← Back
Predominantly retail with other uses
437 MCGUINNESS BOULEVARD
BROOKLYN · BIN 3413826
💬 Discuss this project
2022Year Built
4Stories
K4Building Class
M1-2Zoning
21,678 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 51 ASH STREET LLC · 4,900 sf lot · 4.42 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction31p · 4 filings · 20 docs
Floor 4Under Construction25p · 2 filings · 20 docs
Floor 3Under Construction25p · 3 filings · 20 docs
Floor 2Under Construction14p · 3 filings · 15 docs
Floor 1Under Construction15p · 3 filings · 15 docs
MezzanineUnder Construction13p · 2 filings · 12 docs
CellarUnder Construction5p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN CONSTRUCTION GR*503/22/2026
40-52 FRANKLIN STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MYLES ARCHITECTURE, P.C.310/19/2025
FC CONSULTING ENGINEER, PLLC607/29/2025
GEORGE J. XERAKIAS, PE208/13/2024
R SCOTT LEWIS PE PC301/08/2024
ARQUITECTURA VARELA111/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FC CONSULTING ENGINEER1003/21/2026
SELF EMPLOYED103/21/2026
BUILDING BROTHERS603/21/2026
POI LENG ONG203/21/2026
HS DESIGN STUDIO403/21/2026
MYLES ARCHITECTURE P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKLYN CONSTRUCTION GR*General Contractor1104/09/2026
MPS PLUMBING & HEATING INCFire Protection207/08/2026
DEEP FORMATION INCGeneral Contractor207/08/2026
NORTH SHORE NEON SIGN LLCGeneral Contractor203/21/2026
NORTH SHORE NEON SIGNScaffold207/08/2026
COBOT PLUMBING AND HEATING INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FC CONSULTING ENGINEER,PL1958607/29/2025
GEORGE J. XERAKIAS, PE1658208/13/2024
CROSSCHECK INSPECTION SER544101/08/2024
Building Lifecycle
All (132)Filed (15)Permit Issued (14)Signed Off (5)Violation (16)Inspection (7)Objection (45)Special Inspection (30)
01/16/2026
Permit issued — General Construction
B01157733-I1-GC
10/31/2025
Objection raised — Other
10/31/2025
Objection raised — Other
10/31/2025
Objection raised — Other
10/31/2025
Objection raised — Other
10/31/2025
Objection raised — Other
10/31/2025
Objection raised — Other
10/31/2025
Objection raised — Other
10/31/2025
Objection raised — Other
10/31/2025
Objection raised — Scope
10/19/2025
Filed — No Work
B01264984-I1
09/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/01/2025
Special inspection requirement — Public Assembly Emergency Lighting
07/31/2025
Permit issued — Mechanical Systems
B01259198-I1-MS
07/29/2025
Filed — Alteration
FILING TO OBTAIN HVAC EQUIPMENT USE CARD (EUP). NO CHANGE IN BUILDING USE OCCUPANCY AND EGRESS.
B01259198-I1
07/25/2025
Special inspection requirement — Mechanical Systems
Frantz Camulaire
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Frantz Camulaire
07/25/2025
Special inspection requirement — Final
Frantz Camulaire
07/25/2025
Special inspection requirement — Maintenance information
Frantz Camulaire
07/25/2025
Special inspection requirement — HVAC insulation and sealing
Frantz Camulaire
07/25/2025
Special inspection requirement — HVAC and service water heating system controls
Frantz Camulaire
07/25/2025
Special inspection requirement — HVAC and service water heating equipment
Frantz Camulaire
07/24/2025
Filed — Alteration
INSTALLATION OF MECHANICAL HVAC SYSTEM AS PER PLAN. NO CHANGE IN BUILDING USE, OCCUPANCY AND/OR EGRESS.
B00333072-P7
07/21/2025
Special inspection requirement — Mechanical Systems
Frantz Camulaire
07/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Frantz Camulaire
07/21/2025
Special inspection requirement — Final
Frantz Camulaire
07/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Frantz Camulaire
07/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Frantz Camulaire
07/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Frantz Camulaire
06/16/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
06/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/11/2025
Permit issued — Sprinklers
B00336641-I1-EW-SP
06/11/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/11/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2025
Permit issued — Plumbing
B01158280-I1-PL
02/18/2025
Filed — Alteration
B01158280-I1
01/24/2025
Signed off — Alteration
ADDING SUSPENDED SCAFFOLD LOCATIONS TO THE PLANS.
