← Back
Elevator apt, semi-fireproof with stores
437 MORRIS PARK AVENUE
BRONX · BIN 2042465
💬 Discuss this project
1927Year Built
6Stories
D7Building Class
M1-1Zoning
67,018 sfGross Floor Area
75Units
LL97 CoveredRent Stabilized8 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 437 MORRIS PARK LLC · 14,410 sf lot · 4.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 51p · 1 filing · 5 docs
Floor 4
Floor 3
Floor 2
Floor 122p · 2 filings · 20 docs
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO CONTRACTING NY1707/08/2026
PARK EQUITIES3907/08/2026
437 MORRIS PARK2203/22/2026
437 MORRIS PARK LLC KALMA2503/22/2026
TRIERA CONTRACTING103/22/2026
437 MORRIS PK LLC103/22/2026
A&R MANAGMENT CO203/22/2026
F T MANAGEMENT503/22/2026
1101 HOLDINGS LLC103/22/2026
495 WALTON303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRASSO-MENZIUSO ARCHITECTS1107/31/2025
ALNOUR CONSULTING202/13/2025
ASHRAF CORP104/25/2024
NORFAST ENGINEERING PLLC110/22/2021
GREEN DESIGN107/25/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2803/21/2026
LIGHT HOUSE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIERA CONTRACTING INCGeneral Contractor807/08/2026
STREAM CONSTRUCTION INCGeneral Contractor507/08/2026
PRIME PIPING & HEATING INPlumbing407/08/2026
ARSH LANDMARK GENERAL CONGeneral Contractor303/21/2026
MANIANI BUILDERS CORPGeneral Contractor303/21/2026
METRO CONTRACTING NY, INC.General Contractor203/21/2026
MORRIS HELLERElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
ALPHA SCAFFOLDING INCGeneral Contractor107/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
VOLVIE HERMAN CONTRG CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALNOUR CONSULTING ENGINEE607402/13/2025
GRASSO-MENZIUSO ARCHITECT1279207/29/2024
NORFAST ENGINEERING PLLC6655110/22/2021
Building Lifecycle
All (191)Filed (16)Permit Issued (13)Signed Off (3)Violation (60)Inspection (12)Objection (57)Special Inspection (30)
08/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/16/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/28/2026
Violation issued (HPD, open)
B
01/28/2026
Violation issued (HPD, open)
B
01/28/2026
Violation issued (HPD, open)
A
01/28/2026
Violation issued (HPD, open)
A
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, open)
B
01/06/2026
Violation issued (HPD, closed)
A
01/06/2026
Violation issued (HPD, closed)
B
12/31/2025
Violation issued (ECB, closed)
Construction
12/30/2025
Violation issued (ECB, closed)
Elevators
12/12/2025
Violation issued (HPD, closed)
B
12/12/2025
Violation issued (HPD, open)
C
12/12/2025
Violation issued (HPD, closed)
B
12/12/2025
Violation issued (HPD, closed)
B
12/12/2025
Violation issued (HPD, closed)
B
11/17/2025
Violation issued (HPD, open)
C
11/17/2025
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
10/08/2025
Violation issued (HPD, closed)
C
10/08/2025
Violation issued (HPD, closed)
C
08/01/2025
Special inspection requirement — Fenestration air leakage
Nouredine Benabdelhak
08/01/2025
Special inspection requirement — Interior lighting power
Nouredine Benabdelhak
08/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
08/01/2025
Special inspection requirement — Fenestration areas
Nouredine Benabdelhak
08/01/2025
Special inspection requirement — Lighting in dwelling units
Nouredine Benabdelhak
08/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nouredine Benabdelhak
08/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nouredine Benabdelhak
08/01/2025
Special inspection requirement — Lighting controls
Nouredine Benabdelhak
08/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Menziuso
08/01/2025
Special inspection requirement — Maintenance information
Nouredine Benabdelhak
07/31/2025
Filed — Alteration CO
Proposed apartment split into 7 apartments on ground floor. No change to use bulk or egress.
X00969078-P8
07/30/2025
Special inspection requirement — Maintenance information
Nouredine Benabdelhak
07/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nouredine Benabdelhak
07/30/2025
Special inspection requirement — Interior lighting power
Nouredine Benabdelhak
07/30/2025
Special inspection requirement — Fenestration areas
Nouredine Benabdelhak
07/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nouredine Benabdelhak
07/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/30/2025
Special inspection requirement — Lighting controls
Nouredine Benabdelhak
07/30/2025
Special inspection requirement — Lighting in dwelling units
Nouredine Benabdelhak
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
07/30/2025
Special inspection requirement — Fenestration air leakage
Nouredine Benabdelhak
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Other
07/11/2025
Objection raised — Other
07/11/2025
Objection raised — Other
06/25/2025
Filed — Alteration CO
Proposed apartment split into 7 apartments on ground floor. No change to use bulk or egress.
