
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01286367-I1
09/19/2025
Filed — Alteration
M01286366-I1
09/19/2025
Permit issued — Sign
M01286368-I1-SG
09/19/2025
Permit issued — Sign
M01286367-I1-SG
09/19/2025
Permit issued — Sign
M01286366-I1-SG
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/17/2021
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00417822-I1
02/17/2021
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00417822-S1
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMauceri Sign Co09/19/2025
DOB NOWSignSigned-offMauceri Sign Co09/19/2025
DOB NOWSignSigned-offMauceri Sign Co09/19/2025
DOB NOWConstruction FenceSigned-offStarr Industries01/14/2021
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co01/11/2021
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co01/07/2021
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co01/07/2021
DOB NOWSidewalk ShedSigned-offStarr Industries01/05/2021
DOB NOWSignPermit IssuedService Sign Erectors Co08/27/2019
DOB NOWSignPermit IssuedService Sign Erectors Co08/20/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/06/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/06/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/05/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/05/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/05/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/05/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/05/2019
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/05/2019
BISSPISSUEDSirina Fire Protection04/18/2019
BISPLISSUEDLouis L.buttermark & Sons03/08/2019
BISOTISSUEDRussco02/22/2019
BISMHISSUEDRussco02/22/2019
BISSPISSUEDSirina Fire Protection02/17/2015
BISEQISSUEDAtlantic Hoisting & Scaff02/19/2014
BISSPISSUEDCode Fire Protection05/17/2012
BISPLISSUEDPar Plumbing Co03/19/2012
BISEQISSUEDRockledge Scaffold03/09/2012
BISOTISSUEDOutfront Media Sign Erectors01/30/2012
BISOTISSUEDOutfront Media Sign Erectors01/30/2012
BISOTISSUEDOutfront Media Sign Erectors01/30/2012
BIS—ISSUEDOutfront Media Sign Erect01/20/2012
BIS—ISSUEDOutfront Media Sign Erect01/20/2012
BIS—ISSUEDOutfront Media Sign Erect01/20/2012
BISOTISSUEDAmericon Construction10/07/2011
BISEQISSUEDAmericon Construction10/07/2011
BISEQISSUEDPJP Installers10/05/2011
BISEQISSUEDPJP Installers09/16/2011
BISEQISSUEDPJP Installers09/15/2011
BISOTISSUEDAmericon Construction07/13/2011
BISMHISSUEDAmericon Construction07/13/2011
+ 28 more permits on file
1 project · most recent 10/02/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/02/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Lg ZRUM121BTE6 120,000 BTU · Vrf Outdoor ×2
ZRUM192BTE6 192,000 BTU · Vrf Outdoor ×2
ZRUM096BTE6 96,000 BTU · Vrf Outdoor ×1
ZRUM241BTE6 240,000 BTU · Vrf Outdoor ×1
ZRUM312BTE6 312,000 BTU · Vrf Outdoor ×1
Ventilation
Vts America AVS055 6,500 CFM · Ahu ×1
1 project · most recent 10/02/2026
Sprinkler System
FiledStatusContractorScope
10/02/2026——Sprinkler System
1 project · most recent 10/02/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/02/2026——Storm, Water/Sanitary
16 projects · most recent 09/08/2025
General Wiring
FiledStatusContractorScope
09/08/2025CompleteSRM Electrical ServiceGeneral Wiring
09/03/2025CancelledSRM Electrical ServiceGeneral Wiring
01/07/2021CompleteCity Electrical Sign Erectors—
01/07/2021CompleteCity Electrical Sign Erectors—
01/07/2021CompleteCity Electrical Sign Erectors—
12/31/2020CompleteJ.A. Lee Electric Services—
05/16/2019CompleteCity Electrical Sign Erectors—
05/16/2019CompleteCity Electrical Sign Erectors—
05/16/2019CompleteCity Electrical Sign Erectors—
05/16/2019CompleteCity Electrical Sign Erectors—
05/16/2019CompleteCity Electrical Sign Erectors—
05/16/2019CompleteCity Electrical Sign Erectors—
05/16/2019CompleteCity Electrical Sign Erectors—
05/16/2019CompleteCity Electrical Sign Erectors—
02/28/2019CompletePatriot ElectricGeneral Wiring
1 project · most recent 10/02/2026
Steel Concrete
FiledStatusContractorScope
10/02/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
09/07/2026Structural Steel - DetailsRICHARD GREENWALDspecial
09/07/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/07/2026Subgrade InspectionsRICHARD GREENWALDspecial
09/07/2026Structural Steel - WeldingRICHARD GREENWALDspecial
09/07/2026Structural Steel - High Strength BoltingRICHARD GREENWALDspecial
09/07/2026Post-installed AnchorsRICHARD GREENWALDspecial
09/07/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/07/2026MasonryRICHARD GREENWALDspecial
09/07/2026DemolitionRICHARD GREENWALDspecial
09/07/2026Construction Operations Influencing Adjacent StructuresRICHARD GREENWALDspecial
09/07/2026Concrete - Cast-In-PlaceRICHARD GREENWALDspecial
09/07/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/07/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/03/2026Tenant Protection Plan ComplianceRICHARD GREENWALDspecial
09/03/2026Construction Operations Influencing Adjacent StructuresRICHARD GREENWALDspecial
09/03/2026DemolitionRICHARD GREENWALDspecial
09/03/2026Exterior Insulation and Finish Systems (EIFS)RICHARD GREENWALDspecial
09/03/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
09/03/2026Luminous Exit Path MarkingsRICHARD GREENWALDspecial
