← Back
Walk-up cooperative
438 3 STREET
BROOKLYN · BIN 3021121
💬 Discuss this project
1921Year Built
4Stories
C6Building Class
R6BZoning
7,200 sfGross Floor Area
4Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Walk-up cooperative · 2,280 sf lot · 3.16 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN H HATHEWAY JR., ARCHITECT305/30/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHINE CONSTRUCTION CORPGeneral Contractor203/21/2026
KATAN P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOHN H HATHEWAY JR., ARCH4175305/30/2023
Building Lifecycle
All (35)Filed (3)Permit Issued (2)Signed Off (2)Violation (14)Inspection (4)Objection (6)Special Inspection (4)
04/30/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
06/11/2024
Signed off — Alteration
Reconfigure kitchen layout at Apartment 2. Minor partition alterations. No change to Occupancy, Egress, & Use.
B00604545-S1
06/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/01/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/28/2023
Signed off — Alteration
Reconfigure kitchen layout at Apartment 2. Minor partition alterations. No change to Occupancy, Egress, & Use.
B00604545-I1
08/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Hatheway
05/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
John Hatheway
05/30/2023
Filed — Alteration
Reconfigure kitchen layout at Apartment 2. Minor partition alterations. No change to Occupancy, Egress, & Use.
B00604545-P1
05/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Hatheway
05/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
John Hatheway
05/18/2023
Permit issued — Plumbing
B00604545-S1-PL
05/03/2023
Permit issued — General Construction
B00604545-I1-GC
11/09/2022
Violation issued (HPD, closed)
I
03/08/2022
Objection raised — Admin
03/08/2022
Objection resolved — Addressed
03/08/2022
Objection raised — Scope
03/08/2022
Objection resolved — Addressed
03/04/2022
Filed — Alteration
Reconfigure kitchen layout at Apartment 2. Minor partition alterations. No change to Occupancy, Egress, & Use.
B00604545-S1
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
01/15/2022
Objection raised — Scope
01/15/2022
Objection resolved — Addressed
01/13/2022
Filed — Alteration
Reconfigure kitchen layout at Apartment 2. Minor partition alterations. No change to Occupancy, Egress, & Use.
B00604545-I1
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKATAN P & H INC05/18/2023
DOB NOWGeneral ConstructionSigned-offSHINE CONSTRUCTION CORP05/03/2023
BISMHISSUEDAIELLO & SONS A/C CO INC08/03/2005
2 projects · most recent 02/18/2025
General Wiring
FiledStatusContractorScope
02/18/2025CompleteOLLIS ELECTRIC INCGeneral Wiring
05/11/2023CompleteFOSTER ELEC'L SVC., INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/31/2023Fire-Resistant Penetrations and JointsJohn Hathewayspecial
05/31/2023HVAC-R and service water piping design and insulationJohn Hathewayenergy_progress
05/26/2023Fire-Resistant Penetrations and JointsJohn Hathewayspecial
05/26/2023HVAC-R and service water piping design and insulationJohn Hathewayenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00604545-P1Request digital key ↗
08/14/2026B00604545-S1Request digital key ↗
08/14/2026B00604545-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00604545-I1Open ↗
08/31/2026B00604545-S1Open ↗
08/31/2026B00604545-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B00604545-P1Open ↗
08/24/2026B00604545-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00604545-P1Open ↗
08/24/2026B00604545-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00604545-P1Open ↗
08/14/2026B00604545-S1Open ↗
08/14/2026B00604545-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/14/2026B00604545-S1Open ↗
08/14/2026B00604545-I1Open ↗