LL97 CoveredRent Stabilized6 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: BEEKMAN MANSION INC · 9,038 sf lot · 8.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 13 docs
Floor 219p · 2 filings · 20 docs
Floor 119p · 2 filings · 20 docs
Mezzanine2p · 1 filing · 3 docs
Site & exteriorUnder Construction20p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES, INC.1209/25/2026
BROWN HARRIS STEVENS1107/08/2026
BEEKMAN MANSION INC C O BHS603/21/2026
PROPERTY OWNER503/21/2026
439 EAST 51 STREET203/21/2026
BHS103/22/2026
MYHOME103/21/2026
NYCHA103/21/2026
PHOENIX BRIDGING INC DBA PHOENI103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING803/21/2026
DIRECT ACCESS EXPEDITING, INC.603/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
BOYD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIX SPOFFY LLCGeneral Contractor603/21/2026
WEST NEW YORK RESTORATION OF CTGeneral Contractor607/08/2026
BREND RESTORATION LLCGeneral Contractor209/25/2026
RUSSELL DYSONElectrical103/21/2026
VAN KLEECK, ADAMElectrical103/21/2026
BREND RESTORATION SRVCGeneral Contractor104/09/2026
GS ELECTRIC INCElectrical103/22/2026
WALTER J.GRANDE P & H INCPlumbing107/08/2026
JORDAN, JOSEPHElectrical103/21/2026
JOSEPH SORTINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688111/07/2025
A2 ARCHITECT, PC2504407/31/2023
Building Lifecycle
All (109)Filed (12)Permit Issued (11)Signed Off (2)Facade (FISP) (13)Violation (48)Inspection (3)Special Inspection (20)
09/24/2026
Permit issued — Sidewalk Shed
M01290966-I1-SH
08/24/2026
Filed — Alteration
TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01290966-P1
05/04/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01318142-P1
03/10/2026
Permit issued — General Construction
M01285829-I1-GC
12/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2025
Permit issued — Suspended Scaffold
M01318142-I1-SC
11/12/2025
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01318142-I1
11/07/2025
Filed — Alteration
Facade and exterior repairs as per drawings. No change in use, egress or occupancy is involved under this application.
M01285829-I1
09/24/2025
Permit issued — Sidewalk Shed
M01290966-I1-SH
09/23/2025
Filed — Alteration
TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01290966-I1
09/11/2025
Special inspection requirement — Final
Robert Bates
09/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
01/03/2024
Permit issued — General Construction
M00869545-I1-GC-CX
12/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/01/2023
Special inspection requirement — Air barrier - visual inspection
Ann Macklin
08/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ann Macklin
08/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ann Macklin
08/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
08/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
08/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
08/01/2023
Special inspection requirement — Mechanical Systems
Ann Macklin
08/01/2023
Special inspection requirement — Final
Ann Macklin
07/31/2023
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 441 ON THE FIRST AND SECOND FLOORS. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00869545-P1
07/28/2023
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 441 ON THE FIRST AND SECOND FLOORS. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00869497-P1
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
07/25/2023
Special inspection requirement — Mechanical Systems
Ann Macklin
07/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
07/25/2023
Special inspection requirement — Final
Ann Macklin
07/25/2023
Special inspection requirement — Air barrier - visual inspection
Ann Macklin
07/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ann Macklin
07/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ann Macklin
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
06/28/2023
Cycle 9 facade report signed — SWARMP
