← Back
BuildNYC
Predominantly retail with other uses
439 86TH STREET
BROOKLYN · Bay Ridge · BIN 3153184
💬 Discuss this project
1922Year Built
3Stories
K4Building Class
C4-2AZoning
24,155 sfGross Floor Area
5Units
0 Active ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 429-441 86th Street · 10,600 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSephora14p · 6 filings · 20 docs
Floor 5Planet Fitness, Aldo6p · 11 filings · 20 docs
Floor 4Planet Fitness, Aldo6p · 11 filings · 20 docs
Floor 3Planet Fitness, Aldo22p · 14 filings · 20 docs
Floor 2Planet Fitness, Aldo22p · 14 filings · 20 docs
Floor 1Sephora, Planet Fitness +145p · 24 filings · 20 docs
CellarSephora13p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
429-441 86 St7803/21/2026
Order Building803/21/2026
429-411 86th Street503/21/2026
Sholom & Zuckerbrot Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY AC204/10/2024
Don Penn Consulting Engineering412/03/2021
Poly Engineer308/24/2021
Jose L. Pena, P.E1107/06/2021
Daniel K. Mullin, Architect105/27/2021
FBJ Technical Services211/04/2020
M-Engineering New York307/29/2020
IW Architecture103/04/2020
EP Engineering101/13/2020
The Eipel Engineering Group112/04/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar2203/21/2026
Joanna Karagiannis503/21/2026
K A Interior Design203/21/2026
Meridian Code Consultants803/21/2026
Mary McKeown503/21/2026
New York Sign Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Active SignsSign hanger1008/26/2026
Paul M MaintenanceGeneral Contractor503/22/2026
Done Rite ConstructionGeneral Contractor407/08/2026
Bing ConstructionGeneral Contractor303/21/2026
CK Cooling & Heatingspecialty_contractor203/21/2026
Steadfast Development andGeneral Contractor107/08/2026
York Interiors GroupGeneral Contractor104/09/2026
JKT ConstructionScaffold104/09/2026
Mauceri Sign CoSign hanger107/08/2026
National MaintenanceSign hanger107/08/2026
Mes ConstructionPlumbing107/08/2026
Skinner Plumbing & HeatingFire Protection107/08/2026
Skinner Plumbing & HeatingPlumbing107/08/2026
Amsterdam ElectricElectrical103/22/2026
Tri State Plumbing & HeatingPlumbing107/08/2026
Triple Crown Electrical ContngElectrical103/21/2026
CKC Contracting Corp DbaElectrical103/22/2026
Amsterdam ElectricElectrical103/21/2026
JKT ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Winton Group Architecture4343104/10/2024
HRF Services5616512/03/2021
Poly Engineer6110308/24/2021
Doka Engineering1158211/04/2020
Quality Testing7344103/06/2020
EP Inspections and Commis7079101/13/2020
The Eipel Engineering Group2714212/04/2019
Building Lifecycle
All (162)Filed (29)Permit Issued (24)Signed Off (22)Violation (60)Inspection (6)Objection (12)Special Inspection (9)
03/06/2026
Signed off — Alteration
B01028792-I1
03/04/2026
Violation issued (FDNY_NOV, closed)
02/07/2026
Signed off — Alteration
B00283968-I1
07/16/2025
Violation issued (FDNY_ORDER, closed)
05/07/2024
Permit issued — General Construction
B01028792-I1-GC
04/10/2024
Filed — Alteration
B01028792-I1
04/09/2024
Signed off — Alteration
Install 26 new sprinkler heads in retail store occupied by SEPHORA. Filed in conjunction with build out DOB job number 322017330. No change in egress, use or occupancy.
