← Back
Elevator apt, fireproof with stores
435 Coney Island Apartments
435 CONEY ISLAND AVENUE · Flatbush (West)-Ditmas Park-Parkville · BIN 3430130
💬 Discuss this project
2023Year Built
8Stories
D6Building Class
R7AZoning
110,375 sfGross Floor Area
91Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 425 CONEY ISLAND LLC · 21,390 sf lot · 5.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Floor 12 filings
Site & exterior3 filings
Filed — no permit issued1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROGERS BUILDERS DEVEL7407/08/2026
OWNERS REP603/22/2026
JOYLAND MANAGEMENT108/28/2026
425 CONEY ISLAND LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2019$16.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BDP EXPEDITERS GROUP1803/21/2026
AE DESIGN SOLUTION603/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROGERS DEVELOPERS GRP LLCGeneral Contractor2507/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
METFLOW FIRE CONTROL LLCFire Protection407/08/2026
CREATIVE PLUMBING INPlumbing207/08/2026
YOSEF STERNElectrical103/21/2026
NET POWER ELECTRIC CORP 004184General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECNICO SPECIAL INSPECTIO59391607/30/2025
A&B WORLD CONSULTING, INC5704101/06/2023
Building Lifecycle
All (191)Filed (25)Permit Issued (19)Signed Off (14)Violation (9)Inspection (14)Objection (80)Special Inspection (30)
08/21/2026
Objection resolved — Addressed
08/20/2026
Objection raised — Other
07/29/2026
Filed — Alteration
JOB FILED FOR INTERIOR RENOVATION TO REMOVE FIXTURES PER PLAN ON THE PARTIAL 1ST FLOOR IN ORDER TO RESOLVE ECB VIOLATION #39181079K.,NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01436223-I1
04/16/2026
Violation issued (ECB, open)
Construction
03/20/2026
Violation issued (ECB, open)
Construction
03/19/2026
Violation issued (ECB, open)
Unknown
03/19/2026
Violation issued (ECB, open)
Construction
03/19/2026
Violation issued (ECB, open)
Construction
12/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2025
Special inspection requirement — Fenestration air leakage
Jose Lockhart
08/11/2025
Special inspection requirement — Protection of exposed foundation insulation
Jose Lockhart
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jose Lockhart
08/11/2025
Special inspection requirement — Fenestration areas
Jose Lockhart
08/11/2025
Special inspection requirement — Interior lighting power
Jose Lockhart
08/11/2025
Special inspection requirement — Maintenance information
Jose Lockhart
08/11/2025
Special inspection requirement — Metering
Jose Lockhart
08/11/2025
Special inspection requirement — Exterior lighting power
Jose Lockhart
08/11/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Jose Lockhart
08/11/2025
Special inspection requirement — Air barrier continuity plan testing
Jose Lockhart
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Lockhart
08/11/2025
Special inspection requirement — Insulation placement and R values
Jose Lockhart
08/11/2025
Special inspection requirement — Vestibules
Jose Lockhart
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Lockhart
08/11/2025
Special inspection requirement — Lighting in dwelling units
Jose Lockhart
08/11/2025
Special inspection requirement — Electrical motors and elevators
Jose Lockhart
08/11/2025
Special inspection requirement — Lighting controls
Jose Lockhart
08/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Lockhart
08/11/2025
Special inspection requirement — Air barrier - visual inspection
Jose Lockhart
07/30/2025
Filed — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-A1
07/29/2025
Special inspection requirement — Air barrier - visual inspection
Jose Lockhart
07/29/2025
Special inspection requirement — Maintenance information
Jose Lockhart
07/29/2025
Special inspection requirement — Lighting in dwelling units
Jose Lockhart
07/29/2025
Special inspection requirement — Lighting controls
Jose Lockhart
07/29/2025
Special inspection requirement — Electrical motors and elevators
Jose Lockhart
07/29/2025
Special inspection requirement — Insulation placement and R values
Jose Lockhart
07/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jose Lockhart
07/29/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Jose Lockhart
