437 SACKETT STREET
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 8 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 6 docs
Cellar4p · 3 filings · 20 docs
Basement3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING403/22/2026
437 SACKETT403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/20/2023$2.0M—Private party → 437 SACKETT LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.1209/19/2024
AKM RAHMAN202/01/2024
JIAN ENGINEERING PLLC408/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
SD DESIGN STUDIO3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRL SKYLINE INCGeneral Contractor907/08/2026
TOPLINE NYC INCGeneral Contractor407/08/2026
MEGA GENERAL CONSTRUCTIONGeneral Contractor303/21/2026
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
CONSTRUCTION MNGT. AA,LLCGeneral Contractor107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56131409/19/2024
Building Lifecycle
All (142)Filed (18)Permit Issued (12)Signed Off (9)Inspection (5)Objection (68)Special Inspection (30)
11/01/2024
Signed off — Alteration
PROPOSED MECHANICAL WORK ON CELLAR, BASEMENT, 1ST TO 2ND FLOOR, & STAIR BULKHEAD ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B00865279 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00865279-S1
09/25/2024
Signed off — Alteration
PROPOSED MECHANICAL WORK ON CELLAR, BASEMENT, 1ST TO 2ND FLOOR, & STAIR BULKHEAD ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B00865279 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00865279-I1
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
09/24/2024
Special inspection requirement — Maintenance information
Fran Huang
09/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
09/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
09/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
09/19/2024
Filed — Alteration
PROPOSED MECHANICAL WORK ON CELLAR, BASEMENT, 1ST TO 2ND FLOOR, & STAIR BULKHEAD ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B00865279 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00865279-P6
09/19/2024
Signed off — Alteration
A PROPOSED FOUNDATION CONSTRUCTION FILING IN CONJUNCTION WITH JOB #: B00865279-I1.
B00916351-I1
09/19/2024
Signed off — Alteration
A PROPOSED STRUCTURAL CONSTRUCTION FILING IN CONJUNCTION WITH GENERAL CONSTRUCTION JOB #: B00865279-I1.
B00916356-I1
09/18/2024
Signed off — Alteration
A PROPOSED SOE CONSTRUCTION IN CONJUNCTION WITH FILING JOB #: B00916357-I1.
B00916357-I1
09/18/2024
Signed off — Alteration
PROPOSED MECHANICAL WORK ON CELLAR, BASEMENT, 1ST TO 2ND FLOOR, & STAIR BULKHEAD ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B00865279 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00865279-S4
09/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
09/16/2024
Special inspection requirement — Maintenance information
Fran Huang
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
09/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
09/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
09/03/2024
Special inspection requirement — Maintenance information
Fran Huang
09/03/2024
Special inspection requirement — Final
Fran Huang
09/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
09/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
09/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
09/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/03/2024
Special inspection requirement — Mechanical Systems
Fran Huang
09/03/2024
Special inspection requirement — Heating Systems
Fran Huang
09/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
08/30/2024
Signed off — Alteration
PROPOSED MECHANICAL WORK ON CELLAR, BASEMENT, 1ST TO 2ND FLOOR, & STAIR BULKHEAD ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B00865279 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00865279-S3
08/28/2024
Filed — Alteration
PROPOSED MECHANICAL WORK ON CELLAR, BASEMENT, 1ST TO 2ND FLOOR, & STAIR BULKHEAD ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B00865279 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00865279-P3
08/23/2024
Objection resolved — Addressed
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/23/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Fran Huang
08/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
08/23/2024
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
08/23/2024
Special inspection requirement — Permanent certificate
Fran Huang
08/23/2024
Special inspection requirement — Fenestration areas
Fran Huang
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/15/2024
Objection raised — Scope
08/15/2024
Objection resolved — Addressed
08/15/2024
Objection raised — Zoning
08/15/2024
Objection raised — Zoning
08/15/2024
Objection raised — Admin
08/09/2024
Filed — Alteration
PROPOSED MECHANICAL WORK ON CELLAR, BASEMENT, 1ST TO 2ND FLOOR, & STAIR BULKHEAD ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B00865279 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00865279-P5
08/08/2024
Filed — Alteration
PROPOSED MECHANICAL WORK ON CELLAR, BASEMENT, 1ST TO 2ND FLOOR, & STAIR BULKHEAD ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B00865279 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00865279-P4
07/16/2024
Permit issued — General Construction
B00865279-I1-GC
07/12/2024
Permit issued — General Construction
B00865279-I1-GC
06/25/2024
Permit issued — Mechanical Systems
B00865279-S4-MS
06/14/2024