06/21/2023
Cycle 9 facade inspection completed
05/25/2023
Permit issued — Plumbing
M00869497-I1-PL
05/24/2023
Permit issued — General Construction
M00869545-I1-GC-CX
05/12/2023
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 441 ON THE FIRST AND SECOND FLOORS. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00869497-I1
05/12/2023
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 441 ON THE FIRST AND SECOND FLOORS. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00869545-I1
02/08/2023
Cycle 9 facade report submitted
11/03/2022
Violation issued (ECB, closed)
Local Law
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2021
Violation issued (ECB, closed)
Construction
08/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/18/2021
Signed off — Alteration
INSTALLATION OF 64 LF HEAVY DUTY SIDEWALK SHED WITH 300 & 600 PSF RATING FOR MATERIAL & DEBRIS STORAGE AS PER PLANS DURING FACADE REPAIR. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00167640-I1
03/18/2021
Signed off — Alteration
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS DURING FACADE REPAIR. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00167665-I1
04/15/2020
Permit issued — Sidewalk Shed
M00167640-I1-SH
04/15/2020
Permit issued — Supported Scaffold
M00167665-I1-SF
03/16/2020
Violation issued (ECB, closed)
Local Law
12/06/2019
Filed — Alteration
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS DURING FACADE REPAIR. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00167665-P1
12/06/2019
Special inspection requirement — Final
MARCH CHADWICK
06/05/2019
Filed — Alteration
INSTALLATION OF 64 LF HEAVY DUTY SIDEWALK SHED WITH 300 & 600 PSF RATING FOR MATERIAL & DEBRIS STORAGE AS PER PLANS DURING FACADE REPAIR. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00167640-I1
06/05/2019
Filed — Alteration
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS DURING FACADE REPAIR. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00167665-I1
06/05/2019
Permit issued — Sidewalk Shed
M00167640-I1-SH
06/05/2019
Permit issued — Supported Scaffold
M00167665-I1-SF
05/15/2019
Special inspection requirement — Final
MARCH CHADWICK
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedBREND RESTORATION LLC09/24/2026
DOB NOWGeneral ConstructionPermit IssuedBREND RESTORATION SRVC03/10/2026
DOB NOWSuspended ScaffoldPermit IssuedBREND RESTORATION LLC11/13/2025
DOB NOWSidewalk ShedPermit IssuedBREND RESTORATION LLC09/24/2025
DOB NOWGeneral ConstructionPermit IssuedFIX SPOFFY LLC01/03/2024
DOB NOWPlumbingPermit IssuedWALTER J.GRANDE P & H INC05/25/2023
DOB NOWGeneral ConstructionPermit IssuedFIX SPOFFY LLC05/24/2023
DOB NOWSidewalk ShedSigned-offA. PETER LUGER CONST INC04/15/2020
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC04/15/2020
DOB NOWSidewalk ShedSigned-offA. PETER LUGER CONST INC06/05/2019
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC06/05/2019
BISOTISSUEDWEST NEW YORK RESTORATION OF CT11/18/2020
BISEQISSUEDWEST NEW YORK RESTORATION OF CT05/27/2020
BISOTISSUEDWEST NEW YORK RESTORATION OF CT04/21/2020
BISPLISSUEDFIVE STAR P&H CO,INC03/04/2020
BISOTISSUEDGIOVANNI RENOVATION CORP02/11/2020
BISPLISSUEDBROOKLYN MECH WORKS CORP09/13/2019
BISOTISSUEDWEST NEW YORK RESTORATION OF CT06/10/2019
BISEQISSUEDWEST NEW YORK RESTORATION OF CT06/05/2019
BISOTISSUEDPYZNAR CONSTRUCTION INC04/12/2019
BISPLISSUEDBROOKLYN MECH WORKS CORP03/08/2019
BISOTISSUEDPYZNAR CONSTRUCTION INC03/01/2019
BISPLISSUEDA & C HTG SERVICES, INC11/08/2018
BISBLISSUEDA&C HEATING SERVICES INC11/08/2018
BISPLISSUEDFIVE STAR P&H CO,INC08/28/2018
BISOTISSUEDHOMECREST INC07/19/2018
BISPLISSUEDFIVE STAR P&H CO,INC08/25/2017
BISOTISSUEDHOMECREST INC08/18/2017
BISPLISSUEDMILLENNIUM MECH CONT INC12/21/2016
BISOTISSUEDPYZNAR CONSTRUCTION INC12/05/2016
BISOTISSUEDWEST NEW YORK RESTORATION OF CT04/22/2016
BISEQISSUEDWEST NEW YORK RESTORATION OF CT04/18/2016
BISOTISSUEDRENOVATION BY MY HOME INC03/07/2016