B00378550-I1
03/28/2024
Signed off — Alteration
B00259021-I1
08/04/2022
Signed off — Alteration
B00513756-I1
03/24/2022
Signed off — Alteration
B00522170-I1
03/10/2022
Signed off — Alteration
B00570206-I1
03/10/2022
Signed off — Alteration
B00570212-I1
02/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2022
Permit issued — Plumbing
B00570212-I1-PL
01/10/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/07/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/05/2022
Permit issued — Mechanical Systems
B00570206-I1-MS
12/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/03/2021
Filed — Alteration
B00522172-P2
11/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/10/2021
Violation issued (ECB, closed)
Construction
10/13/2021
Objection resolved — Addressed
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection resolved — Addressed
09/21/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/08/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/26/2021
Objection raised — Admin
08/26/2021
Objection raised — Mechanical
08/26/2021
Objection raised — Mechanical
08/26/2021
Objection raised — Fire_Protection
08/26/2021
Objection raised — Scope
08/26/2021
Objection raised — Scope
08/25/2021
Filed — Alteration
B00522172-P1
08/24/2021
Filed — Alteration
B00570206-I1
08/24/2021
Filed — Alteration
B00570212-I1
08/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
De Gao
08/04/2021
Special inspection requirement — Energy Code Compliance Inspections
De Gao
07/29/2021
Signed off — Alteration
B00536829-I1
07/29/2021
Signed off — Alteration
ILLUMINATED NON ADVERTISING DOUBLE-FACED PROJECTING ACCESSORY SIGN - PLANET FITNESS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00536833-I1
07/29/2021
Signed off — Alteration
B00536824-I1
07/29/2021
Signed off — Alteration
B00536834-I1
07/29/2021
Signed off — Alteration
B00536828-I1
07/29/2021
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - PLANET. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00536825-I1
07/29/2021
Signed off — Alteration
B00536827-I1
07/29/2021
Signed off — Alteration
ILLUMINATED NON ADVERTISING DOUBLE-FACED PROJECTING ACCESSORY SIGN - PLANET FITNESS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00536831-I1
07/29/2021
Signed off — Alteration
B00536830-I1
07/29/2021
Signed off — Alteration
B00536826-I1
07/12/2021
Permit issued — Sign
B00536824-I1-SG
07/12/2021
Permit issued — Sign
B00536828-I1-SG
07/12/2021
Permit issued — Sign
B00536830-I1-SG
07/12/2021
Permit issued — Sign
B00536825-I1-SG
07/12/2021
Permit issued — Sign
B00536827-I1-SG
07/12/2021
Permit issued — Sign
B00536831-I1-SG
07/12/2021
Permit issued — Sign
B00536826-I1-SG
07/09/2021
Permit issued — Sign
B00536829-I1-SG
07/07/2021
Permit issued — Sign
B00536833-I1-SG
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offYork Interiors Group05/07/2024
DOB NOWPlumbingSigned-offDW Plumbing01/14/2022
DOB NOWMechanical SystemsSigned-offCK Cooling Heating01/05/2022
DOB NOWSignSigned-offActive Signs07/12/2021
DOB NOWSignSigned-offActive Signs07/12/2021
DOB NOWSignSigned-offActive Signs07/12/2021
DOB NOWSignSigned-offActive Signs07/12/2021
DOB NOWSignSigned-offActive Signs07/12/2021
DOB NOWSignSigned-offActive Signs07/12/2021
DOB NOWSignSigned-offActive Signs07/12/2021
DOB NOWSignSigned-offActive Signs07/09/2021
DOB NOWSignSigned-offActive Signs07/07/2021
DOB NOWSignSigned-offActive Signs07/07/2021
DOB NOWPlumbingPermit IssuedMes Construction06/24/2021
DOB NOWMechanical SystemsSigned-offDone Rite Construction06/07/2021
DOB NOWGeneral ConstructionSigned-offDone Rite Construction06/04/2021
DOB NOWMechanical SystemsSigned-offBing Construction05/25/2021
DOB NOWMechanical SystemsPermit IssuedSteadfast Development and09/10/2020
DOB NOWSprinklersSigned-offSkinner Plumbing & Heating08/10/2020
DOB NOWPlumbingSigned-offSkinner Plumbing & Heating03/09/2020
DOB NOWSignSigned-offMauceri Sign Co03/04/2020
DOB NOWConstruction FenceSigned-offJKT Construction12/20/2019
DOB NOWStructuralSigned-offJKT Construction12/13/2019
DOB NOWSignSigned-offNational Maintenance04/01/2019
BISOTISSUEDJKT Construction03/27/2020
BISPLISSUEDEH Plumbing & Heating05/09/2018
BISPLISSUEDEH Plumbing & Heating04/11/2018
BISPLISSUEDEH Plumbing & Heating04/11/2018
BISMHISSUEDAllied Construction and D11/03/2017
BIS—ISSUEDPaul M Maintenance07/28/2017