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Lockhart
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Lockhart
07/29/2025
Special inspection requirement — Exterior lighting power
Jose Lockhart
06/04/2025
Filed — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-P9
05/12/2025
Signed off — Alteration
B00734065-I1
05/08/2025
Signed off — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-S5
05/08/2025
Signed off — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-S4
04/16/2025
Objection resolved — Addressed
03/27/2025
Objection raised — Energy
03/26/2025
Filed — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-P8
08/29/2024
Signed off — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-S6
08/20/2024
Filed — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-P7
07/15/2024
Signed off — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-S3
07/15/2024
Signed off — Alteration
B00725165-I1
07/15/2024
Signed off — Alteration
B00725165-S1
07/15/2024
Signed off — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-S1
07/11/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/03/2024
Signed off — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-S2
06/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY AIR PRESSURIZED STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB NUMBER B00648659
B08049617-I1
06/20/2024
Filed — New Building
Foundation and Earthwork work inconjuction with New Building Job number B00648659
B00648659-P5
06/20/2024
Permit issued — Mechanical Systems
B00648659-S5-MS
06/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/17/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offROGERS DEVELOPERS GRP LLC06/20/2024
DOB NOWCurb CutSigned-offROGERS DEVELOPERS GRP LLC05/30/2024
DOB NOWCurb CutSigned-offROGERS DEVELOPERS GRP LLC05/29/2024
DOB NOWPlumbingSigned-offAB PLUMBING INC05/03/2024
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC08/31/2023
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC08/31/2023
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC08/11/2023
DOB NOWProtection and Mechanical MethodsSigned-offROGERS DEVELOPERS GRP LLC08/08/2023
DOB NOWGeneral ConstructionPermit IssuedROGERS DEVELOPERS GRP LLC07/25/2023
DOB NOWStructuralSigned-offROGERS DEVELOPERS GRP LLC07/19/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/05/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/05/2023
DOB NOWPlumbingSigned-offAB PLUMBING INC05/30/2023
DOB NOWConstruction FenceSigned-offROGERS DEVELOPERS GRP LLC05/17/2023
DOB NOWFoundationSigned-offROGERS DEVELOPERS GRP LLC04/26/2023
DOB NOWFoundationSigned-offROGERS DEVELOPERS GRP LLC04/26/2023
DOB NOWSupport of ExcavationSigned-offROGERS DEVELOPERS GRP LLC04/20/2023
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC01/25/2023
DOB NOWConstruction FenceSigned-offROGERS DEVELOPERS GRP LLC05/31/2022
1 project · most recent 07/30/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2025Signed-offROGERS DEVELOPERS GRP LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM 36,000 BTU · Condensing Unit ×106
PUZ-A24NHA7 24,000 BTU · Condensing Unit ×24
MXZ-SM60NAM 60,000 BTU · Condensing Unit ×2
Ventilation
Captiveaire CASRTU4-I.300-30-25T-ERV 7,065 CFM · Condensing Unit ×1
1 project · most recent 07/30/2025
Sprinkler System
FiledStatusContractorScope
07/30/2025Signed-offMETFLOW FIRE CONTROL LLCSprinkler System
1 project · most recent 07/30/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/30/2025Signed-offCREATIVE PLUMBING INGas, Storm, Water/Sanitary
7 projects · most recent 04/08/2025
General Wiring
FiledStatusContractorScope
04/08/2025CompleteNET POWER ELECTRIC CORPGeneral Wiring
06/05/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
05/23/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
08/16/2023CompletePOWER DIRECT ELECTRIC INC—
06/01/2023CompleteSOLAS ELECTRICAL CORP—
04/26/2022CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
04/26/2022CompleteHIVOLTS ELECTRICAL INC—
1 project · most recent 07/30/2025
Concrete
FiledStatusContractorScope
07/30/2025Signed-offROGERS DEVELOPERS GRP LLCConcrete
1 project · most recent 07/30/2025
Earthwork Support of Excavation
FiledStatusContractorScope
07/30/2025Signed-offROGERS DEVELOPERS GRP LLCEarthwork, Support of Excavation