BISPLISSUEDNICE PLUMBING CORP03/01/2016
BISOTISSUEDRENOVATION BY MY HOME INC02/29/2016
BISOTISSUEDWEST NEW YORK RESTORATION OF CT02/08/2016
BISEQISSUEDWEST NEW YORK RESTORATION OF CT10/05/2015
BISOTISSUEDWEST NEW YORK RESTORATION OF CT09/11/2015
BISPLISSUEDATTACK PLUMBING INC02/26/2015
BISOTISSUEDINTERBORO PROPERTY MGMT01/16/2015
+ 21 more permits on file
1 project · most recent 07/31/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/31/2023Permit IssuedFIX SPOFFY LLCAir Conditioning Systems
Cooling
York AE36BX21 3 tons · Ahu ×2
YCD30B22S 3 tons · Condensing Unit ×2
1 project · most recent 07/28/2023
Water/Sanitary
FiledStatusContractorScope
07/28/2023Permit IssuedWALTER J.GRANDE P & H INCWater/Sanitary
13 projects · most recent 11/05/2025
General Wiring Boiler Controls
FiledStatusContractorScope
11/05/2025CompleteOPTIMAL ELECTRIC, INC—
09/24/2025Permit IssuedTOP SHELF ELECTRIC CORP—
02/29/2024CompleteT. MCCAFFREY-T. MCGOVERN—
06/26/2023CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
05/26/2023Permit IssuedGS ELECTRIC INCGeneral Wiring
01/31/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/30/2022Permit IssuedSAFETECH ELECL CONTNG CORGeneral Wiring
08/12/2022CompleteNEW YORK EMPIRE ELECL CONGeneral Wiring
05/14/2019CompleteNASH ELECTRIC SERVICES IN—
03/27/2019CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
01/24/2019CompleteE & M ELECTRICAL NY CORPBoiler Controls
10/22/2018Permit IssuedGEORGE HOLNESSBoiler Controls
03/15/2018CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
1 project · most recent 08/24/2026
Sidewalk Shed
FiledStatusContractorScope
08/24/2026Permit IssuedBREND RESTORATION LLCSidewalk Shed
2 projects · most recent 05/04/2026
Suspended Scaffold Tenant Protection Plan 72 Hour
FiledStatusContractorScope
05/04/2026Permit IssuedBREND RESTORATION LLCSuspended Scaffold
11/07/2025Permit IssuedBREND RESTORATION SRVCTenant Protection Plan 72 Hour
1 project · most recent 05/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/04/2026Permit IssuedBREND RESTORATION LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/11/2025FinalRobert Batesprogress
09/11/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
08/01/2023Air barrier - visual inspectionAnn Macklinenergy_progress
08/01/2023HVAC-R and service water heating equipmentAnn Macklinenergy_progress
08/01/2023HVAC-R and service water heating system controlsAnn Macklinenergy_progress
08/01/2023Fire-Resistant Penetrations and JointsAnn Macklinspecial
08/01/2023Fire-Resistant Penetrations and JointsAnn Macklinspecial
08/01/2023Energy Code Compliance InspectionsAnn Macklinprogress
08/01/2023Mechanical SystemsAnn Macklinspecial
08/01/2023FinalAnn Macklinprogress
07/25/2023Fire-Resistant Penetrations and JointsAnn Macklinspecial
07/25/2023Mechanical SystemsAnn Macklinspecial
07/25/2023Energy Code Compliance InspectionsAnn Macklinprogress
07/25/2023FinalAnn Macklinprogress
07/25/2023Air barrier - visual inspectionAnn Macklinenergy_progress
07/25/2023HVAC-R and service water heating system controlsAnn Macklinenergy_progress
07/25/2023HVAC-R and service water heating equipmentAnn Macklinenergy_progress
07/25/2023Fire-Resistant Penetrations and JointsAnn Macklinspecial
12/06/2019FinalMARCH CHADWICKprogress
05/15/2019FinalMARCH CHADWICKprogress
▾Documents — 559 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
08/29/2026M00869497-I1Request digital key ↗
08/29/2026M00869497-P1Request digital key ↗
08/29/2026M00869545-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00167665-I1Request digital key ↗
08/15/2026M00167665-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00167640-I1Request digital key ↗
▸Applications & Permits116
▸BISWORK PERMIT APPLICATION62
11/18/2020123722695Open ↗
03/05/2020123347011Open ↗
02/12/2020123701431Open ↗
Showing 3 of 62 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION51
05/05/2021122545200Open ↗
05/05/2021122727120Open ↗
08/28/2020123722695Open ↗