X00969078-P7
06/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/25/2025
Filed — Alteration CO
Proposed apartment split into 7 apartments on ground floor. No change to use bulk or egress.
X00969078-P6
04/23/2025
Special inspection requirement — Fenestration areas
Nouredine Benabdelhak
04/23/2025
Special inspection requirement — Lighting controls
Nouredine Benabdelhak
04/23/2025
Special inspection requirement — Maintenance information
Nouredine Benabdelhak
04/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nouredine Benabdelhak
04/23/2025
Special inspection requirement — Lighting in dwelling units
Nouredine Benabdelhak
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC03/24/2025
DOB NOWStructuralSigned-offSTREAM CONSTRUCTION INC03/11/2025
DOB NOWMechanical SystemsSigned-offSTREAM CONSTRUCTION INC01/13/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN09/10/2024
DOB NOWGeneral ConstructionPermit IssuedSTREAM CONSTRUCTION INC08/09/2024
DOB NOWGeneral ConstructionSigned-offMANIANI BUILDERS CORP06/07/2024
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC06/04/2024
DOB NOWSuspended ScaffoldSigned-offCHK CONSTRUCTION CORP04/29/2024
DOB NOWGeneral ConstructionSigned-offARSH LANDMARK GENERAL CON08/03/2023
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC03/15/2023
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC03/14/2022
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC03/18/2021
DOB NOWSidewalk ShedPermit IssuedMETRO CONTRACTING NY, INC.07/28/2020
BISEQISSUEDMETRO CONTRACTING NY, INC.05/22/2017
BISEQISSUEDMETRO CONTRACTING NY, INC.03/01/2016
BISOTISSUEDACS ENVIRONMENTAL & CONST10/01/2014
BISEQISSUEDACS ENVIRONMENTAL & CONST10/01/2014
BISOTISSUEDACS ENVIRONMENTAL & CONST03/19/2014
BISEQISSUEDACS ENVIRONMENTAL & CONST09/25/2013
BISOTISSUEDACS ENVIRONMENTAL & CONST09/25/2013
BISPLISSUEDSAFETY LICENSED PLBG LLC06/14/2013
BISOTISSUEDALONSO CONTRACTING SERVIC04/22/2013
BISEQISSUEDALONSO CONTRACTING SERVIC04/22/2013
BISOTISSUEDALONSO CONTRACTING SERVIC04/22/2013
BISPLISSUEDFIRST CHOICE PLUMBING COR06/23/2010
BISOTISSUEDDESANTIS CONSTRUCTION COR12/16/2008
BISEQISSUEDALONSO CONSULTING SERVICES05/01/2007
BISOTISSUEDALONSO CONSULTING SERVICES05/17/2006
BISFBISSUEDG. BAUER INC.08/20/2003
BISFPISSUEDFIRE FOE SYSTEMS CORP06/12/2003
BISOTISSUEDCK PRO GLASS, CORP.03/18/2003
BISPLISSUEDC.R.U. MECHAN & HEAT INC09/27/2002
BISMHISSUEDC.K. PROGLASS09/10/2002
BISEQISSUEDC.K. PROGLASS09/10/2002
BISFBISSUEDNEAL M. RUDIKOFF08/19/1999
BISOTISSUEDEMPIRE INDUSTRIAL07/09/1999
BISPLISSUEDTMS PLMBG & HTG CORP07/09/1999
1 project · most recent 07/31/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/31/2025Signed-offSTREAM CONSTRUCTION INCVentilation Systems
Ventilation
Aldes CSR II supply damper 40 CFM ×28
1 project · most recent 07/31/2025
Water/Sanitary
FiledStatusContractorScope
07/31/2025Signed-offPRIME PIPING & HEATING INWater/Sanitary
4 projects · most recent 07/23/2024
General Wiring
FiledStatusContractorScope
07/23/2024CompleteROMCON ELECTRIC, INCGeneral Wiring
05/07/2024Permit IssuedRICHARD NEU—
03/12/2024Permit IssuedRICHARD NEU—
12/20/2018CompleteVOLVIE HERMAN CONTRG CORP—
1 project · most recent 07/25/2020
Sidewalk Shed
FiledStatusContractorScope
07/25/2020Permit IssuedALPHA SCAFFOLDING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/16/2026Fail-Final CND-Occupancy InspectionFailView ↗
06/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
08/01/2025Fire-Resistance Rated ConstructionNouredine Benabdelhakprogress
08/01/2025Interior lighting powerNouredine Benabdelhakenergy_progress
08/01/2025Lighting controlsNouredine Benabdelhakenergy_progress
08/01/2025Lighting in dwelling unitsNouredine Benabdelhakenergy_progress
08/01/2025Fenestration and door U-factor and product ratingsNouredine Benabdelhakenergy_progress
08/01/2025Fenestration air leakageNouredine Benabdelhakenergy_progress
08/01/2025Fenestration areasNouredine Benabdelhakenergy_progress
08/01/2025Maintenance informationNouredine Benabdelhakenergy_progress
08/01/2025Tenant Protection Plan ComplianceChristopher Menziusospecial
08/01/2025Energy Code Compliance InspectionsNouredine Benabdelhakprogress
07/30/2025Energy Code Compliance InspectionsNouredine Benabdelhakprogress
07/30/2025Lighting in dwelling unitsNouredine Benabdelhakenergy_progress
07/30/2025Interior lighting powerNouredine Benabdelhakenergy_progress
