← Back
Public elementary, junior or senior high
Northside Charter High School
438 LEONARD STREET · BIN 3067788
💬 Discuss this project
1966Year Built
4Stories
W1Building Class
M1-2/R6Zoning
149,046 sfGross Floor Area
1Units
LL97 Covered
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 131,700 sf lot · 1.13 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 4Under Construction17p · 2 filings · 20 docs
Floor 3Under Construction21p · 2 filings · 20 docs
Floor 2Under Construction18p · 2 filings · 20 docs
Floor 1Under Construction18p · 2 filings · 20 docs
CellarUnder Construction19p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/19/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/19/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/07/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/21/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/21/2026Structural Stability – Alterations of existing buildings—special
08/18/2026HVAC-R and service water heating equipment—energy_progress
08/18/2026HVAC-R and service water heating system controls—energy_progress
08/18/2026Heating Systems—special
08/18/2026HVAC-R and service water piping design and insulation—energy_progress
08/18/2026Post-installed Anchors—special
08/18/2026Maintenance information—energy_progress
08/18/2026Fire-Resistant Penetrations and Joints—special
08/12/2026Mechanical Systems—special
08/12/2026Final—progress
11/21/2025Mechanical Systems—special
11/21/2025Final—progress
02/27/2025FinalMIKHAIL ZEYGMANprogress
02/27/2025Subgrade InspectionsMIKHAIL ZEYGMANspecial
02/27/2025Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
02/05/2025Excavations - Sheeting, Shoring, and Bracing—special
03/08/2024Post-installed AnchorsMIKHAIL ZEYGMANspecial
03/08/2024Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
03/04/2024FinalMIKHAIL ZEYGMANprogress
11/16/2022Fire-Resistant Penetrations and JointsNoel Tolentinospecial
11/07/2022Fire-Resistant Penetrations and JointsNoel Tolentinospecial
04/04/2022FinalMichael Marcheseprogress
04/04/2022Mechanical SystemsNoel Tolentinospecial
Nothing on file for this building.