Locations of Work
ArchitectureStructuralGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issuedProp. Two - Family Residence10p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect109/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Island Associates103/21/2026
Building Lifecycle
All (28)Filed (1)Objection (1)Special Inspection (26)
09/25/2025
Objection raised — Scope
09/12/2025
Filed — New Building
PROPOSED DETACHED TWO-FAMILY RESIDENCE WITH ACCESSORY OFF-STREET OPEN PARKING FOR TWO CARS.
S01284500-I1
09/09/2025
Special inspection requirement — Mechanical Systems
09/09/2025
Special inspection requirement — Concrete - Cast-In-Place
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
09/09/2025
Special inspection requirement — Subgrade Inspections
09/09/2025
Special inspection requirement — Final
09/09/2025
Special inspection requirement — Footing and Foundation
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
09/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/09/2025
Special inspection requirement — Structural Wood Frame
09/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/09/2025
Special inspection requirement — Air barrier — testing
09/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
09/09/2025
Special inspection requirement — Insulation placement and R values
09/09/2025
Special inspection requirement — Air barrier - visual inspection
09/09/2025
Special inspection requirement — Fenestration areas
09/09/2025
Special inspection requirement — Metering
09/09/2025
Special inspection requirement — Interior lighting power
09/09/2025
Special inspection requirement — Electric vehicle service equipment requirements
09/09/2025
Special inspection requirement — Maintenance information
09/09/2025
Special inspection requirement — Fenestration air leakage
09/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/09/2025
Special inspection requirement — Permanent certificate
09/09/2025
Special inspection requirement — Ventilation and air distribution system
09/09/2025
Special inspection requirement — Protection of exposed foundation insulation
Nothing on file for this building.
1 project · most recent 09/12/2025
Concrete Wood
FiledStatusContractorScope
09/12/2025——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/09/2025Mechanical Systems—special
09/09/2025Concrete - Cast-In-Place—special
09/09/2025Fire-Resistant Penetrations and Joints—special
09/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/09/2025Subgrade Inspections—special
09/09/2025Final—progress
09/09/2025Footing and Foundation—progress
09/09/2025Energy Code Compliance Inspections—progress
09/09/2025Fire-Resistance Rated Construction—progress
09/09/2025Structural Wood Frame—progress
09/09/2025HVAC-R and service water piping design and insulation—energy_progress
09/09/2025Air barrier — testing —energy_progress
09/09/2025Fenestration and door U-factor and product ratings—energy_progress
09/09/2025Insulation placement and R values—energy_progress
09/09/2025Air barrier - visual inspection—energy_progress
09/09/2025Fenestration areas—energy_progress
09/09/2025Metering—energy_progress
09/09/2025Interior lighting power—energy_progress
09/09/2025Electric vehicle service equipment requirements—energy_progress
09/09/2025Maintenance information—energy_progress
09/09/2025Fenestration air leakage—energy_progress
09/09/2025HVAC-R and service water heating equipment—energy_progress
09/09/2025HVAC-R and service water heating system controls—energy_progress
09/09/2025Permanent certificate—energy_progress
09/09/2025Ventilation and air distribution system—energy_progress
Latest 25 of 26.
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026S01284500-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01284500-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01284500-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026S01284500-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01284500-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01284500-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026S01284500-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01284500-I1Open ↗