← Back
Gas or electric utility
4350 3 AVENUE
BRONX · BIN 2095212
💬 Discuss this project
0Year Built
—Stories
U2Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
0 Open Violations
Gas or electric utility · Owner of record: CON EDISON · 219,588 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED EDISON507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CIVIL ENGINEER107/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAILROAD CONSTRUCTION COGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106107/08/2020
Building Lifecycle
All (12)Filed (1)Permit Issued (3)Signed Off (1)Special Inspection (7)
04/04/2023
Signed off — Alteration
X00304342-I1
06/28/2021
Permit issued — Structural
X00304342-I1-ST
04/05/2021
Permit issued — Structural
X00304342-I1-ST
07/30/2020
Permit issued — Structural
X00304342-I1-ST
07/08/2020
Filed — Alteration
X00304342-I1
03/02/2020
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
01/27/2020
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/27/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
01/27/2020
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
01/27/2020
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
01/27/2020
Special inspection requirement — Final
GEORGE GHEBRYAL
01/27/2020
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offRAILROAD CONSTRUCTION CO06/28/2021
DOB NOWStructuralSigned-offRAILROAD CONSTRUCTION CO04/05/2021
DOB NOWStructuralSigned-offRAILROAD CONSTRUCTION CO07/30/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
03/02/2020Subgrade InspectionsGEORGE GHEBRYALspecial
01/27/2020Post-installed AnchorsGEORGE GHEBRYALspecial
01/27/2020Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
01/27/2020Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
01/27/2020Structural Steel - WeldingGEORGE GHEBRYALspecial
01/27/2020FinalGEORGE GHEBRYALprogress
01/27/2020Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Structural1
08/26/2026X00304342-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWSpecial Inspector Seal & Signature6
08/23/2026X00304342-I1Open ↗
08/23/2026X00304342-I1Open ↗
08/23/2026X00304342-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X00304342-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X00304342-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00304342-I1Open ↗