B00969965-I1
12/26/2024
Permit issued — General Construction
B01157733-I1-GC
12/20/2024
Permit issued — Mechanical Systems
B00333072-I1-MS
12/19/2024
Filed — Alteration
B01157733-I1
12/17/2024
Permit issued — Mechanical Systems
B00333072-I1-MS
11/25/2024
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT ENTIRE BUILDING AS PER PLANS. NO CHANGE OF BUILDING USE, OCCUPANCY AND/OR EGRESS.
B00336641-P1
11/07/2024
Special inspection requirement — Sprinkler Systems
Frantz Camulaire
10/29/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
B08031504-I1
09/18/2024
Signed off — Alteration
INSTALL NON-ILLUMINATED ADVERTISING SIGN (SIGN B) ON WALL STRUCTURE FILED UNDER SEPARATE APPLICATION # B00982899 (CHANGEABLE COPY)
B00982898-I1
09/16/2024
Signed off — Alteration
INSTALL NON-ILLUMINATED ADVERTISING SIGN (SIGN A) ON WALL STRUCTURE FILED UNDER SEPARATE APPLICATION # B00982899 (CHANGEABLE COPY)
B00982896-I1
09/16/2024
Signed off — Alteration
ERECT WALL STRUCTURE FOR ADVERTISING SIGNS FILED UNDER SEPARATE APPLICATION NUMBERS B00982896 & B00982898.
B00982899-I1
08/26/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
08/23/2024
Objection resolved — Addressed
08/22/2024
Objection raised — Other
08/13/2024
Filed — Alteration
ADDING SUSPENDED SCAFFOLD LOCATIONS TO THE PLANS.
B00969965-P1
06/28/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
05/30/2024
Permit issued — Sign
B00982898-I1-SG
05/30/2024
Permit issued — Structural
B00982899-I1-ST
05/30/2024
Permit issued — Sign
B00982896-I1-SG
05/02/2024
Permit issued — Sprinklers
B00336641-I1-EW-SP
02/23/2024
Permit issued — Suspended Scaffold
B00969965-I1-SC
01/19/2024
Objection resolved — Addressed
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBROOKLYN CONSTRUCTION GR*01/16/2026
DOB NOWMechanical SystemsPermit IssuedBROOKLYN CONSTRUCTION GR*07/31/2025
DOB NOWSprinklersPermit IssuedMPS PLUMBING & HEATING INC06/11/2025
DOB NOWPlumbingPermit IssuedCOBOT PLUMBING AND HEATIN02/24/2025
DOB NOWGeneral ConstructionPermit IssuedBROOKLYN CONSTRUCTION GR*12/26/2024
DOB NOWMechanical SystemsPermit IssuedBROOKLYN CONSTRUCTION GR*12/20/2024
DOB NOWMechanical SystemsPermit IssuedBROOKLYN CONSTRUCTION GR*12/17/2024
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO05/30/2024
DOB NOWStructuralSigned-offNORTH SHORE NEON SIGN LLC05/30/2024
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO05/30/2024
DOB NOWSprinklersPermit IssuedMPS PLUMBING & HEATING INC05/02/2024
DOB NOWSuspended ScaffoldPermit IssuedPOLTECH WALL SURFACING IN02/23/2024
DOB NOWSidewalk ShedSigned-offDEEP FORMATION INC01/09/2024
DOB NOWSidewalk ShedSigned-offDEEP FORMATION INC11/07/2022
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*01/12/2026
BISEQISSUEDBROOKLYN CONSTRUCTION GR*01/06/2026
BISPLISSUEDCOBOT PLUMBING AND HEATING INC11/05/2025
BISPLISSUEDCOBOT PLUMBING AND HEATING INC03/18/2025
BISEQISSUEDBROOKLYN CONSTRUCTION GR*12/19/2024
BIS—ISSUEDDEEP FORMATION INC09/17/2024
BIS—ISSUEDDEEP FORMATION INC07/16/2024
BISPLISSUEDCOBOT PLUMBING AND HEATING INC03/06/2024
BISEQISSUEDBROOKLYN CONSTRUCTION GR*01/08/2024
BIS—ISSUEDDEEP FORMATION INC09/21/2023
BISEQISSUEDBROOKLYN CONSTRUCTION GR*12/29/2022
BIS—ISSUEDDEEP FORMATION INC12/28/2022
BISPLISSUEDCOBOT PLUMBING AND HEATING INC08/26/2022
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*05/31/2022
BISEQISSUEDBROOKLYN CONSTRUCTION GR*05/31/2022
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*05/31/2022
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*05/31/2022
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*12/27/2021
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*12/27/2021
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*07/02/2021
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*07/02/2021
BISEQISSUEDBROOKLYN CONSTRUCTION GR*03/09/2021
BISEQISSUEDBROOKLYN CONSTRUCTION GR*02/05/2020
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*04/24/2019
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*04/24/2019
BIS—ISSUEDBROOKLYN CONSTRUCTION GR*04/12/2019
+ 4 more permits on file
