← Back
BuildNYC
Walk-up cooperative
436 WEST 47TH STREET
MANHATTAN · BIN 1026506
💬 Discuss this project
1901Year Built
5Stories
C6Building Class
R8Zoning
11,080 sfGross Floor Area
10Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 436-438 West 47th St Associalt · 2,711 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLimited exterior repairs6p · 2 filings · 20 docs
Floor 5Limited exterior repairs3p · 1 filing · 8 docs
Floor 4Limited exterior repairs3p · 1 filing · 8 docs
Floor 3Unit 3B25p · 2 filings · 20 docs
Floor 2Unit 2A9p · 2 filings · 18 docs
Floor 1Limited exterior repairs3p · 1 filing · 8 docs
Site & exteriorLight duty pipe scaffold installation3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
436-438 W 47th St Owners2103/21/2026
James Development1004/09/2026
436-438 WE203/21/2026
A. Michael Tyler Realty203/21/2026
436-438 West 47th St Associalt103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jack Green Associates204/14/2026
Ronald Nemec Architect405/02/2025
Enthink Engineers102/16/2023
SW Engineering Company110/28/2022
Carol Maryan Architect206/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Clarke Construction Consultants703/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N DolciniumGeneral Contractor303/21/2026
Gtex ElectricElectrical203/22/2026
Jepol ConstructionGeneral Contractor107/08/2026
Lipa Mechanicalspecialty_contractor104/09/2026
Phoenix Sutton STRScaffold107/08/2026
Authentic PlumbingPlumbing107/08/2026
AL-Wes Electric ServicesElectrical103/21/2026
BMT Plumbing & HeatingPlumbing107/08/2026
Gtex ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jack Green Associates422204/14/2026
Ronald Nemec Architect, P8386205/02/2025
SWL Engineering Inspectio6912110/28/2022
Building Lifecycle
All (114)Filed (10)Permit Issued (6)Signed Off (6)Violation (60)Inspection (4)Objection (28)
05/06/2026
Signed off — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-I1
05/06/2026
Signed off — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-S2
04/23/2026
Signed off — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-S1
04/14/2026
Filed — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-P3
03/20/2026
Permit issued — Mechanical Systems
M01120521-S2-MS
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
11/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/19/2025
Objection raised — Admin
11/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/04/2025
Objection resolved — Addressed
11/04/2025
Objection resolved — Addressed
07/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2025
Objection raised — Scope
06/09/2025
Objection raised — Scope
06/09/2025
Objection raised — Admin
06/09/2025
Objection raised — Fire_Protection
06/04/2025
Violation issued (HPD, closed)
A
05/21/2025
Filed — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-S2
05/02/2025
Filed — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-P2
05/02/2025
Signed off — Alteration
LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00704547-I1
05/01/2025
Filed — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-P1
04/02/2025
Permit issued — Plumbing
M01120521-S1-PL
03/13/2025
Permit issued — General Construction
M01120521-I1-GC
02/05/2025
Objection resolved — Addressed
02/03/2025
Objection resolved — Addressed
01/27/2025
Objection raised — Admin
01/08/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
12/20/2024
Objection resolved — Addressed
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Zoning
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Scope
12/17/2024
Objection raised — Fire_Protection
12/11/2024
Filed — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-I1
12/11/2024
Filed — Alteration
INTERIOR RENOVATION OF APT 3B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01120521-S1
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
07/26/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00818195-I1
03/16/2023
Permit issued — General Construction
M00704547-I1-GC
03/15/2023
Violation issued (HPD, closed)
A
02/17/2023
Permit issued — Supported Scaffold
M00818195-I1-SF
02/16/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00818195-I1
