← Back
BuildNYC
Elevator apt, fireproof without stores
4360 BAYCHESTER AVENUE
BRONX · BIN 2070413
💬 Discuss this project
1964Year Built
6Stories
D3Building Class
R4Zoning
95,726 sfGross Floor Area
72Units
LL97 CoveredRent Stabilized312 Active Violations 311 unresolved · 1 paperwork only 1 likely answered 2 old, status unconfirmed ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: 4360 Baychester · 30,000 sf lot · 3.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSolar PV system installationUnder Construction3p · 4 filings · 10 docs
Floor 3Rooftop antenna and equipment installation1p · 1 filing · 4 docs
Floor 2
Floor 1Heavy duty sidewalk shed installation10p · 3 filings · 6 docs
CellarRooftop antenna and equipment installation2 filings · 7 docs
BasementTelecommunications antenna replacement and equipment room wo1p · 1 filing · 3 docs
Sub-BasementSolar PV system installationUnder Construction2 filings · 3 docs
Site & exteriorSolar PV system installationUnder Construction3p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4360 Baychester903/22/2026
Comprehensive Designs303/22/2026
The Pinnacle Group203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2026$5.1M—43-60 BAYCHESTER, LLC → FLGSP 4360 BAYCHESTER AVE LLC$53/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM Engineering111/06/2026
Mje Professional Services109/17/2024
Asr Engineering108/04/2024
Indrajeet Vagha PE102/08/2023
Elevated Engineering106/21/2021
Navi Structural Engineering106/16/2021
Syed Engineering106/03/2021
KMB Design Group210/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aca Associates103/21/2026
Construction Permit Services103/21/2026
Expediting303/21/2026
CCM Services Group203/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jacobs Telecommunspecialty_contractor603/21/2026
Steel ConstructionScaffold507/08/2026
PS General ConstructionGeneral Contractor303/21/2026
Edwards Kelcey EngineeringGeneral Contractor103/21/2026
B.P. ElectricElectrical103/22/2026
Brooklyn Solarworksspecialty_contractor111/19/2026
J A Lee Electricspecialty_contractor107/08/2026
JascoScaffold107/08/2026
J.A. Lee Electric ServicesElectrical103/21/2026
Antique ContractingGeneral Contractor107/08/2026
Bci CommunicationsGeneral Contractor103/21/2026
Alan E. RosenbergPlumbing106/19/2013
Arthur HoldingGeneral Contractor107/27/1998
Cellular TelephoneGeneral Contractor108/21/1997
Highland Construction AssociatesGeneral Contractor109/08/1999
Jacobs TelecommunGeneral Contractor112/06/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244111/06/2026
Syed Engineering7054108/04/2024
Elevated Engineering3692106/21/2021
KMB Design Group513210/16/2020
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/16/2026
Permit issued — Solar
X01480751-I1-SL
11/06/2026
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01480751-I1
11/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
11/04/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
257 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedBrooklyn Solarworks11/16/2026
DOB NOWSidewalk ShedPermit IssuedSteel Construction09/18/2024
DOB NOWGeneral ConstructionSigned-offAntique Contracting08/07/2024
DOB NOWSidewalk ShedSigned-offSteel Construction01/12/2024
DOB NOWSidewalk ShedSigned-offSteel Construction02/08/2023
DOB NOWAntennaSigned-offMic General Contracting07/21/2021
DOB NOWGeneral ConstructionSigned-offPS General Construction06/29/2021
DOB NOWSidewalk ShedSigned-offJasco06/04/2021
DOB NOWAntennaSigned-offArmentum Digital Infrastr11/17/2020
DOB NOWAntennaSigned-offArmentum Digital Infrastr02/26/2019
BISOTISSUEDJacobs Telecommun12/06/2016
BISFBISSUEDG. Bauer07/02/2013
BISPLISSUEDAlan E. Rosenberg06/19/2013
BISBLISSUEDG. Bauer06/19/2013
BISOTISSUEDBci Communications01/24/2008
BISOTISSUEDEdwards & Kelcey Engineering01/12/2002
BISMHISSUEDHighland Construction Associates09/08/1999
BIS—ISSUEDArthur Holding07/27/1998
BISMHISSUEDCellular Telephone08/21/1997
5 projects · most recent 10/28/2026
General Wiring
FiledStatusContractorScope
10/28/2026Permit IssuedBrooklyn Solar Electric—
05/02/2023Permit IssuedRichard Neu—
12/31/2019Permit IssuedKJK Electric—
12/06/2019Permit IssuedKJK ElectricGeneral Wiring
08/22/2019CompleteB.P. Electric—
1 project · most recent 11/06/2026
FiledStatusContractorScope
11/06/2026Permit IssuedBrooklyn Solarworks—
1 project · most recent 09/17/2024
Sidewalk Shed
FiledStatusContractorScope
09/17/2024Permit IssuedSteel ConstructionSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/04/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
11/04/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/27/2026FinalNARESH MAHANGUprogress
10/27/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/27/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/02/2024FinalRAFI HAMIDprogress
08/02/2024MasonryRAFI HAMIDspecial
08/02/2024Tenant Protection Plan ComplianceRAFI HAMIDspecial
111 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account