Two family frame
437 BRIGHTON STREET
STATEN ISLAND · BIN 5169688
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3AZoning
3,366 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family frame · Owner of record: STEEL INDUSTRIES LLC · 5,000 sf lot · 0.67 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalPlumbing
Floor 34p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELAIR RIDGE DEVELOPMENT CORP.3504/11/2026
BEYER CONSTRUCTION103/22/2026
VOLMAR CONSTRUCTION,INC203/22/2026
STEEL INDUSTRIES503/22/2026
ARCHITECTURE OUTFIT603/21/2026
MAYORS OFFICE OF HOUSING RECOVER703/21/2026
IBTS203/21/2026
BOULER PFLUGER ARCHITECTS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT702/04/2026
A TECH ENGINEERING NYC, PLLC.208/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1403/21/2026
LARGIME MUJOVIC103/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor904/09/2026
CHARLES J. DEHART JR P&HPlumbing407/08/2026
DUO PLUMBING & HTG CORP.Plumbing307/08/2026
SKEN SERVICES CORPGeneral Contractor203/21/2026
LMS ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738309/15/2025
Building Lifecycle
All (74)Filed (10)Permit Issued (10)Signed Off (6)Violation (6)Inspection (10)Objection (2)Special Inspection (30)
04/09/2026
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01229494-I1
04/09/2026
Signed off — New Building
INSTALLATION OF NEW 10'-0" WIDE CURB CUT.
S00915196-S1
04/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/16/2026
Signed off — Alteration
S01134420-I1
02/26/2026
Permit issued — Foundation
S01134420-I1-FO
02/25/2026
Signed off — New Building
INSTALLATION OF NEW 10'-0" WIDE CURB CUT.
S00915196-S4
02/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/19/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/05/2026
Permit issued — Curb Cut
S00915196-S4-CC
02/04/2026
Signed off — New Building
INSTALLATION OF NEW 10'-0" WIDE CURB CUT.
S00915196-S2
02/04/2026
Filed — New Building
INSTALLATION OF NEW 10'-0" WIDE CURB CUT.
S00915196-P3
01/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
01/21/2026
Permit issued — Plumbing
S01229494-I1-PL
11/28/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/20/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/15/2025
Filed — New Building
INSTALLATION OF NEW 10'-0" WIDE CURB CUT.
S00915196-S4
10/09/2025
Permit issued — Plumbing
S25914497-S1-PL
09/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
09/22/2025
Special inspection requirement — Air barrier — testing
anthony santoro
09/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
09/22/2025
Special inspection requirement — Mechanical Systems
anthony santoro
09/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
09/22/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/22/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
09/22/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
anthony santoro
09/22/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
09/22/2025
Special inspection requirement — Footing and Foundation
anthony santoro
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
09/22/2025
Special inspection requirement — Lowest Floor Elevation
anthony santoro
09/22/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
09/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
09/22/2025
Special inspection requirement — Final
anthony santoro
09/22/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
09/22/2025
Special inspection requirement — Ventilation and air distribution system
anthony santoro
09/22/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
09/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
09/22/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
09/22/2025
Special inspection requirement — Interior lighting power
anthony santoro
09/22/2025
Special inspection requirement — Fenestration areas
anthony santoro
09/22/2025
Special inspection requirement — Metering
anthony santoro
09/22/2025
Special inspection requirement — Maintenance information
anthony santoro
09/22/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
09/22/2025
Special inspection requirement — Permanent certificate
anthony santoro
09/15/2025
Filed — New Building
INSTALLATION OF NEW 10'-0" WIDE CURB CUT.
S00915196-P2
08/27/2025
Permit issued — Mechanical Systems
S00915196-I1-GC-CX
08/27/2025
Permit issued — Construction Fence
S00915196-S2-FN
08/15/2025
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01229494-I1
07/29/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
07/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2025
Filed — New Building
INSTALLATION OF NEW 10'-0" WIDE CURB CUT.