BISMHISSUEDAllied Construction and D04/21/2017
BIS—ISSUEDPaul M Maintenance03/17/2017
BISPLISSUEDPlumbing P & H03/06/2017
BISOTISSUEDGo Green Construction04/20/2016
BISOTISSUEDGo Green Construction04/20/2016
BISEQISSUEDPowers Bridging & Scaffolding10/23/2015
BISEQISSUEDPowers Bridging & Scaffolding08/28/2015
BISSPISSUEDMetro Fire Protection04/16/2014
BISPLISSUEDGeorge Breslaw Plumbing09/15/2010
BISOTISSUEDNational Maintenance09/10/2009
+ 34 more permits on file
16 projects · most recent 03/11/2025
General Wiring Lighting
FiledStatusContractorScope
03/11/2025CompleteTriple Crown Electrical ContngGeneral Wiring
11/19/2024CompleteAmsterdam ElectricGeneral Wiring
08/31/2022CompleteSmart Line Electric—
07/19/2022CompleteNova ElectricGeneral Wiring
10/22/2021CompleteRainbow Electric Co—
08/19/2021CompleteRainbow Electric Co—
08/19/2021CompleteRainbow Electric Co—
08/19/2021CompleteRainbow Electric Co—
08/19/2021CompleteRainbow Electric Co—
08/19/2021CompleteRainbow Electric Co—
08/19/2021CompleteRainbow Electric Co—
06/21/2021Permit IssuedBLZ ElectricGeneral Wiring
06/19/2020Permit IssuedJanon ElectricGeneral Wiring
03/19/2020CompleteCKC Contracting Corp Dba—
03/16/2020CompleteM.C. Electrical NYGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/07/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/21/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/08/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/04/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/22/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/04/2021Fire-Resistant Penetrations and JointsDe Gaospecial
08/04/2021Energy Code Compliance InspectionsDe Gaoprogress
07/01/2021FinalJose Penaprogress
07/01/2021FinalJose Penaprogress
07/01/2021FinalJose Penaprogress
11/12/2020Sprinkler SystemsLeonid Kuzminspecial
11/03/2020Sprinkler SystemsLeonid Kuzminspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SephoraRetailCellar, Floor 1, Roof
Project B00570206 Alteration · LOC Issued · 08/24/2021
Project B00570212 Alteration · LOC Issued · 08/24/2021
Project B00378550 Alteration · LOC Issued · 08/03/2020
Project B00292500 Alteration · Permit Entire · 03/06/2020
Project B00305989 Alteration · LOC Issued · 03/04/2020
Project B00285181 Alteration · LOC Issued · 01/08/2020
Planet FitnessFitness / RecreationFloors 1–5
Project B00536829 Alteration · LOC Issued · 07/06/2021
Project B00536824 Alteration · LOC Issued · 07/02/2021
Project B00536825 Alteration · LOC Issued · 07/02/2021
Project B00536826 Alteration · LOC Issued · 07/02/2021
Project B00536827 Alteration · LOC Issued · 07/02/2021
Project B00536828 Alteration · LOC Issued · 07/02/2021
Project B00536830 Alteration · LOC Issued · 07/02/2021
Project B00536831 Alteration · LOC Issued · 07/02/2021
Project B00536833 Alteration · LOC Issued · 07/02/2021
Project B00536834 Alteration · LOC Issued · 07/02/2021
AldoRetailFloors 1–5
Project B00127035 Alteration · LOC Issued · 03/25/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 550 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch18
09/01/2026B00522170-I1Request digital key ↗
09/01/2026B00513756-I1Request digital key ↗
09/01/2026B00536830-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026B00293177-I1Request digital key ↗
09/02/2026B00378550-I1Request digital key ↗
08/15/2026B00378550-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00292500-I1Request digital key ↗
09/01/2026B00476581-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00285181-I1Request digital key ↗
08/15/2026B00285181-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/02/2026B00127035-I1Request digital key ↗
09/02/2026B00305989-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00259021-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00283968-I1Request digital key ↗
▸Applications & Permits102
▸BISPLAN / WORK APPROVAL APPLICATION56
12/03/2024302332964Open ↗
12/02/2024302332964Open ↗
07/01/2024321995677Open ↗
Showing 3 of 56 on file for this type
▸BISWORK PERMIT APPLICATION31
12/13/2019322018044Open ↗
12/12/2019322017330Open ↗
05/13/2019321953007Open ↗
Showing 3 of 31 on file for this type
▸BISPLACE OF ASSEMBLY9
05/11/2023321095097Open ↗
05/11/2023321095097Open ↗
06/06/2022321095097Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
02/19/2021321095097Open ↗