Showing 3 of 51 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
11/18/2020123722695Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
11/18/2020123722695Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications131
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION75
03/23/2020140828424Open ↗
03/23/2020140828424Open ↗
01/30/2020123701431Open ↗
Showing 3 of 75 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
06/05/2019123720090Open ↗
Showing 1 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/05/2026M00167640-I1Open ↗
08/21/2026M01290966-I1Open ↗
08/21/2026M01290966-P1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00167665-I1Open ↗
08/28/2026M00167640-I1Open ↗
08/25/2026M00869545-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00869497-I1Open ↗
08/28/2026M00869497-P1Open ↗
08/25/2026M00869545-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/05/2019123720090Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/29/2019140828424Open ↗
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
12/16/2019140828424Open ↗
11/06/2019140828424Open ↗
02/13/2019123419283Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING6
01/29/2019140828424Open ↗
Showing 1 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/03/2018123419283Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes8
01/30/2020123701431Open ↗
05/23/2019123722695Open ↗
04/29/2019123892378Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/13/2019123722695Open ↗
▸Environmental & Asbestos36
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
01/30/2020123701431Open ↗
05/23/2019123722695Open ↗
01/29/2019140828424Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026M00869497-P1Open ↗
08/13/2026M00869497-I1Open ↗
08/13/2026M00869545-I1Open ↗
Showing 3 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
06/10/2019123892378Open ↗
10/29/2018123419283Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01285829-I1Open ↗
▸Energy Compliance52
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS31
03/23/2020140828424Open ↗
03/23/2020140828424Open ↗
01/30/2020123701431Open ↗
Showing 3 of 31 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
04/09/2021123701431Open ↗
03/09/2021123722695Open ↗
03/03/2021123892378Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/09/2021123701431Open ↗
03/09/2021123722695Open ↗
03/03/2021123892378Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
05/04/2021122545200Open ↗
04/09/2021123701431Open ↗
03/09/2021123722695Open ↗
Showing 3 of 10 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
05/04/2021122727120Open ↗
▸Approvals, Objections & Sign-offs54
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
05/04/2021122727120Open ↗
05/04/2021122545200Open ↗
04/09/2021123701431Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
01/02/2020122859219Open ↗
08/14/2019123722695Open ↗
08/14/2019123722695Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER1
09/16/2019122859219Open ↗
▸BISFINAL1
03/02/2021123720090Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT41
04/09/2021123701431Open ↗
03/09/2021123722695Open ↗
03/03/2021123892378Open ↗
Showing 3 of 41 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms62
▸BISEFILING COVER SHEET30
01/30/2020123701431Open ↗
06/05/2019123720090Open ↗
05/23/2019123722695Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION22
02/03/2020123347011Open ↗
01/10/2020140828424Open ↗
11/19/2019140828424Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM8
03/23/2020140828424Open ↗
01/02/2020122859219Open ↗
12/31/2019122859219Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/29/2019140828424Open ↗
Showing 1 of 2 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
12/13/2016122859219Open ↗
12/13/2016122859219Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
08/17/2026M01318142-P1Open ↗
08/13/2026M01318142-I1Open ↗
▸DOB NOWCalculations2
08/17/2026M01318142-P1Open ↗
08/13/2026M01318142-I1Open ↗