S00915196-P1
05/22/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/09/2025
Permit issued — Plumbing
S00915196-S1-PL
03/25/2025
Violation issued (ECB, closed)
Construction
11/08/2024
Filed — Alteration
S01134420-I1
09/24/2024
Permit issued — Structural
S00915196-I1-GC-CX
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offBEYER CONSTRUCTION02/26/2026
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION02/05/2026
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.01/21/2026
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H10/09/2025
DOB NOWMechanical SystemsPermit IssuedBEYER CONSTRUCTION08/27/2025
DOB NOWConstruction FenceSigned-offBEYER CONSTRUCTION08/27/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.05/09/2025
DOB NOWStructuralPermit IssuedBEYER CONSTRUCTION09/24/2024
DOB NOWFull DemolitionSigned-offTT & T CONSTRUCTION INC08/05/2024
DOB NOWConstruction FenceSigned-offBEYER CONSTRUCTION07/11/2024
BIS—ISSUEDSPHINX CONSTRUCTION INC02/16/2018
BIS—ISSUEDSPHINX CONSTRUCTION INC01/26/2018
BISEQISSUEDVOLMAR CONSTRUCTION INC01/26/2018
BISPLISSUEDKATAN P & H INC12/08/2017
BIS—ISSUEDVOLMAR CONSTRUCTION INC11/02/2017
BISPLISSUEDKATAN P & H INC09/21/2017
BIS—ISSUEDVOLMAR CONSTRUCTION INC05/10/2017
BIS—ISSUEDVOLMAR CONSTRUCTION INC04/07/2017
BISEQISSUEDVOLMAR CONSTRUCTION INC03/28/2017
BISEQISSUEDVOLMAR CONSTRUCTION INC12/09/2016
1 project · most recent 02/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/04/2026Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
2 projects · most recent 07/22/2025
General Wiring
FiledStatusContractorScope
07/22/2025CompleteLMS ELECTRICAL CORPGeneral Wiring
03/30/2018CompleteACCURATE ELEC'L CORP.—
1 project · most recent 02/04/2026
Concrete Wood
FiledStatusContractorScope
02/04/2026Signed-offBEYER CONSTRUCTION CORPConcrete, Wood
1 project · most recent 02/04/2026
Fence
FiledStatusContractorScope
02/04/2026Signed-offBEYER CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/19/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
01/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/28/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/20/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
09/22/2025Lowest Floor Elevationanthony santoroprogress
09/22/2025Mechanical Systemsanthony santorospecial
09/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
09/22/2025Concrete - Cast-In-Placeanthony santorospecial
09/22/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
09/22/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/22/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)anthony santorospecial
09/22/2025Subgrade Inspectionsanthony santorospecial
09/22/2025Footing and Foundationanthony santoroprogress
09/22/2025Energy Code Compliance Inspectionsanthony santoroprogress
09/22/2025Structural Wood Frameanthony santoroprogress
09/22/2025Fire-Resistance Rated Constructionanthony santoroprogress
09/22/2025Finalanthony santoroprogress
09/22/2025Fenestration air leakageanthony santoroenergy_progress
09/22/2025Ventilation and air distribution systemanthony santoroenergy_progress
09/22/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
09/22/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
09/22/2025Air barrier - visual inspectionanthony santoroenergy_progress
09/22/2025Interior lighting poweranthony santoroenergy_progress
09/22/2025Fenestration areasanthony santoroenergy_progress
09/22/2025Meteringanthony santoroenergy_progress
09/22/2025Maintenance informationanthony santoroenergy_progress
09/22/2025Insulation placement and R valuesanthony santoroenergy_progress
09/22/2025Permanent certificateanthony santoroenergy_progress
09/22/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
Latest 25 of 61.