07/30/2025Maintenance informationNouredine Benabdelhakenergy_progress
07/30/2025Fenestration areasNouredine Benabdelhakenergy_progress
07/30/2025Lighting controlsNouredine Benabdelhakenergy_progress
07/30/2025Fenestration air leakageNouredine Benabdelhakenergy_progress
07/30/2025Fenestration and door U-factor and product ratingsNouredine Benabdelhakenergy_progress
07/30/2025Fire-Resistance Rated ConstructionNouredine Benabdelhakprogress
07/30/2025Tenant Protection Plan Compliance—special
04/23/2025Lighting in dwelling unitsNouredine Benabdelhakenergy_progress
04/23/2025Tenant Protection Plan Compliance—special
04/23/2025Energy Code Compliance InspectionsNouredine Benabdelhakprogress
04/23/2025Fire-Resistance Rated ConstructionNouredine Benabdelhakprogress
04/23/2025Interior lighting powerNouredine Benabdelhakenergy_progress
Latest 25 of 63.
▾Documents — 194 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
08/25/2026X00578546-I1Request digital key ↗
08/21/2026X01039435-I1Request digital key ↗
08/21/2026X00969078-P8Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00375714-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION12
10/17/2025200584821Open ↗
10/17/2025200584821Open ↗
09/05/2025220285313Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION12
03/01/2016240133565Open ↗
10/02/2014220285313Open ↗
10/02/2014220285313Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications93
▸DOB NOWProgress Inspector Seal & Signature51
09/24/2026X00969078-S2Open ↗
09/01/2026X00969078-S2Open ↗
09/01/2026X00969078-S2Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/21/2026X01039435-I1Open ↗
08/21/2026X00969078-P8Open ↗
08/21/2026X00969078-P7Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
09/11/2017240133565Open ↗
09/11/2017240133565Open ↗
10/02/2014220364326Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X00969078-S2Open ↗
09/01/2026X00969078-S2Open ↗
08/28/2026X00969078-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/20/2014220364326Open ↗
04/20/2013220285313Open ↗
04/20/2013220285304Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
04/20/2013220285313Open ↗
04/20/2013220285304Open ↗
12/10/2008210082676Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/28/2016240133565Open ↗
03/20/2014220364326Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/28/2016240133565Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/28/2016240133565Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING5
07/03/2013220285304Open ↗
04/20/2013220285304Open ↗
11/06/2008210073454Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
07/13/2013220285304Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
02/28/2016240133565Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00375714-I1Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/20/2014220364326Open ↗
04/20/2013220285313Open ↗
04/20/2013220285304Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026X01136505-I1Open ↗
08/20/2026X01157550-I1Open ↗
08/13/2026X01157550-P1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/21/2026X00969078-S2Open ↗
08/21/2026X00969078-S1Open ↗
08/15/2026X00969078-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/10/2008210082676Open ↗
10/20/2008210073454Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/28/2016240133565Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/11/2017240133565Open ↗
10/02/2014220364326Open ↗
08/14/2013220285304Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/11/2017240133565Open ↗
06/15/2017240133565Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/10/2008210082676Open ↗
10/17/2008210073454Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
10/02/2014220364326Open ↗
03/20/2014220364326Open ↗
08/14/2013220285304Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
03/20/2014220364326Open ↗
04/20/2013220285313Open ↗
04/20/2013220285304Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/28/2016240133565Open ↗
▸BISBOROUGH INTAKE FORM1
09/11/2017240133565Open ↗
▸Other Documents21
▸DOB NOWDHCR Document12
08/20/2026X01157550-I1Open ↗
08/15/2026X00969078-I1Open ↗
08/13/2026X00969078-P6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProperty Ownership Certification7
08/21/2026X00969078-P6Open ↗
08/21/2026X00969078-P8Open ↗
08/21/2026X00969078-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026X01039435-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01039435-I1Open ↗