10/28/2022
Filed — Alteration
LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00704547-I1
02/16/2022
Violation issued (HPD, closed)
A
10/20/2021
Signed off — Alteration
M00442180-I1
06/29/2021
Filed — Alteration
M00442180-P1
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2021
Violation issued (ECB, closed)
Unknown
03/02/2021
Permit issued — Plumbing
M00442180-I1-PL
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLipa Mechanical03/20/2026
DOB NOWPlumbingSigned-offAuthentic Plumbing04/02/2025
DOB NOWGeneral ConstructionSigned-offJ & N Dolcinium03/13/2025
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP03/16/2023
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR02/17/2023
DOB NOWPlumbingSigned-offBMT Plumbing & Heating03/02/2021
BISOTISSUEDIshco03/03/2021
BISPLISSUEDBT's Plumbing and Heating06/06/2018
BISOTISSUEDDI Martini03/06/2018
BISMHISSUEDDI Martini03/06/2018
BISPLISSUEDMetrotech Mechanical05/30/2014
BISPLISSUEDA P Plumbing & Heating05/28/2014
BISOTISSUEDKlatke Construction Management05/27/2014
BISOTISSUEDTimocon Interior Construction04/04/2014
BISEQISSUEDArsenal Scaffold08/26/2013
BISOTISSUEDA & E Kitchen Cabinets07/07/2011
BISOTISSUEDA & E Kitchen Cabinets10/13/2010
BISPLISSUEDParkset Plumbing Co04/04/2006
BISOTISSUEDParkset Plumbing Co04/04/2006
BISOTISSUEDRyte Construction11/03/2005
BISOTISSUEDS.M. Construction11/04/2004
BISEQISSUEDRockledge Scaffold04/10/2001
BISOTISSUEDBernini Construction03/12/2001
BISOTISSUEDBernini Construction07/26/2000
BISEQISSUEDRockledge Scaffold05/12/2000
BISBLISSUEDBryan A. Ennist01/06/2000
BISPLRE-ISSUEDPelham Plumbing & Heating01/06/2000
1 project · most recent 04/14/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2026Signed-offLipa MechanicalAir Conditioning Systems
Cooling
Mitsubishi Electric MSZGS09NA 9,000 BTU · Heat Pump Outdoor ×4
MXZ-4C36NA4 35,400 BTU · Condensing Unit ×1
Lg ARNU053SJA4 320 CFM · Vrf Indoor ×4
ARUN038GSS4 42,000 BTU · Vrf Outdoor ×2
3 projects · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026CompleteGtex ElectricGeneral Wiring
02/25/2021CompleteCresco ElectricalGeneral Wiring
02/05/2021CompleteDonald McGeachyGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/04/2026HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
05/04/2026Shutoff dampersLAWRENCE GREENenergy_progress
05/04/2026HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
05/04/2026Maintenance informationLAWRENCE GREENenergy_progress
05/04/2026Mechanical SystemsLAWRENCE GREENspecial
05/04/2026HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
05/04/2026Energy Code Compliance InspectionsLAWRENCE GREENprogress
05/04/2026FinalLAWRENCE GREENprogress
04/13/2026HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
04/13/2026Mechanical SystemsLAWRENCE GREENspecial
04/13/2026Energy Code Compliance InspectionsLAWRENCE GREENprogress
04/13/2026FinalLAWRENCE GREENprogress
04/13/2026Maintenance informationLAWRENCE GREENenergy_progress
04/13/2026Shutoff dampersLAWRENCE GREENenergy_progress
04/13/2026HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
04/13/2026HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
11/13/2025Fire-Resistant Penetrations and JointsRonald Nemecspecial
11/13/2025Lighting in dwelling unitsRonald Nemecenergy_progress
11/13/2025Fire-Resistance Rated ConstructionRonald Nemecprogress
11/13/2025FinalRonald Nemecprogress
11/13/2025Energy Code Compliance InspectionsRonald Nemecprogress
03/23/2022Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
03/23/2022FinalYakov Weinsteinprogress
03/23/2022MasonryJOSHUA LUCKRITZspecial
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
09/01/2026M00704547-I1Request digital key ↗
08/31/2026M00818195-I1Request digital key ↗
08/17/2026M01120521-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00442180-I1Request digital key ↗
08/15/2026M00442180-P1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION17
11/05/2021140995270Open ↗
08/12/2021140994155Open ↗
06/30/2021140994155Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION11
03/08/2021140994155Open ↗
06/11/2018123107128Open ↗
03/07/2018123107128Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/13/2026M01120521-P2Open ↗