2 projects · most recent 07/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2025Permit IssuedBROOKLYN CONSTRUCTION GR*Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PLFY-EP36NEMU-E 36,000 BTU · Vrf Indoor ×8
PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×1
PUHY-P144TNU-A 144,000 BTU · Vrf Outdoor ×1
PUHY-P168TNU-A 168,000 BTU · Vrf Outdoor ×1
07/24/2025Permit IssuedBROOKLYN CONSTRUCTION GR*Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PLFY-EP24NEMU-E 24,000 BTU · Vrf Indoor ×2
MXZ-SM60NAMZ 5 tons · Condensing Unit ×1
PKFY-P24NKMU-E2 24,000 BTU · Vrf Indoor ×1
Trane YSC120H3EHA280 10 tons · Rooftop Unit ×2
2 projects · most recent 08/14/2025
FiledStatusContractorScope
08/14/2025CompleteSTAR ELEC'L CONTRACTORS C—
03/27/2025CompleteBASS ELECTRICAL CORP.6 meters, 6 new_meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/16/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/11/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
08/01/2025Public Assembly Emergency Lighting—progress
07/25/2025Mechanical SystemsFrantz Camulairespecial
07/25/2025Energy Code Compliance InspectionsFrantz Camulaireprogress
07/25/2025FinalFrantz Camulaireprogress
07/25/2025Maintenance informationFrantz Camulaireenergy_progress
07/25/2025HVAC insulation and sealing Frantz Camulaireenergy_progress
07/25/2025HVAC and service water heating system controls Frantz Camulaireenergy_progress
07/25/2025HVAC and service water heating equipment Frantz Camulaireenergy_progress
07/21/2025Mechanical SystemsFrantz Camulairespecial
07/21/2025HVAC-R and service water heating system controlsFrantz Camulaireenergy_progress
07/21/2025FinalFrantz Camulaireprogress
07/21/2025Energy Code Compliance InspectionsFrantz Camulaireprogress
07/21/2025HVAC-R and service water piping design and insulationFrantz Camulaireenergy_progress
07/21/2025HVAC-R and service water heating equipmentFrantz Camulaireenergy_progress
11/07/2024Sprinkler SystemsFrantz Camulairespecial
08/26/2024Post-installed AnchorsGeorge Xerakiasspecial
06/28/2024Post-installed AnchorsGeorge Xerakiasspecial
01/08/2024FinalRENEE RAJAPPAprogress
01/03/2024Post-installed AnchorsEUGENE BIFULCOspecial
01/03/2024Structural Steel - DetailsEUGENE BIFULCOspecial
01/03/2024Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
01/03/2024Structural Steel - WeldingEUGENE BIFULCOspecial
01/03/2024FinalRENEE RAJAPPAprogress
12/27/2023FinalRENEE RAJAPPAprogress
04/15/2021Energy Code Compliance InspectionsFrantz Camulaireprogress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
North Brooklyn Community BoathouseOther—
Project B01264984 No Work · Objections · 10/19/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch9
08/28/2026B08031504-I1Request digital key ↗
08/26/2026B00982898-I1Request digital key ↗
08/26/2026B00982899-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/01/2026B00333072-P7Request digital key ↗
09/01/2026B00333072-I1Request digital key ↗
08/15/2026B00333072-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/23/2026B00336641-P1Request digital key ↗
08/23/2026B00336641-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026B01264984-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION21
12/31/2024320593602Open ↗
04/19/2024340910535Open ↗
12/19/2022320593602Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION18
01/10/2024340268098Open ↗
12/28/2023340268098Open ↗
12/29/2022320593602Open ↗
Showing 3 of 18 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/24/2025340910535Open ↗
07/12/2021321904828Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE COMPLIANCE1
08/23/2022320593602Open ↗
▸BISZONING DIAGRAM1
06/04/2021320593602Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
06/09/2015340268098Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026B01259198-I1Open ↗
09/23/2026B01259198-I1Open ↗
09/23/2026B01259198-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026B00982896-I1Open ↗
08/24/2026B00969965-I1Open ↗
08/24/2026B00969965-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01259198-I1Open ↗
09/01/2026B00333072-P1Open ↗
09/01/2026B00336641-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/19/2024340910535Open ↗
11/21/2017340564106Open ↗