Objection resolved — Addressed
06/14/2024
Objection resolved — Addressed
06/05/2024
Objection resolved — Addressed
06/03/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00936346-I1
06/03/2024
Signed off — Alteration
B00998498-I1
05/30/2024
Objection raised — Plumbing
05/30/2024
Objection raised — Zoning
05/30/2024
Objection raised — Zoning
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMEGA GENERAL CONSTRUCTION07/16/2024
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION MNGT. AA,LLC07/12/2024
DOB NOWMechanical SystemsSigned-offJRL SKYLINE06/25/2024
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC INC02/02/2024
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC01/25/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC12/18/2023
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING09/21/2023
DOB NOWStructuralSigned-offJRL SKYLINE08/25/2023
DOB NOWSupport of ExcavationSigned-offJRL SKYLINE08/22/2023
DOB NOWFoundationSigned-offJRL SKYLINE08/17/2023
DOB NOWConstruction FenceSigned-offJRL SKYLINE08/15/2023
DOB NOWGeneral ConstructionSigned-offJRL SKYLINE06/28/2023
3 projects · most recent 03/04/2024
General Wiring
FiledStatusContractorScope
03/04/2024CompleteCL ELECTRICAL CORPGeneral Wiring
01/06/2024CompleteCL ELECTRICAL CORP—
09/23/2023CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
09/24/2024Fire-Resistant Penetrations and JointsFran Huangspecial
09/24/2024HVAC-R and service water heating equipmentFran Huangenergy_progress
09/24/2024HVAC-R and service water piping design and insulationFran Huangenergy_progress
09/24/2024Maintenance informationFran Huangenergy_progress
09/24/2024HVAC-R and service water heating system controlsFran Huangenergy_progress
09/24/2024Energy Code Compliance InspectionsFran Huangprogress
09/16/2024HVAC-R and service water piping design and insulationFran Huangenergy_progress
09/16/2024HVAC-R and service water heating system controlsFran Huangenergy_progress
09/16/2024Fire-Resistant Penetrations and JointsFran Huangspecial
09/16/2024Energy Code Compliance InspectionsFran Huangprogress
09/16/2024Maintenance informationFran Huangenergy_progress
09/16/2024HVAC-R and service water heating equipmentFran Huangenergy_progress
09/03/2024Fire-Resistant Penetrations and JointsFran Huangspecial
09/03/2024Structural Stability – Alterations of existing buildingsFran Huangspecial
09/03/2024FinalFran Huangprogress
09/03/2024Energy Code Compliance InspectionsFran Huangprogress
09/03/2024Maintenance informationFran Huangenergy_progress
09/03/2024HVAC-R and service water heating system controlsFran Huangenergy_progress
09/03/2024HVAC-R and service water heating equipmentFran Huangenergy_progress
09/03/2024HVAC-R and service water piping design and insulationFran Huangenergy_progress
09/03/2024Mechanical SystemsFran Huangspecial
09/03/2024Heating SystemsFran Huangspecial
08/23/2024Fire-Resistance Rated ConstructionFran Huangprogress
08/23/2024Permanent certificateFran Huangenergy_progress
08/23/2024Fenestration areasFran Huangenergy_progress
Latest 25 of 120.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/27/2026B00865279-P4Request digital key ↗
08/27/2026B00865279-S3Request digital key ↗
08/27/2026B00865279-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits4
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
06/20/2024322114582Open ↗
06/20/2024322114582Open ↗
06/20/2024322114582Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/17/2024322114582Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00865279-P4Open ↗
08/13/2026B00865279-P1Open ↗
08/13/2026B00865279-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00898967-I1Open ↗
08/13/2026B00865279-P1Open ↗
08/13/2026B00865279-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B00865279-P4Open ↗
08/13/2026B00865279-I1Open ↗
08/13/2026B00865279-P2Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/20/2024322114582Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature21
08/28/2026B00916351-I1Open ↗
08/23/2026B00882280-I1Open ↗
08/23/2026B00882280-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/27/2026B00865279-P3Open ↗
08/27/2026B00865279-S3Open ↗
08/27/2026B00865279-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/28/2026B00916351-I1Open ↗
08/28/2026B00916351-I1Open ↗
08/23/2026B00882280-I1Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00865279-P1Open ↗
08/13/2026B00865279-P2Open ↗
08/13/2026B00865279-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/27/2026B00865279-S1Open ↗
08/27/2026B00865279-P1Open ↗
08/27/2026B00865279-P2Open ↗
Showing 3 of 15 on file for this type
▸Inspections & Test Reports7
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026B00898967-I1Open ↗
08/13/2026B00916357-I1Open ↗
08/13/2026B00916351-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00916351-I1Open ↗
08/13/2026B00898967-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00898967-I1Open ↗
08/13/2026B00916351-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/17/2024322114582Open ↗
▸Other Documents18
▸DOB NOWPlot Diagram7
08/13/2026B00916351-I1Open ↗
08/13/2026B00916357-I1Open ↗
08/13/2026B00865279-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026B00898967-I1Open ↗
08/13/2026B00865279-P2Open ↗
08/13/2026B00865279-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00865279-I1Open ↗
08/13/2026B00865279-P2Open ↗
08/13/2026B00865279-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00916357-I1Open ↗