08/13/2026M00704547-I1Open ↗
08/13/2026M01120521-I1Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/10/2021140994155Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026M01120521-S2Open ↗
09/01/2026M01120521-S2Open ↗
09/01/2026M01120521-S2Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/06/2019123107128Open ↗
08/15/2017123107128Open ↗
08/15/2017123107128Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00442180-I1Open ↗
09/03/2026M00442180-P1Open ↗
09/01/2026M00704547-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01120521-S2Open ↗
09/01/2026M01120521-I1Open ↗
08/27/2026M00704547-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/09/2014121967087Open ↗
08/23/2013140109451Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/02/2014121992442Open ↗
04/09/2014121967087Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
01/25/2021140994155Open ↗
01/04/2021140995270Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/23/2013140109451Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/23/2013140109451Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/02/2014121992442Open ↗
▸Trade Schedules & Equipment10
▸BISSELF-CERT PLUMBING NOTICE5
10/09/2014121992442Open ↗
09/04/2014121967087Open ↗
07/16/2014121992442Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
04/19/2019123107128Open ↗
04/16/2019123107128Open ↗
08/15/2017123107128Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection22
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist10
08/13/2026M00442180-I1Open ↗
08/13/2026M01120521-I1Open ↗
08/13/2026M01120521-P2Open ↗
Showing 3 of 10 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON3
05/05/2014121992442Open ↗
04/09/2014121967087Open ↗
08/05/2010120426823Open ↗
▸DOB NOWCertificate of No Harassment3
08/13/2026M00704547-I1Open ↗
08/13/2026M01120521-P2Open ↗
08/13/2026M01120521-I1Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST2
01/25/2021140994155Open ↗
01/21/2021140995270Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00442180-P1Open ↗
08/13/2026M00442180-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/29/2021140994155Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/10/2021140994155Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00442180-P1Open ↗
09/03/2026M00442180-I1Open ↗
09/01/2026M00704547-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
01/25/2021140994155Open ↗
01/04/2021140995270Open ↗
08/15/2017123107128Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
08/05/2010120426823Open ↗
08/05/2010120426823Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/10/2019123107128Open ↗
06/06/2019123107128Open ↗
03/07/2018123107128Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/22/2021140994155Open ↗
07/10/2019123107128Open ↗
10/28/2014121992442Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/22/2021140994155Open ↗
01/25/2021140994155Open ↗
01/04/2021140995270Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/23/2013140109451Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/22/2021140994155Open ↗
01/25/2021140994155Open ↗
01/04/2021140995270Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/22/2021140994155Open ↗
07/10/2019123107128Open ↗
10/28/2014121992442Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/04/2021140994155Open ↗
07/24/2014140109451Open ↗
06/11/2014121992442Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
12/12/2018123107128Open ↗
08/15/2017123107128Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
10/22/2021140994155Open ↗
01/25/2021140994155Open ↗
01/04/2021140995270Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION7
10/04/2021140994155Open ↗
03/18/2021140994155Open ↗
01/21/2021140995270Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
07/10/2019123107128Open ↗
06/21/2019123107128Open ↗
04/19/2019123107128Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
08/15/2017123107128Open ↗
05/02/2014121992442Open ↗
04/09/2014121967087Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/31/2020140995270Open ↗
08/23/2013140109451Open ↗
▸Other Documents1
▸BISECCCNYS ANALYSIS1
08/15/2017123107128Open ↗