09/03/2026Sprayed fire-resistant materialsRICHARD GREENWALDspecial
09/03/2026Wall Panels, Curtain Walls, and VeneersRICHARD GREENWALDspecial
09/03/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
09/03/2026Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
09/03/2026PreliminaryRICHARD GREENWALDprogress
09/01/2026Sprinkler SystemsRICHARD GREENWALDspecial
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Forever 21RetailFloors 1, 2
Project M00175068 Alteration · Permit Entire · 08/19/2019
Project M00175229 Alteration · Permit Entire · 08/19/2019
Project M00107937 Alteration · LOC Issued · 02/05/2019
Project M00107941 Alteration · LOC Issued · 02/05/2019
Project M00107943 Alteration · LOC Issued · 02/05/2019
Project M00107946 Alteration · LOC Issued · 02/05/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 353 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch11
09/05/2026M00107937-I1Request digital key ↗
09/05/2026M00107955-I1Request digital key ↗
09/05/2026M00107953-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sign5
09/05/2026M00175068-I1Request digital key ↗
09/05/2026M00175229-I1Request digital key ↗
09/04/2026M00412994-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00417822-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00417822-I1Request digital key ↗
▸Applications & Permits62
▸BISWORK PERMIT APPLICATION33
04/18/2019123510450Open ↗
03/08/2019123467391Open ↗
02/22/2019123467391Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION29
05/10/2019123467391Open ↗
05/09/2019123467391Open ↗
04/18/2019123510450Open ↗
Showing 3 of 29 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
10/04/2026M01452172-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
10/04/2026M01452172-I1Open ↗
▸Seals & Professional Certifications126
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
04/18/2019123510450Open ↗
11/08/2018123467391Open ↗
11/08/2018123467391Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
10/04/2026M01452172-Z1Open ↗
10/04/2026M01452172-S9Open ↗
10/04/2026M01452172-S8Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
04/18/2019123510450Open ↗
11/08/2018123467391Open ↗
06/04/2014122019724Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
10/05/2026M01452172-I1Open ↗
10/05/2026M01452172-I1Open ↗
10/05/2026M01452172-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
06/04/2014122019724Open ↗
04/18/2012121048222Open ↗
03/09/2012120999072Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/05/2026M01452172-I1Open ↗
10/05/2026M01452172-I1Open ↗
10/05/2026M01452172-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/18/2019123510450Open ↗
11/08/2018123467391Open ↗
11/08/2018123467391Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING6
06/03/2014122019724Open ↗
03/08/2013121048222Open ↗
02/26/2013121048222Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
07/31/2015122019724Open ↗
04/29/2015122019724Open ↗
04/04/2012120442128Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
05/10/2019123467391Open ↗
05/09/2019123467391Open ↗
04/18/2019123510450Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/09/2013121045243Open ↗
04/16/2012121045243Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
07/31/2015122019724Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
02/21/2014121924604Open ↗
01/31/2012120963813Open ↗
01/31/2012120963797Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
10/11/2011120851426Open ↗
Showing 1 of 4 on file for this type
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/08/2018123467391Open ↗
11/08/2018123467391Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/23/2013120704719Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/23/2013120704719Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs46
▸BISADMINISTRATIVE OBJECTIONS16
04/21/2012121048222Open ↗
04/18/2012121048222Open ↗
04/16/2012121045243Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWTransit Authority Approval15
09/05/2026M00107937-I1Open ↗
09/05/2026M00107955-I1Open ↗
09/05/2026M00107950-I1Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
09/24/2018120442128Open ↗
09/06/2018121924604Open ↗
10/06/2015122019724Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/01/2013120826954Open ↗
09/07/2012120999072Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
11/08/2018123467391Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
04/18/2019123510450Open ↗
11/08/2018123467391Open ↗
11/08/2018123467391Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms34
▸BISEFILING COVER SHEET22
04/18/2019123510450Open ↗
11/08/2018123467391Open ↗
11/08/2018123467391Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION7
04/11/2013120704719Open ↗
03/08/2013121048222Open ↗
04/17/2012120999072Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
05/09/2019123467391Open ↗
03/08/2019123467391Open ↗
09/24/2018120442128Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet1
09/29/2011120826936Open ↗
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
08/20/2014122019724Open ↗
02/01/2013120826954Open ↗
09/07/2012120999072Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial2
10/04/2026M01452172-I1Open ↗
10/04/2026M01452172-S7Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type