▾Documents — 242 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026S01032727-I1Request digital key ↗
08/20/2026S01134420-I1Request digital key ↗
08/19/2026S00915196-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION32
11/03/2022540137207Open ↗
11/03/2022520135602Open ↗
07/19/2022520453759Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION11
01/26/2018520135602Open ↗
01/26/2018540118317Open ↗
12/08/2017540123089Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
02/09/2023540241148Open ↗
02/07/2019540137207Open ↗
01/23/2018540137207Open ↗
Showing 3 of 4 on file for this type
▸BISCertificate Of Occupancy Application1
02/23/2018520135602Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
02/09/2023540241148Open ↗
07/26/2022520453759Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00915196-I1Open ↗
08/13/2026S00915196-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00915196-I1Open ↗
08/13/2026S00915196-P2Open ↗
▸BISZONING DIAGRAM1
03/08/2017520135602Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026S00915196-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature9
09/07/2026S01134420-I1Open ↗
09/07/2026S01134420-I1Open ↗
09/07/2026S01134420-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026S01134420-I1Open ↗
08/19/2026S00915196-P2Open ↗
08/19/2026S00915196-P3Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
02/09/2023540241148Open ↗
10/27/2017540137207Open ↗
03/01/2017540123089Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/07/2026S01134420-I1Open ↗
09/07/2026S01134420-I1Open ↗
08/24/2026S00915196-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/09/2023540241148Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026S01032727-I1Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING6
07/11/2018520135602Open ↗
06/21/2018520135602Open ↗
05/23/2018520135602Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00915196-I1Open ↗
08/13/2026S00915196-P2Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
11/26/2018520135602Open ↗
▸BISGAS CUT-OFF1
04/10/2017520287555Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026S01032727-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026S01032727-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026S01032727-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026S01032727-I1Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST2
08/04/2020520135602Open ↗
05/27/2015540078538Open ↗
▸DOB NOWStreet Tree Checklist2
08/19/2026S00915196-P2Open ↗
08/14/2026S00915196-I1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/10/2017520287555Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/27/2015540078538Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00915196-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/14/2026S00915196-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026S00915196-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/10/2017520287555Open ↗
▸BISRODENT CONTROL1
04/10/2017520287555Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01032727-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026S01032727-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
07/18/2018520135602Open ↗
05/08/2017520135602Open ↗
05/01/2017520135602Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
07/18/2018520135602Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY10
07/18/2018520135602Open ↗
05/08/2017520135602Open ↗
04/20/2017520135602Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
07/23/2018520135602Open ↗
05/08/2017520135602Open ↗
05/27/2015540078538Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
04/20/2017520135602Open ↗
05/27/2015540078538Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S00915196-P2Open ↗
08/13/2026S00915196-I1Open ↗
▸BISHYDRO FLOW TEST LETTER1
03/01/2017540123089Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/08/2017520135602Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
03/01/2017540123089Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
02/09/2023540241148Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00915196-I1Open ↗
▸Approvals, Objections & Sign-offs25
▸BISLETTERS - SUPPORTING DOCUMENTATION13
07/18/2018520135602Open ↗
10/27/2017540137207Open ↗
09/15/2017520135602Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/24/2018520135602Open ↗
12/18/2018520135602Open ↗
03/24/2017520135602Open ↗
Showing 3 of 4 on file for this type
▸BISCertificate Of Occupancy Loc Request4
06/25/2019520135602Open ↗
01/16/2019520135602Open ↗
07/26/2018520135602Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
12/22/2016520287555Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/09/2023540241148Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
02/09/2023540241148Open ↗
▸BISNYS DEC COASTAL EROSION HAZARD APPROVAL1
02/09/2023540241148Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/27/2015540078538Open ↗
▸Filing & Intake Forms38
▸BISADDITIONAL INFORMATION24
08/02/2022520453759Open ↗
12/24/2018520135602Open ↗
12/24/2018520135602Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING COVER SHEET7
07/19/2022520453759Open ↗
04/27/2017520135602Open ↗
04/27/2017520135602Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/27/2017540137207Open ↗
03/01/2017540123089Open ↗
12/02/2016540118317Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
07/19/2022520453759Open ↗
02/23/2018520135602Open ↗
▸Other Documents23
▸BISPLOT DIAGRAM3
04/20/2020520135602Open ↗
10/27/2017540137207Open ↗
03/31/2017520135602Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
04/24/2020540137207Open ↗
04/24/2020540137207Open ↗
04/24/2020540137207Open ↗
▸DOB NOWProperty Ownership Certification3
08/19/2026S00915196-P2Open ↗
08/14/2026S00915196-I1Open ↗
08/13/2026S01032727-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
02/09/2023540241148Open ↗
11/08/2017540137207Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00915196-P2Open ↗
08/13/2026S00915196-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00915196-I1Open ↗
08/13/2026S00915196-P2Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
07/18/2018520135602Open ↗
▸BISNYS APPROVED MODULAR DRAWINGS1
04/20/2020520135602Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026S01032727-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026S01032727-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026S00915196-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026S01032727-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/14/2026S00915196-I1Open ↗
▸DOB NOWTR5H Test Report1
08/13/2026S01134420-I1Open ↗