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/11/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
06/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
10/13/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/27/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/11/2025Fire-Resistant Penetrations and JointsJose Lockhartspecial
08/11/2025Exterior Insulation and Finish Systems (EIFS)Jose Lockhartspecial
08/11/2025Energy Code Compliance InspectionsJose Lockhartprogress
08/11/2025Fire-Resistance Rated ConstructionJose Lockhartprogress
08/11/2025Protection of exposed foundation insulationJose Lockhartenergy_progress
08/11/2025Interior lighting powerJose Lockhartenergy_progress
08/11/2025Fenestration areasJose Lockhartenergy_progress
08/11/2025MeteringJose Lockhartenergy_progress
08/11/2025Exterior lighting powerJose Lockhartenergy_progress
08/11/2025Air barrier - visual inspectionJose Lockhartenergy_progress
08/11/2025Maintenance informationJose Lockhartenergy_progress
08/11/2025VestibulesJose Lockhartenergy_progress
08/11/2025Insulation placement and R valuesJose Lockhartenergy_progress
08/11/2025Fenestration air leakageJose Lockhartenergy_progress
08/11/2025Air barrier continuity plan testingJose Lockhartenergy_progress
08/11/2025Lighting in dwelling unitsJose Lockhartenergy_progress
08/11/2025Electrical motors and elevatorsJose Lockhartenergy_progress
08/11/2025Lighting controlsJose Lockhartenergy_progress
08/11/2025Fenestration and door U-factor and product ratingsJose Lockhartenergy_progress
07/29/2025Fire-Resistant Penetrations and JointsJose Lockhartspecial
07/29/2025Fenestration areasJose Lockhartenergy_progress
07/29/2025Air barrier continuity plan testingJose Lockhartenergy_progress
07/29/2025Fenestration and door U-factor and product ratingsJose Lockhartenergy_progress
07/29/2025Protection of exposed foundation insulationJose Lockhartenergy_progress
07/29/2025Interior lighting powerJose Lockhartenergy_progress
Latest 25 of 150.
▾Documents — 291 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/29/2026B00734065-I1Request digital key ↗
08/27/2026B00883767-I1Request digital key ↗
08/27/2026B00883767-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/08/2024340907790Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/08/2024340907790Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications179
▸DOB NOWProgress Inspector Seal & Signature110
08/22/2026B00648659-I1Open ↗
08/22/2026B00648659-P1Open ↗
08/22/2026B00648659-P2Open ↗
Showing 3 of 110 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
09/01/2026B08049617-I1Open ↗
09/01/2026B08049617-I1Open ↗
09/01/2026B08049617-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/29/2026B00734065-I1Open ↗
08/27/2026B00883767-I1Open ↗
08/27/2026B00883767-P1Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/08/2024340907790Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/08/2024340907790Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/21/2026B00648659-I1—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist6
08/21/2026B00648659-I1Open ↗
08/21/2026B00648659-P5Open ↗
08/21/2026B00648659-P2Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
02/08/2024340907790Open ↗
▸BISSTREET TREE CHECKLIST1
02/08/2024340907790Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos22
▸DOB NOWOER: Notice to Proceed13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
08/29/2024340907790Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
02/08/2024340907790Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports1
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
09/06/2024340907790Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/06/2024340907790Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
02/08/2024340907790Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/08/2024340907790Open ↗
▸Other Documents26
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/21/2026B00648659-I1Open ↗
08/21/2026B00648659-P5Open ↗
08/21/2026B00648659-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
02/08/2024340907790Open ↗
02/08/2024340907790Open ↗
02/08/2024340907790Open ↗
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
09/06/2024340907790Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type