06/09/2015340268098Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/21/2017340564106Open ↗
06/09/2015340268098Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/21/2017340564106Open ↗
06/09/2015340268098Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/19/2024340910535Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING4
12/31/2024320593602Open ↗
12/19/2022320593602Open ↗
09/15/2022320593602Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
01/10/2024320593602Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
05/25/2021320593602Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
04/19/2024340910535Open ↗
05/25/2021320593602Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/12/2021321904828Open ↗
▸BISSTREET TREES SITE PLAN1
01/24/2025340910535Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
08/23/2022320593602Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/29/2019320593602Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
06/13/2022320593602Open ↗
06/08/2022320593602Open ↗
07/06/2021320593602Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/23/2022320593602Open ↗
11/23/2021320593602Open ↗
05/26/2021320593602Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/21/2017340564106Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY10
06/14/2022320593602Open ↗
06/14/2022320593602Open ↗
06/14/2022320593602Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
08/02/2022320593602Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/26/2019320593602Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/25/2021320593602Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/26/2019320593602Open ↗
▸BISDEEP FOUNDATIONS / PILES1
08/23/2022320593602Open ↗
▸BISPOST-INSTALLED ANCHORS1
08/23/2022320593602Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE2
05/27/2021320593602Open ↗
05/26/2021320593602Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
07/12/2021321904828Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
07/01/2016320593602Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
07/15/2021321904828Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/18/2021320593602Open ↗
▸Cost, Insurance & Ownership9
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
07/06/2021320593602Open ↗
06/21/2021320593602Open ↗
06/18/2021320593602Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
12/29/2022320593602Open ↗
07/06/2021320593602Open ↗
05/07/2019320593602Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
06/21/2021320593602Open ↗
06/18/2021320593602Open ↗
▸BISCOST AFFIDAVIT1
11/21/2017340564106Open ↗
▸Filing & Intake Forms27
▸BISADDITIONAL INFORMATION17
01/24/2025340910535Open ↗
01/19/2024320593602Open ↗
01/10/2024320593602Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM3
07/06/2021320593602Open ↗
06/21/2021320593602Open ↗
06/18/2021320593602Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
04/19/2024340910535Open ↗
11/21/2017340564106Open ↗
06/09/2015340268098Open ↗
▸BISEFILING COVER SHEET2
01/10/2019321904828Open ↗
11/09/2017320593602Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
11/07/2024340910535Open ↗
07/12/2021321904828Open ↗
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/15/2021321904828Open ↗
07/15/2021321904828Open ↗
05/25/2021320593602Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
11/07/2024340910535Open ↗
04/19/2024340910535Open ↗
▸BISUnknown2
01/20/2026320593602Open ↗
01/20/2026320593602Open ↗
▸DOB NOWCalculations2
08/13/2026B00969965-I1Open ↗
08/13/2026B00969965-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B00969965-P1Open ↗
08/13/2026B00969965-I1Open ↗
▸BISPLOT DIAGRAM1
05/25/2021320593602Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
08/23/2022320593602Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
07/15/2021321904828Open ↗
▸BISSHUTOFF DAMPERS1
06/01/2022320593602Open ↗
▸BISSupporting Document: Fee Deferment1
11/22/2016320593602Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
07/12/2021321904828Open ↗
▸BISLOWEST FLOOR ELEVATION1
08/23/2022320593602Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/12/2021321904828Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/15/2021321904828Open ↗