10/19/2020321095097Open ↗
Showing 2 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/12/2019322017330Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
02/13/2026302332964Open ↗
▸Seals & Professional Certifications143
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION66
12/17/2019322018044Open ↗
12/12/2019322017330Open ↗
12/12/2019322017330Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/02/2026B00127035-I1Open ↗
09/01/2026B00476581-I1Open ↗
09/01/2026B00522170-I1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
12/17/2019322018044Open ↗
12/12/2019322017330Open ↗
04/09/2019321953007Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
12/17/2019322018044Open ↗
12/17/2019322018044Open ↗
12/12/2019322017330Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPC FULL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B00570212-I1Open ↗
08/28/2026B00378550-I1Open ↗
08/27/2026B00522172-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B00536833-I1Open ↗
08/28/2026B00570212-I1Open ↗
08/25/2026B00536831-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment38
▸BISEQUIPMENT USE APPLICATION/PERMIT9
02/16/2022310041594Open ↗
03/12/2019301945260Open ↗
06/15/2018321540490Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS9
02/16/2022310041594Open ↗
03/12/2019301945260Open ↗
03/12/2019301945260Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
07/08/2019302332964Open ↗
06/07/2019302332964Open ↗
05/16/2019321953007Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
04/12/2018302332964Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos41
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
09/02/2026B00127035-I1Open ↗
09/01/2026B00522170-I1Open ↗
09/01/2026B00513756-I1Open ↗
Showing 3 of 27 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/12/2019322017330Open ↗
04/09/2019321953007Open ↗
Showing 2 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
12/17/2019322018044Open ↗
04/04/2018321250819Open ↗
04/04/2018321250819Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/23/2022322018044Open ↗
04/04/2018321250819Open ↗
Showing 2 of 3 on file for this type
▸BISEMERGENCY LIGHTING - PA1
02/19/2021321095097Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/30/2020322017330Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/23/2022322018044Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00570206-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY8
03/23/2022322018044Open ↗
02/11/2022310041594Open ↗
02/11/2022310041594Open ↗
Showing 3 of 8 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/21/2018302332964Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
02/11/2022310041594Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs66
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
03/24/2022322018044Open ↗
03/11/2022310041594Open ↗
06/17/2021321095097Open ↗
Showing 3 of 37 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
02/19/2021321095097Open ↗
02/19/2021321095097Open ↗
07/30/2020302332964Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
12/19/2022302332964Open ↗
Showing 1 of 3 on file for this type
▸BISThird Party Electrical Signoff Compliance Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOK TO ISSUES TCO FOR 45 DAYS AS PERREDA SHEHATA. OCCUPANCY NOT TO EXCEED74 PEOPOLE ON ANY FLOORS1
02/11/2021302332964Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT32
03/23/2022322018044Open ↗
12/17/2019322018044Open ↗
12/12/2019322017330Open ↗
Showing 3 of 32 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/16/2022310041594Open ↗
09/23/2020322017330Open ↗
▸Filing & Intake Forms55
▸BISBOROUGH INTAKE FORM23
03/18/2020302332964Open ↗
03/02/2020302332964Open ↗
02/22/2020302332964Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION18
05/07/2021321095097Open ↗
05/07/2021321095097Open ↗
04/06/2021321095097Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET12
06/03/2024321995677Open ↗
12/11/2019322017330Open ↗
04/09/2019321953007Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/03/2024321995677Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
02/11/2022310041594Open ↗
02/11/2022310041594Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
02/11/2022310041594Open ↗
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* FIRE STOPS 27-3451
02/11/2022310041594Open ↗